2012, 06-13 Permit App: APR-2012-0031 ApproachSpokane
Valley
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenterftspokanevallev.orq
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
APPROACH PERMIT APPLICATION
-Il
PROJECT ADDRESS:
START DATE:
ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME:
R<CAL— 0L b04 -C aw+\
MAILING ADDRESS:
CITY: Sf o JL . ()ct Lk'e/ STATE: W ,Y .
IA)'
CONTACT PERSON NAME: Cn yt
ZIp: ( 90 (6
PHONE: (a0 G G r - YO G
Ax: CELL:
CONTRACTOR NAME: WV., C r vk 0_ is cje
MAILING ADDRESS: J
C) S -ox. 3`{L
CITY: cS)p 1.1k CI lLl k� STATE: —L .1)
ZIP: 93V.9
PHONE: ,26)9 -66 ( 410 5 FAX:
CELL:
CONTRACTOR LICENSE No.: 6 0) G 7'7/(14, ( EXPIRES: 6-3 b -/2 CITY BUSINESS LICENSE NO.:
PROJECT DESCRIPTION (Please Provide Site Sketch)
J Residential Driveway 0 Commercial/Industrial Driveway
Existing Curb & Gutter Rural Road Section
Culvert Installation Q Sidewalk Repair/Construction
El Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
r) «4,1j (t_j Date: / Z
Updated 1-11-11 Page 1 of 1
http://www. spokaneva Iley. org/filestorage/ 124/938/210/948/ 1496/Approach_ Permit_1-11-11.doc
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
❑ Other (please describe below)
w
z
w
ELI
CURB
J
w
W
DISTANCE FROM
INEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
Li FT (SEE TABLE)
CONCRETE
APPROACH
1-4'4— THROAT WIDTH LLL FT ----1-4'
WING (SEE TABLE) WING
STREET NAME
of
tri
EDGE OF 1
ASPHALT
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
I ---THROAT WIDTH IT1FT --I
(SEE TABLE)
STREET NAME
CURB
RETURN
NIF CORNER LOT,
DISTANCE FROM
CURB RETURN
ri FT (SEE TABLE)
RADIUS
RETURN
vtti� Ate
STREET WITH ASPHALT EDGE
\IF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
Q FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
O Sidewalk
ft wide
ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
❑ Other (please describe below)
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
Li FT (SEE TABLE)
CONCRETE
APPROACH
I--4'---THROAT WIDTH FT --.1
WING (SEE TABLE) WING
STREET NAME
EDGE OF'
ASPHALT
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
CURB
RETURN
Ni
IF CORNER LOT,
DISTANCE FROM
CURB RETURN
Fl FT (SEE TABLE)
15' RADIUS
THROAT WIDTH 77 FT ---I
(SEE TABLE)
STREET NAME
RADIUS
RETURN
okAA AO
STREET WITH ASPHALT EDGE
`IF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
=FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'