2015, 04-03 Permit: SW-15000276 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000276 Permit Issued Date: 04/03/2015 Expiration Date: 04/03/2016 Project Description: SEWER Project Name: S GREENACRES Primary Contact: THRAWLEY, DAN J & KATHRYN A Phone: Applicant: THRAWLEY, DAN J & KATHRYN A Address: PO BOX 591 SPOKANE VALLEY, WA 99016 - Phone: Email: SITE INFORMATION: Site Address: Parcel Number: 17323 E MISSION AVE 55073.1547 Assessor's Description: GRNACRS IRR DIST A SE1/4 OF W1/2 B35 Inspection Area: : (509)-477-3675 Owner: THRAWLEY, DAN J & KATHRYN A Address: PO BOX 591 SPOKANE VALLEY, WA 99016 - Phone: Email: Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Zoning: Land Area: 51810 Square Feet CONTRACTOR INFORMATION: OWNER, Exp. 12/31/2015 OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME, WA 00000 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $27.12 $125.00 $152.12 $125.00 CONDITIONS: SVRP Aquifer Boundary: Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate? (use of private well) from DOE prior to permit issuance. Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 04/03/2015 09:43:15 Project Coordinator: Susan Clark SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000276 Permit Issued Date: 04/03/2015 Expiration Date: 04/03/2016 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/03/2015 09:43:15 Project Coordinator: Susan Clark