Loading...
2014, 05-13 Permit: SW-14000623 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000623 Permit Issued Date: 05/13/2014 Expiration Date: 05/13/2015 Project Description: SEWER CONNECTION Primary Contact: BOWDITCH, JOHN Phone: Applicant: BOWDITCH, JOHN Address: 17725 E MONTGOMERY AVE GREENACRES, WA 99016-8519 Phone: Email: SITE INFORMATION: Site Address: Parcel Number: 17725 E MONTGOMERY AVE 55072.0412 Assessor's Description: GREENACRES IRR DIST A PTN OF BLK 2 & PTN OF TRACT U & INC PTN OF VAC 60FT STP WITHIN FOL DESC: BEG AT SE COR OF BLK 2 TH W ALG N LN OF MONTGOMERY AVE 170FT TO TRUE POB TH N PAR TO E LN OF TR Inspection Area: : (509)-477-3675 Owner: BOWDITCH SR, JOHN ARTHUR Address: 17725 E MONTGOMERY AVE GREENACRES, WA 99016-8519 Phone: Email: Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Zoning: Land Area: 55259 Square Feet CONTRACTOR INFORMATION: OWNER, Exp. 12/31/2015 OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME, WA 00000 509-218-7562 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/13/2014 10:28:35 Project Coordinator: Laurie Carver SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000623 Permit Issued Date: 05/13/2014 Expiration Date: 05/13/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/13/2014 10:28:35 Project Coordinator: Laurie Carver