Loading...
2013, 11-01 Permit App: BLD-2013-2271 Storage BldgSpokane Valley yaw- w 1 '✓^ 1—fr- l I mmunity Development Department • ermit Center 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: Spokane Valley, WA 99206 Tel: (509) 720-2540 --- T-EE.6" Fax: (509) 688-0037 permitcenter(@saokanevallev.or Project # I RECEIVED RESIDENTIAL CONSTRUCTION PERMIT (Staff Use Only) NEW CONSTRUCTION DECK Z ADDITION/REMODEL ❑ ACCESSORY BUILDING ❑ OTHER; CSV PERMIT CENTER SITE ADDRESS:18008 E MONTGOMERY AVE ASSESSORS PARCEL NO.:55074.3102 LEGAL DES AUDITORS #9303290244 BK 9 PG 40 BEING A PTN OF BLK 7 OF GREENAC BUILDING OWNER NAME:MARKANDERSON El` #_777. RI.PTION:TR-B OF S"F2'-721 ES IRR DISTA NAME: MARK ANDERSON ADDRESS:18008 E MONTGOMERY AVE. CITY:SPOKANE VALLEY PHONE:509-891-0772 CONTACT NAME:MARK ANDERSON FAX: STATE:WA Zip:99016 cELL:509-638-8835 PHONE:509-891-0772 FAX: CONTRACTOR NAME:ZIEGLER LUMBER COMPANY cELL:509-638-8835 MAILING ADDRESS:17002 EAST SPRAGUE AVENUE CITY:SPOKANE VALLEY PHONE:509-922-1800 CONTRACTOR LICENSE NO.:CCO1ZIEGLL*316JG NO.: STATE:WA ZIp:99016 FAX: CELL: EXPIRES:8/3/15 CITY BUSINESS LICENSE DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: LEAN TO ADDITION FOR STORING LAWN AND GARDEN TOOLS AND MATERIALS. SIMILAR CONSTRUCTION AS THE EXISTING BUILDING Height to Peak:12F- Main Floor SQ FT:N/A Garage SQ FT:480 No. of Bedrooms:N/A ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Dimensions:16x30 No. of Stories:1 Total Habitable Space:0 Upper Floor SQ FT:N/A Unfinished Basement SQ Finished Basement SQ FT:N/A FT:N/A Deck/Covered Patio SQ Impervious Surface 30% Slopes on FT:N/A Area:480 Property: N/A Construction Type:PoLE TOTAL COST OF PROJECT: $7000 Heat Source:N/A Sewer or Septic:N/A DISCLAIMER The permitted verifies, ac<^owledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable ware-. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit -Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Updated 1-11-11 Page 1 of 2 D:\Feb9__2011\Documents\Permit _ YardShed.docx Signature • Date: Updated 1-11-11 Page 2 of 2 D:\Feb9 2011\Documents\Permit YardShed.docx • SparZkane Valley® • Target Date sheet For City Use Only PLUS Project Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 / TOO Project #116- --- RECEIVED 3)C /12cT NUV 0 1 2013 1 01,7 CSV PERMIT CE TER REV. #{ PLANNING DEPT. AP ROVED BY. 044 "AL DATE: ////20/; e 7 Fi /o3- F -TO