Loading...
2012, 09-07 Permit: SW-12002150 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002150 Permit Issued Date: 09/07/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: GOBER'S LLC Project Name: S GRN ACRES PH 4 Applicant: GOBER'S LLC Permit Type: SEWER Address: 11215 E TRENT AVE SPOKANE, WA 99206 Phone: 509-924-5372 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 17620 E MISSION AVE 55182.0353 BACON'S ADDITION TO GREENACRES BACONS ADD TO GREENACRES E90' OF N130' OF BLK 3 Water District: Consolidated Irrigation District #19 Owner: BANISTER, GENE A & NANCY L Address: 2324 5TH ST WENATCHEE, WA 98801 Phone: Email: Fire District: Spokane Valley Fire Land Area: 11700 Square Feet CONTRACTOR INFORMATION: General Contractor GOBERL*899L7 GOBER'S LLC 11215 E TRENT AVE SPOKANE, WA 99206 509-924-5372 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Date Printed: 09/07/2012 07:59:59 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002150 09/07/2012 Expiration Date: CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/07/2012 07:59:59 Printed by: IIS APPPOOL\ASP.NET v4.0