2014, 03-13 Permit: SW-14000147 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000147
Permit Issued Date: 03/13/2014
Expiration Date: 03/13/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
S GREENACRES
MUELLER JACKHAMMER
509-534-7143
Applicant:
Address:
Phone:
Email:
MUELLER JACKHAMMER
3826 E 32ND
SPOKANE, WA 99223
509-534-7143
SITE INFORMATION:
Site Address:
Parcel Number:
17711 E MONTGOMERY AVE
55072.0417
Assessor's Description: GREENACRES IRRIGATION DISTRICT BEG AT
A PT ON S LN OF TR 2, 330.17FT W OF SE COR
THEREOF; TH N 345FT; TH W 20.67FT; TH N
165.05FT TO HIGH BK OF SPOKANE RIVER; TH
SWLY ALG SD BK TO PT 402.00FT N OF
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Consolidated Irrigation
District #19
EMTMAN LIVING TRUST, JOHN & MARY
17711 E MONTGOMERY AVE
SPOKANE VALLEY, WA 99016
Fire District: Spokane Valley Fire
Land Area: 73650 Square Feet
CONTRACTOR INFORMATION:
MUELLJI060N6, Exp. 08/22/2015
MUELLER JACKHAMMER INC
3628 E 32ND AVE SPOKANE, WA 99223
509-534-7143
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1
$125.00 $125.00
$125.00
CONDITIONS:
Possible FEMA Flood Zone
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Possible Shoreline On Site
Possible Floodplain
Date Printed: 03/13/2014 10:26:01 Project Coordinator: Laurie Carver
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000147 Permit Issued Date: 03/13/2014
Expiration Date: 03/13/2015
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/13/2014 10:26:01 Project Coordinator: Laurie Carver