2009, 06-29 Permit App: 09001816 Pole BldgProject Number: 09001816 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/29/2009 Page 1 of 2
Project Information: s � :: ott :
Permit Use: 30 x 24 POLE BLDG Contact: HANCOCK, JOHN H & SHIRLEY A
Address: 17621 E MISSION AVE
C - S - Z: SPOKANE VALLEY, WA 99216
Setbacks: Front Left: Right: Rear: Phone: (509) 475-6676
Group Name:
Site Information: Project Name:
gge,,
Plat Key: Name: GREENACRES IRR DISTRICT A District: East
Parcel Number: 55073.1657
Block: Lot:
SiteAddress: 17621 E MISSION AVE
Location:: CSV
Owner: Name: HANCOCK, JOHN H & SHIRLEY
Address: 17621 E MISSION AVE
SPOKANE VALLEY, WA 99016-854
Zoning: R-3 SF Res District
Water District: 134 CONSOLIDATED ID #19
Area: 122,325 Sq Ft Width: 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Hold: [1
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Septic Sys Review
Originally Released: 6/22/2009 By: tmelbourn
Released By:
EMAILED 6/25/09
Originally Released: 6/29/2009 By: LHALSEY
Landuse/Zoning/HE Conditions
Permits:
Released By:
Paving was not required. The applicant revised the application to reflect that the structure would not be
used for daily use vehicle storage but rather for storage of equipment associated with his hobby farm -
Ibarlow 6/26/09
Operator: JD
Originally Released: 6/26/2009 By: lbarlow
Printed By: jmm
Print Date: 6/29/2009
Project Number: 09001816 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/29/2009
Contractor: OWNER
Description
POLE BDLG
Grp Tvpe
U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Building Permit
Page 2 of 2
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Notes Su Ft Valuation Sq Ft Valuation
720 SQFT 720 $13,680.00 720 $13,680.00
POLE BLDG
Totals: 720 $13,680.00 720 $13,680.00
Units Unit Desc Fee Amount
1 SELECT $237.25
1 SELECT $59.31
1 SELECT $4.50
Permit Total Fees:
$301.06
Thi permit is granted based on the identified use of a shop and storage - not a garage for daily use
vehicles. A paved driveway is not required for a shop/storage building.
If the structure is used as a garage for the storage of daily use vehicles a 12' wide paved driveway that
has access to a public street shall be required.
FLORA ESTATES -REFER TO ADE -19-06 FOR LOT WIDTH/FRONTAGE-MH
FLORA ESTATES -SEE FILE ADE -19-06 FOR LOT FRINTAGE/WIDTH-MH
Payment Summary
Permit Type
Building Permit
Fee Amount Invoice Amount
$301.06 $301.06
Amount Paid
$80.31
$301.06 $301.06 $80.31
Amount Owing
$220.75
$220.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 6/29/2009
Spokane
ValleyN
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@ spokanevallev.ora
PERMIT NUMBER:
(Staff Use Only)
PERMIT FEE:
CITY
BY:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
ACCESSORY BUILDING
NEW CONSTRUCTION 0 ADDITION/REMODEL
0 DECK Ef OTHER
SITE ADDRESS: I ; )11 ) SS !Dal
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME:
ADDRESS:
CIrv:
PHONE:
I4l l 411 (OCil 1
6 to -Q h Ac k?) /
C- Of) -Lt)> 667"
CONTACT NAME:
STATE:
FAX:
WA
ZIP:
990/6
CELL:
Sock- c( -)s» C6)&
PHONE: Sli � Lt 7 S"L( 7 6
CONTRACTOR NAME:
FAX: CELL:
MAILING ADDRESS:
CITY:
Co
STATE:
ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
PROPOSED USE:
4r6151
Effective October 28, 2007 Page 1 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.l.doc
****YOU MUST COMPLETE THE FOLLOWING****
Height to Peak:
1.
Dimensions:
Jox, 2- `k
No. of Stories:
t
Total Habitable
Space: (.) A_
Main Floor
FT:
Upper -F\IQor SQ
FT: N 1 Pt
Unfinished Basement
SQ FT: IJ I A-
Finished Basement
SQ FT: NJ 1 f
Garage SQ FT: (,670)
'120 u
Deck/Covergd Patio
SQ FT: r1 1 et-
Impervious urface
Area: 1'.J \ -
30% Slopes on
Property: ti�
No. of
Bedrooms: N) 11-
Construction
Type: POLE
Heat Source:
t31 A-
Sewer or
Septic: ►� 1 a
TOTAL COST OF PROJECT: $
LJ000
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date:
Method of payment: ❑ Cash Ltd Check ❑ Visa ❑ Mastercard
Bankcard #:
Authorized Signature:
(c -L
EXP: VIN#:
Effective October 28, 2007 Page 2 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.l.doc
*Wane
Valley®
For City Use Only
PLUS Project Number
Project Address
.t
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV 9/07
Lad
n• >-
00
cn2
CA LJ
5m
w
• )-
3mn Alm3doma3pri aomil •xotmmm
jt
gi'
ALEGdOthinNO 30PCLA ")(OV
ei`t,
PLANNING DEPT. APPROVED
ij—