Loading...
2008, 07-31 Permit App: 08002748 Patio CoverProject Number: 08002748 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/31/2008 Page 1 of 2 Project Information: Permit Use: PATIO COVER Setbacks: Front Site Information: Plat Key: Left: Right: Rear: Name: Range Contact: EXCALIBUR STEEL STRUCTURES INC Address: PO BOX 14991 C - S - Z: SPOKANE, WA 99214-0991 Phone: (509) 921-1300 Group Name: Project Name: District: East Parcel Number: 55074.3402 Block: Lot: SiteAddress: 18116 E MONTGOMERY AVE Owner: Name: KITCHEN, GARY & EVELYN K Address: 18116 E MONTGOMERY ST SPOKANE VALLEY, WA 99016 Location:: CSV Zoning: R-3 Water District: Area: 7,149 Sq Ft SF Res District Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: [_ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released, By: Originally Released: 7/21/2008 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: SEE CONDITION Originally Released: 7/31/2008 By: mharnois Operator: JD Printed By: JD Print Date: 7/31/2008 Project Number: 08002748 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/31/2008 Page 2 of 2 Building Permit Contractor: EXCALIBUR STEEL Firm: EXCALIBUR STEEL STRUCTURE Address: PO BOX 14991 Phone: (509) 921-1300 SPOKANE, WA 99214-0991 Building Characteristics Building Height 13 This Application: Total Project: Description Grp Type Notes Sa Ft Valuation Sq Ft Valuation COV DECK R-3 VB 400 $6,000.00 400 $6,000.00 Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 400 $6,000.00 400 $6,000.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $125.25 $4.50 $50.10 $179.85 Notes: ., THE COVER FOR THE PATIO MUST NOT BE ATTACHED TO THE HOUSE -MH Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $179.85 $179.85 $179.85 $179.85 $0.00 $179.85 $0.00 $179.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 7/31/2008 e Valley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 992060 (509)688-0036 FAX: ( )688-0037 www spokanevalley.or SITE ADDRESS: ASSESSORS PARCEL NO: PERMIT NUMBER: X- Z i PERMIT FEE: 4ew Construction ❑ Addition/Remodel ❑ Other: LEGAL DESCRIPTION: Contact Person Phone: `9 Z — ( 30 Describe the scope of work in detail: o� Proposed Use: **************The followin MUST be com DIMENSIONS: ><- FLOOR SQ. FTG: HEIGHT TO PEAK: MAIN FLOOR TO SQ. /1 FTG: FINISHED BASEMENT SQ. FTG: # OF BEDROOMS: GARAGE SQ. FTG: lete: CONSTRUCTION TYPE: Contractor: Name: E.X C •\ ` c. 5Z Address: 0 City: S. z l-tk Phone: Zi _ ontractor Lic No: 3- 1 -- City Business Lic. No: Cost of Project: $ k write N/A if not a # OF STORIES: Accessory Bldg Deck licable UNFIN BASEMENT SQ. FTG: • DEQ COV: PATIO Q. FTG: HEAT SO 'CE: t'ielci State: 1,3A Zip: 79 Z Fax: qZl (7I8 Exp Date: 2 ********************** TOTAL HABITABLE SPACE: 00 a-- IMPERVIOUS 'IMPERVIOUS SURFACE AREA: 30% SLOPES ON PROPERTY: SEWER OR SEPTIC? -V)o s* cc w. -sr is for ion of or on a he The pnis/will verifies, acknowledges aband .agrees)OOwnership of this eir re that: 1) If this City of Spokane Valley tPermit inure tot the property owner.n3)tThe dwellingaisbe servederty w er potable permission to represent the ) in full y is the property owner f Valley Development Code. Referenced codesareavailable forll construction is to review at the City of done in full compliance with the City of SpokaneY for anyviolation of federal, state or Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval before local laws, codes or or •' - : - -s. 6) Plans or additional information may be required to be submitted, and subsequently approved this application can 'e proses -d. SIGNATURE: Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 DATE: - ❑ Mastercard 0 VISA Expires: VIN#: 8 1 Sileokane 11703 E Sprague Ave Suite B 3♦ Spokane Valley WA 99206 ♦ 509.688.0036 4 Fax: 509.688.0037 • Valley® la 13 la Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. Show the height of any proposed buildings or accessory structures. Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. ❑X Egress windows: Provide at least one window or exterior door approved for 13 emergency escape or rescue from basement and in every room for sleeping. Floor framing details: Joist type, size, spacing and installation details. ❑X Roof framing plan and details ❑X Furnace and hot water heater location �X All header locations: type, size and connections Foundation plan Insulation information 13 MX Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage Spokane jUalley Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New projec(D Previous pre -app meeting 0 Plan revisions El Transmittal Date: Tuesday, July 15, 2008 Site Address: 18116 E MONTGOMERY AVE Parcel Number: 55074.3402 Zoning: R-3 Fire District: FD 01 Water District: Project Number: 08002748 Applicant: e-mail: Contact: e-mail: Contractor: EXCALIBUR STEEL STRUCTURES PO BOX 14991 SPOKANE, WA 99214-0991 (509) 921-1300 EXCALIBUR STEEL STRUCTURES PO BOX 14991 SPOKANE. WA 99214-0991 (509) 921-1300 Owner: KITCHEN, GARY & EVELYN K 18116 E MONTGOMERY ST SPOKANE VALLEY, WA 99016 e-mail: Occupant: e-mail: EXCALIBUR STEEL STRUCTURES Arch/Engineer: PO BOX 14991 SPOKANE, WA 99214-0991 (509) 921-1300 e-mail: �� � •_7 �� FYI JUL 1'32008 dill%I! I i Project PATIO COVER Description: Building Landuse APPLICATION l Engineer Utilities Health Fire Dist Assessor SITE 1 PLAN S 1 Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane jUalley For City Use Only _y PLUS Project Number `_) ' (-). ' t 4c. Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. ,p j • / , Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 /40/0T6 0A4 E g -y 0 c. 1 4-7 68 ' LYNN -E. IS vco Mo 07 Go 5S7 vew�.f ZL Pro Po seal Za xZo Cooe-y 123' La-Z- S 17 0 . : B (c' LA WAMBEKE ENGINEERING Daniel Wambeke, P. E. 2913 East 61st Court Spokane, WA 99223 Telephone: 509-443-6186 • Fax: 509-448-6582 • dwambeke @msn.com July 15, 2008 Mr. Paul Young EXCALIBUR CONTRACTING, INC. P. O. Box 14991 Spokane, WA 99214-0991 SUBJECT: 20' X 20' X 10' OPEN POST FRAME BUILDING FOR LYNN & GARY, 18116 E. MONTGOMERY, SPOKANE VALLEY, WA Dear Paul: This post frame building has been sold to Lynn and Gary and will be erected according to the standard post frame building plans I have prepared for Excalibur Contracting, Inc. The building is designed for 30 PSF roof live load, 85 MPH wind speed, Exposure B and Seismic Design Category C, 2,000 PSF allowable soil bearing pressure. The building has posts spaced at 10'0" o. c. and 4:12 pitch roof trusses. The standard post frame building plans do not address open buildings. I have checked the requirements for this building and detail the structural elements below: • Roof trusses — Use two 20' span manufactured roof trusses at the single center roof crossing. Use single gable end trusses at the endwalls of the building. Trusses shall be designed and certified by the truss manufacturer. • Roof purlins — Use 2" x 6" DF -L #2 purlins @ 24" o. c. Hang purlins from trusses with standard joist hangers. • Sidewall posts — Use 6" x 6" Hem -Fir #2 treated posts embedded in 20" diameter x 3'0" deep concrete footings. • Corner posts - Use -6" x 6" Hem -Fir #2 treated posts embedded in 20" diameter x 3'0" deep concrete footings. • Framing and connection details — Use framing and connection details from the standard post frame building plans for all framing details. Please feel free to contact me if you have any additional questions about the design of this building. cerely, 6iffeL Daniel Wambeke, P.E. Enclosures DW:dw EXPIRES ( t— UP -&9 Designer of Small Structures, Post Frame Buildings, Foundations, Light Gauge Steel Framing and Grain Storage Systems A 0 Mous E u it D (-VRL111 VVIVIVGt..I1WY I'IL.IIIL,LO• A), PURLINS MAY BE HUNG V. NAILS EACH GIRT OFF THE TRUSS TOP CHORD FACES W/ STANDARD SIMPSON J❑IST HANGERS OR EQUAL. B), PURLINS MAY BE BUTTED AND NAILED W/(2) 16d NAILS (FLAT) INTO EACH PURLIN. C, PURLINS MAY BE LAPPED AND NAILED W/(3) 16d NAILS ON CONNECTION METHODS w 'B' AND 'C', TOENAIL TYPICAL GIRT CONNECTION w (1 i 6dSIDOF EACH TOP CHORD MEMBER .NOTES FOR FLOOR PLAN - Q1 INTERIOR FRAME WOOD POSTS, SEE POST SCHEDULE THIS SHEET Q GABLE WALL POSTS - 6' X 6' TYPICAL DOOR POSTS - 4' X 6' TYPICAL FOOTING DIMENSIONS, B = l' -8'I D = 3'-0' MAXIMUM POST SPACING 12' 0' (3 PURLINS @ 24' O.C., BEARING OR JOIST HANGERS (TYPICAL) w SPANS 12' TO 60' Hai a } ¢ a DOUBLE TRUSSES REQUIRED VOLUME, -YD 1&- NOTES FOR SECTION A -A NA 6" X 6" E3O S1 TYPICAL PURLIN, SEE FLOOR -q-------- u - "IJ --- LD Z ::) N �¢ 10'-0 A 2'X6'@ 24' O.C., 12' BAYS = p S DF -L #2 GIRTS FLAT @ 24' 0. C. zra J zw ' 16-0' LL SS EXTEND POST TO TOP OF PURLIN 3-0 w w ROOF FASTENED TO PURLINS WITH __._ _ 10'-0 18-0' 1 1/2' LONG WOODFAST TEKS. 3-0 NO WALLS FASTENED TO 20 D! J aw (L 21 WOODFAST TEKS, NO- 0.27 12-0" Q -w .o . > �J 0-w - NO 0.41 1 > � o 07c A ---NO -12;0,•- -17.0•: XJ o X� <U X� ly 0.41 12.0" 14'-0" 6" X 6'• W/2 X 6 6•' X 8" W/2•' X 6•' 26 26 cure (L a w a 12-0' 16'.0" 12.0"--18'-0"�6"X8"VIIl2"'X6" 6" X 10•• Wl2•• X s^ --- 26 =),T w a D 1Z -W' 20•-V' 26•• a• -z" :3(n POST/FOOTING - DOUBLE TRUSSE LIVE LOAD COLUMN FOOTING KNEE BRACE - SPACING "If' W X D M rn A 'T• 2 fn U Z. ?a 3 &-&1 6" X W 26" T.0" NO 0.41 Za ----- 3'-0" ------ NO - --- 10'-0" ---- 10'-0" ----- 6" X 6" z. �0. J} J� I 6" X 6" VU%2" X 6" 6"XB"1Nl2 X6 �F a~ M} 0.41 0.41 10'-0 a I n - 0.41 10'-0" 18'-0" 6" X 8`• W!2" X 6" o U Li DC7 CD I -- -- ---- 20'-0" ---6;i-W-2-'-'X-6"- 6" X " ----...._--- 26" 3'-0" o ZD o IV- 22-0" 6 X 10 W/2•' X 6" 26 - 3-2' NO d U X - 26 0 X Nom• (U 8'-0" 6" X 6" 28" T -V' NO " 4 (u .0 N 10,,0„ &7R 6" 28" 3'-0" NO 0.47 cu wui ---._..- 6 X 6 W/2 X 6" 28 3 -0" NO 0.47 12-0 V) � 6" X 8" cu� cn 3-0 NO _ 0.47 12.0 16-0" __- 6 XS••W_!2 X6 28 ■ba SINGLE TRUSS 0.47 \-® - \�® PLAN VIEW N.T.S. S�. 4 SEE BUILDING SECTION A -A N.T.S. DETAIL 1 - TRUSS COLUMN CONNECTION, PURLIN SUPPORT 1 N.T.S. 1„ 1 � - 2 - 16d NAILS 111 6„ 8„ OR 10" POST I� 111 SS I I 1 9 •� 1� Z v 'B" DIA IT, REQUIRED VOLUME, -YD 1&- NOTES FOR SECTION A -A NA 6" X 6" E3O S1 TYPICAL PURLIN, SEE FLOOR NO _ u PLAN FOR SIZE "IJ S2 TRUSS DESIGN BY OTHERS LD Z ::) S3 2' X 6' @ 24' O.C., 10' BAYS 10'-0 A 2'X6'@ 24' O.C., 12' BAYS = p S DF -L #2 GIRTS FLAT @ 24' 0. C. 18 18 0 U S4 CONCRETE FOOTING, SEE SCHEDULE 16-0' LL SS EXTEND POST TO TOP OF PURLIN 3-0 w w ROOF FASTENED TO PURLINS WITH __._ _ 10'-0 18-0' 1 1/2' LONG WOODFAST TEKS. 3-0 NO WALLS FASTENED TO 20 ^; ? GIRTS WITH I' LONG 6 X10" 21 WOODFAST TEKS, NO- 0.27 12-0" SEE BUILDING SECTION A -A N.T.S. DETAIL 1 - TRUSS COLUMN CONNECTION, PURLIN SUPPORT 1 N.T.S. 1„ 1 � - 2 - 16d NAILS 111 6„ 8„ OR 10" POST I� 111 SS I I 1 9 •� 1� SINGLE OVERHEAD DOOR OPTION FRONT ELEVATION N.T.S. NOTES FOR FRONT ELEVATION Si HALF TRUSS DESIGN BY OTHERS SUPPORT PURLINS @ END TRUSS W/2' X 6' OR 2' X 8' STD J❑IST HANGERS, LOWER TRUSS FOR END OVERHANG, IF REQ'D S2 2' X 10' HEADER S3 2' X 6' GIRTS @ 24' ❑,C., 10' BAYS, DF -L #2 2' X 6' GIRTS @ 24' D.C., 12' BAYS, DF -L #2 S4 2' X 8' FACIA BOARDS S5 TREATED WOOD POSTS, SIZED PER SCHEDULE S6 TREATED 2' X 6' BOTTOM GIRT OR TREATED 2' X 10' BOTTOM GIRT WE POST LAMINATIONS NOTE: 2" X 6" LAMINATE MUST BE A TREATED MEMBER AND 'MUST EXTEND TO THE BOTTOM OF THE FOOTING. LAMINATE MAY BE SPLICED ABOVE MID HEIGHT OF COLUMN NOTES FOR FOOTING DETAIL IS1 TREATED POSTS AS SIZED PER SCHEDULE 2 VIBRATE OR ROD CONCRETE TO OBTAIN FULL BEARING S�3 UNDISTURBED S❑IL FOOTING DETAIL N.T.S. GABLE END TRUSS 8 - 16d NAILS--,,, NOTES FOR CONNECTII7N DEI AIL Si TRUSS TOP CHORDS TRUSS DESIGN BY TRUSS MANUFACTURER S2 PURLIN SUPPORT STRUT 2' X '4' X FULL DEPTH OF TOP CHORD PLUS -'PURLIN, NAIL PURLINS W/(3) 16d NAILS (SD NAIL STRUT TO TOP CHORD W/(3) 16d NAILS EACH SIDE, 0 MANUFACTURED TRUSS. NOTCH POSTS 1-1/2' EACH SIDE TO PROVIDE TRUSS SEAT, SS WOOD POST, SEE POST/FOOTING SCHEDULE,. S6 4 - 40d GALV. NAILS IN PRE -DRILLED HOLES OR 3/4'41 MACHINE BOLT 0 SOLID BLOCKING AT CONNECTION POINTS. (SD TYP. PURLIN, SEE FLOOR PLAN FOR SIZE 0 2' X 6' OR 2' X 8' TOP GIRT 0 4 - 16d NAILS OR 3/4'41 M. BOLT DOUBLE OVERHEAD DOOR OPTION OPTIONAL FRONT ELEVATION N.T.S. , SINGLE SLIDING DOOR OPTION 0PT1.0'iNIA L - FRON, i ELEVA-T-I-O-N- N.T.S. OPTIONAL FRONT ELEVATION N.T.S. I 1l��ell�•�:�\I��:ir_l� S1 TRUSS TOP CHORD, DESIGN BY OTHERS S2 TRUSS BOTTOM CHORD, DESIGN BY OTHERS S3 2' X 6' DFL -L #2 EACH SIDE S4 WOOD POST, SEE P❑ST/FO❑TING SCHEDULE SS 4 - 16d (ALV. NAILS, EACH SIDE 1). KNEE BRACE REQUIRED WHERE SHOWN ON POST/FOOTING SCHEDULE BRACE NOT REQUIRED AT GABLE END TRUSSES. 2). ALTERNATE KNEE BRACE/POST AND TRUSS/POST CONNECTION = USE 3/4'41 THRU BOLTS, EACH LOCATION, N.T.S. BUILDING SPECIFICATIONS: GENERAL - ALL BUILDING CONSTRUCTION SHALL CONFORM TO THE 2006 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC 2006), AND ALL STATE & LOCAL BUILDING CODES. THESE SPECIFICATIONS AND PLANS ARE INTENDED FOR USE IN 30 OR 40 PSF LIVE LOAD, 85 MPH WIND SPEED, EXPOSURE 8 AND SEISMIC DESIGN CATEGORY C. DESIGN LOADS - ROOF LL = 30 OR 40 PSF ROOF DEAD LOAD = 5 PSF* CEILING LL = 0 PSF CEILING DL = i PSF • ROOF OL ALLOWS FOR A MAXIMUM OF 3" THICKNESS OF FIBERGLASS INSULATION. ' MAXIMUM SOIL BEARING PRESSURE = 2,000 PST - MAXIMUM SOIL BEARING PRESSURE IS BASED ON SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL AND CLAYEY GRAVEL SOILS OR BETTER. LESSER' SOIL. CONDITIONS WILL REQUIRE REVIEW AND FOOTING SIZE ADJUSTMENT BY THE ENGINEER. CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH F'c = 2,000 psi, 4 SACK MIX FOR FOOTINGS. CAST IN PLACE CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318-05. WOOD - STRUCTURAL LUMBER SHALL CONFORM TO DF -L /2 OR BETTER BY WWPA GRADING RULES. MAXIMUM MOISTURE CONTENT SHALL BE 19% BY '. WEIGHT. NAILING SHALL CONFORM TO TABLE 2304.9.1 FASTENING SCHEDULE & OTHER APPROPRIATE SECTIONS OF CHAPTER 23 OF THE ISO. ALL _ NAILS INTO PRESERVATIVELY TREATED WOOD SHALL BE HOT -DIPPED ZINC COATED GALVANIZED STEEL, SILICONE BRONZE, COPPER OR STAINLESS STEEL CCA TREATED WOOD SHALL CONFORM TO THE REQUIREMENTS OF AWPA STANDARDS C-16, C-22, C-23, C-24 & C-28. POSTS FOR -. BUILDINGS SHALL BE AS NOTED ON THE PLANS. ALL POST MATERIALS SHALL BE HEM -FIR #2 OR BETTER, FULL DIMENSION AND GRADED BY WWPA GRADING RULES. HARDWARE SHALL BE SIMPSON OR APPROVED EQUAL. ALL BOLTS SHALL CONFORM TO ASTM A307. METAL PANELS MAY BE DELTA RIB STYLE, GALVANIZED OR PAINTED, 29 GAUGE THICKNESS, ASTM A653 STRUCTURAL QUALITY (SQ), Fy = 80.0 ksl. ROOF PANELS SHALL BE FASTENED TO PURLINS WITH PLATED, GASKETED 1 1/2" LONG METAL TO WOOD FASTENERS. WALL PANELS SHALL BE FASTENED TO GIRTS WITH PLATED, GASKETED 1" OR LONGER METAL TO WOOD FASTENERS. PANELS SHALL BE INSTALLED AND FASTENED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. ALTERNATE ROOFING & SIDING APPLICATIONS - BUILDING ROOF MAY BE SHEETED WITH 15/32" O.S.B. BOARD, 1/2" C -DX PLYWOOD OR OTHER APA RATED SHEETING, NAILED O 6" 0. C. W/ 8d OR 10d NAILS. FINISH COVERING FOR SHEETED ROOF MAY BE COMPOSITION ROOFING OVER 30X .FELT, O.S.S. BOARD 1 2" C -DX PLYWOOD 15 32" T-111 " B SIDED WITH 7 16" O.S B NG OVER 15 FELT. BUILDING MAY E / OR 29 GAUGE METAL ROOF, / / W PLYWOOD SIDING OR HARD, -PLANK. LAP SIDING MAY BE INSTALLED OVER BUILDINGAND ND A LL SHEETING. SHEETING SHALL BE FASTENED TO _ GIRTS WITH 8d, NAILS O 6" 0. C., OR 1 1/2" LONG X 16 GA. STEEL STAPLES O 6" 0. C. O PANEL EDGES & INTERMEDIATE FRAMING. SOIL COMPACTION - ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A VIBRATORY COMPACTOR TO 95% OF THE PROCTOR DENSITY AS DETERMINED BY ASTM A1557, METHOD D. TRUSSES SHALL BE DESIGNED BY AND BEAR THE SEAL OF AN ENGINEER REGISTERED TO PRACTICE IN THE STATE OF WASHINGTON TRUSS LOADING: TOP CHORD LIVE LOAD = 30 OR 40 PSF TOP CHORD DEAD LOAD= 5 PSF BOTTOM CHORD DEAD LOAD = 1 PSF TRUSS WEB BRACING INTERIOR OR GABLE END TRUSSES ' _-N❑TES_ FOR TRUSS WE,... RR.ACTNG1 - - TRUSS DIAGRAMS WILL OFTEN REQUIRE WEB MEMBER BRACING, WHICH IS SHOWN ON TRUSS DRAWINGS PIS I= THE METHOD OF TRUSS WEB BRACING SHOWN ABOVE REPLACES 1' X 4' OR 2' X 4' WEB MEMBER BRACING-. FOLLOW THESE INSTRUCTIONS FOR ALL WEB MEMBER BRACING TO REPLACE 'RAT -RUN.' WEB lOd NAILS @ 6' O.C. Od NAILS @ 6' D.C. X 6' OR 2' X 8' X 4' L -BRACE L -BRACE TRUSS WEB MEMBER TRUSS WEB MEMBER 'SHEATHING REQUIRMENTS THE FOLLOWING MINIMUM ROOF DIAPHRAGM REQUIREMENTS ARE NEEDED, ■ ROOF STEEL, 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS, #16 x 1 1/2' AT 9' O.C. (NEXT TO HIGH RIB) ■ CAVE .AND RIDGE PURLIN SCREWS, #14 xl 1/2' AT BOTH SIDES DF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEEDED, ■ ENDWALL STEEL, 29. GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS, 010 x 1 1/2' @ 9' D.C. (NEXT TO HIGH RIB) ■ BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS, #14 x 1 1/2' @ BOTH SIDES OF EACH MAJOR RIB. SECTION B -B SECTION B -B DIAPHRAGM SCREWS AT INTERIOR TRUSSES AT GABLE END TRUSS L j(/-}������ ENDWALL DOOREHEADERS &WGABLEAEND GIRT TOPS CHORD, CAVE & RIDGE PURLINS ON ROOF S1 S3 S2 dG 9 DIAPHRAGM SCREWS] TYPICAL SCREW PATTERN, EXCEPT AS S4 � NOTED ABOVE i. F- -' STEEL SHEETING SCREW PATTERNS N.TS S5 TYPICAL RUSS BOTTOM CHORD BRACING NOTES FOR TRUSS BOTTOM CHORD BRACING N.T.S. Si GABLE END TRUSS S2 DOUBLE INTERIOR TRUSSES S3 2' X 4' X -BRACING @ 10' 0' O.C. S4 2' X 4' BOTTOM CHORD BRACING @ 10'-0' D.C. OR, AS SPECIFIED BY TRUSS MANUFACTURER I• 1�L SS TOENAIL BRACES TO TRUSSES WITH 3 - 10d NAILS aF 8 - 16d NAILS 2' X 6' X 18' B❑LYING BLOCK CORNER POST - 16d NAILS I ' BOLTING BLOCK DETAIL 3 TYP. GABLE END TRUSS CONNECTION USE BOLTING BLOCKS BELOW ALL CORNER COLUMN GIRTS SPLIT SLIDER DOOR OPTION OPTIONAL FRONT ELEVATION N.T.S. NOTES FOR OPTIONAL FRONT ELEVATIONS S1 HALF TRUSS DESIGN BY OTHERS S2 2' X 10' HEADER UP TO 12' 0' DOORS 2' X 12' HEADER UP TO 20' 0' DOORS 2' X 12' BACKED WITH 2" X 6' UP TO 24' 0' S3 2' X 6' HEADER S4 4' X 6' DOOR POST - 8' THRU 14' WALL HEIGHT W/ 2' X 6' FACER. 6' X 6' DOOR POST - 16' & 18' WALL HEIGHT W/ 2' X 8' FACER, SS DOUBLE 2' X 6' KINGP❑ST TYPICAL 51UE ELEVA I IUN NOTES FOR SIDE ELEVATION N.T.S. S1 2' X 8' HEADER S2 2' X 10' HEADER FOR 10' & 12' SLIDING DOORS 2' X 8' HEADER FOR 8' & SMALLER SLIDING DOORS SPACING 'W' W X D 'B" DIA IT, REQUIRED VOLUME, -YD 1&- 20' 0' MAXIM 6" X 6" 18•' 3'-0" NO _ 0.20 _ 0.20 10'-0 12-0" 14-0" 3.0' 3.0' NO NO -- 0.20 0.20 6"X6" _ 6"X6"W/2 X6 18 18 10'-0 I-- 10'-0 16-0' - -- - 6"X8" -- 20 3-0 SINGLE OVERHEAD DOOR OPTION FRONT ELEVATION N.T.S. NOTES FOR FRONT ELEVATION Si HALF TRUSS DESIGN BY OTHERS SUPPORT PURLINS @ END TRUSS W/2' X 6' OR 2' X 8' STD J❑IST HANGERS, LOWER TRUSS FOR END OVERHANG, IF REQ'D S2 2' X 10' HEADER S3 2' X 6' GIRTS @ 24' ❑,C., 10' BAYS, DF -L #2 2' X 6' GIRTS @ 24' D.C., 12' BAYS, DF -L #2 S4 2' X 8' FACIA BOARDS S5 TREATED WOOD POSTS, SIZED PER SCHEDULE S6 TREATED 2' X 6' BOTTOM GIRT OR TREATED 2' X 10' BOTTOM GIRT WE POST LAMINATIONS NOTE: 2" X 6" LAMINATE MUST BE A TREATED MEMBER AND 'MUST EXTEND TO THE BOTTOM OF THE FOOTING. LAMINATE MAY BE SPLICED ABOVE MID HEIGHT OF COLUMN NOTES FOR FOOTING DETAIL IS1 TREATED POSTS AS SIZED PER SCHEDULE 2 VIBRATE OR ROD CONCRETE TO OBTAIN FULL BEARING S�3 UNDISTURBED S❑IL FOOTING DETAIL N.T.S. GABLE END TRUSS 8 - 16d NAILS--,,, NOTES FOR CONNECTII7N DEI AIL Si TRUSS TOP CHORDS TRUSS DESIGN BY TRUSS MANUFACTURER S2 PURLIN SUPPORT STRUT 2' X '4' X FULL DEPTH OF TOP CHORD PLUS -'PURLIN, NAIL PURLINS W/(3) 16d NAILS (SD NAIL STRUT TO TOP CHORD W/(3) 16d NAILS EACH SIDE, 0 MANUFACTURED TRUSS. NOTCH POSTS 1-1/2' EACH SIDE TO PROVIDE TRUSS SEAT, SS WOOD POST, SEE POST/FOOTING SCHEDULE,. S6 4 - 40d GALV. NAILS IN PRE -DRILLED HOLES OR 3/4'41 MACHINE BOLT 0 SOLID BLOCKING AT CONNECTION POINTS. (SD TYP. PURLIN, SEE FLOOR PLAN FOR SIZE 0 2' X 6' OR 2' X 8' TOP GIRT 0 4 - 16d NAILS OR 3/4'41 M. BOLT DOUBLE OVERHEAD DOOR OPTION OPTIONAL FRONT ELEVATION N.T.S. , SINGLE SLIDING DOOR OPTION 0PT1.0'iNIA L - FRON, i ELEVA-T-I-O-N- N.T.S. OPTIONAL FRONT ELEVATION N.T.S. I 1l��ell�•�:�\I��:ir_l� S1 TRUSS TOP CHORD, DESIGN BY OTHERS S2 TRUSS BOTTOM CHORD, DESIGN BY OTHERS S3 2' X 6' DFL -L #2 EACH SIDE S4 WOOD POST, SEE P❑ST/FO❑TING SCHEDULE SS 4 - 16d (ALV. NAILS, EACH SIDE 1). KNEE BRACE REQUIRED WHERE SHOWN ON POST/FOOTING SCHEDULE BRACE NOT REQUIRED AT GABLE END TRUSSES. 2). ALTERNATE KNEE BRACE/POST AND TRUSS/POST CONNECTION = USE 3/4'41 THRU BOLTS, EACH LOCATION, N.T.S. BUILDING SPECIFICATIONS: GENERAL - ALL BUILDING CONSTRUCTION SHALL CONFORM TO THE 2006 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC 2006), AND ALL STATE & LOCAL BUILDING CODES. THESE SPECIFICATIONS AND PLANS ARE INTENDED FOR USE IN 30 OR 40 PSF LIVE LOAD, 85 MPH WIND SPEED, EXPOSURE 8 AND SEISMIC DESIGN CATEGORY C. DESIGN LOADS - ROOF LL = 30 OR 40 PSF ROOF DEAD LOAD = 5 PSF* CEILING LL = 0 PSF CEILING DL = i PSF • ROOF OL ALLOWS FOR A MAXIMUM OF 3" THICKNESS OF FIBERGLASS INSULATION. ' MAXIMUM SOIL BEARING PRESSURE = 2,000 PST - MAXIMUM SOIL BEARING PRESSURE IS BASED ON SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL AND CLAYEY GRAVEL SOILS OR BETTER. LESSER' SOIL. CONDITIONS WILL REQUIRE REVIEW AND FOOTING SIZE ADJUSTMENT BY THE ENGINEER. CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH F'c = 2,000 psi, 4 SACK MIX FOR FOOTINGS. CAST IN PLACE CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318-05. WOOD - STRUCTURAL LUMBER SHALL CONFORM TO DF -L /2 OR BETTER BY WWPA GRADING RULES. MAXIMUM MOISTURE CONTENT SHALL BE 19% BY '. WEIGHT. NAILING SHALL CONFORM TO TABLE 2304.9.1 FASTENING SCHEDULE & OTHER APPROPRIATE SECTIONS OF CHAPTER 23 OF THE ISO. ALL _ NAILS INTO PRESERVATIVELY TREATED WOOD SHALL BE HOT -DIPPED ZINC COATED GALVANIZED STEEL, SILICONE BRONZE, COPPER OR STAINLESS STEEL CCA TREATED WOOD SHALL CONFORM TO THE REQUIREMENTS OF AWPA STANDARDS C-16, C-22, C-23, C-24 & C-28. POSTS FOR -. BUILDINGS SHALL BE AS NOTED ON THE PLANS. ALL POST MATERIALS SHALL BE HEM -FIR #2 OR BETTER, FULL DIMENSION AND GRADED BY WWPA GRADING RULES. HARDWARE SHALL BE SIMPSON OR APPROVED EQUAL. ALL BOLTS SHALL CONFORM TO ASTM A307. METAL PANELS MAY BE DELTA RIB STYLE, GALVANIZED OR PAINTED, 29 GAUGE THICKNESS, ASTM A653 STRUCTURAL QUALITY (SQ), Fy = 80.0 ksl. ROOF PANELS SHALL BE FASTENED TO PURLINS WITH PLATED, GASKETED 1 1/2" LONG METAL TO WOOD FASTENERS. WALL PANELS SHALL BE FASTENED TO GIRTS WITH PLATED, GASKETED 1" OR LONGER METAL TO WOOD FASTENERS. PANELS SHALL BE INSTALLED AND FASTENED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. ALTERNATE ROOFING & SIDING APPLICATIONS - BUILDING ROOF MAY BE SHEETED WITH 15/32" O.S.B. BOARD, 1/2" C -DX PLYWOOD OR OTHER APA RATED SHEETING, NAILED O 6" 0. C. W/ 8d OR 10d NAILS. FINISH COVERING FOR SHEETED ROOF MAY BE COMPOSITION ROOFING OVER 30X .FELT, O.S.S. BOARD 1 2" C -DX PLYWOOD 15 32" T-111 " B SIDED WITH 7 16" O.S B NG OVER 15 FELT. BUILDING MAY E / OR 29 GAUGE METAL ROOF, / / W PLYWOOD SIDING OR HARD, -PLANK. LAP SIDING MAY BE INSTALLED OVER BUILDINGAND ND A LL SHEETING. SHEETING SHALL BE FASTENED TO _ GIRTS WITH 8d, NAILS O 6" 0. C., OR 1 1/2" LONG X 16 GA. STEEL STAPLES O 6" 0. C. O PANEL EDGES & INTERMEDIATE FRAMING. SOIL COMPACTION - ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A VIBRATORY COMPACTOR TO 95% OF THE PROCTOR DENSITY AS DETERMINED BY ASTM A1557, METHOD D. TRUSSES SHALL BE DESIGNED BY AND BEAR THE SEAL OF AN ENGINEER REGISTERED TO PRACTICE IN THE STATE OF WASHINGTON TRUSS LOADING: TOP CHORD LIVE LOAD = 30 OR 40 PSF TOP CHORD DEAD LOAD= 5 PSF BOTTOM CHORD DEAD LOAD = 1 PSF TRUSS WEB BRACING INTERIOR OR GABLE END TRUSSES ' _-N❑TES_ FOR TRUSS WE,... RR.ACTNG1 - - TRUSS DIAGRAMS WILL OFTEN REQUIRE WEB MEMBER BRACING, WHICH IS SHOWN ON TRUSS DRAWINGS PIS I= THE METHOD OF TRUSS WEB BRACING SHOWN ABOVE REPLACES 1' X 4' OR 2' X 4' WEB MEMBER BRACING-. FOLLOW THESE INSTRUCTIONS FOR ALL WEB MEMBER BRACING TO REPLACE 'RAT -RUN.' WEB lOd NAILS @ 6' O.C. Od NAILS @ 6' D.C. X 6' OR 2' X 8' X 4' L -BRACE L -BRACE TRUSS WEB MEMBER TRUSS WEB MEMBER 'SHEATHING REQUIRMENTS THE FOLLOWING MINIMUM ROOF DIAPHRAGM REQUIREMENTS ARE NEEDED, ■ ROOF STEEL, 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS, #16 x 1 1/2' AT 9' O.C. (NEXT TO HIGH RIB) ■ CAVE .AND RIDGE PURLIN SCREWS, #14 xl 1/2' AT BOTH SIDES DF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEEDED, ■ ENDWALL STEEL, 29. GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS, 010 x 1 1/2' @ 9' D.C. (NEXT TO HIGH RIB) ■ BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS, #14 x 1 1/2' @ BOTH SIDES OF EACH MAJOR RIB. SECTION B -B SECTION B -B DIAPHRAGM SCREWS AT INTERIOR TRUSSES AT GABLE END TRUSS L j(/-}������ ENDWALL DOOREHEADERS &WGABLEAEND GIRT TOPS CHORD, CAVE & RIDGE PURLINS ON ROOF S1 S3 S2 dG 9 DIAPHRAGM SCREWS] TYPICAL SCREW PATTERN, EXCEPT AS S4 � NOTED ABOVE i. F- -' STEEL SHEETING SCREW PATTERNS N.TS S5 TYPICAL RUSS BOTTOM CHORD BRACING NOTES FOR TRUSS BOTTOM CHORD BRACING N.T.S. Si GABLE END TRUSS S2 DOUBLE INTERIOR TRUSSES S3 2' X 4' X -BRACING @ 10' 0' O.C. S4 2' X 4' BOTTOM CHORD BRACING @ 10'-0' D.C. OR, AS SPECIFIED BY TRUSS MANUFACTURER I• 1�L SS TOENAIL BRACES TO TRUSSES WITH 3 - 10d NAILS aF 8 - 16d NAILS 2' X 6' X 18' B❑LYING BLOCK CORNER POST - 16d NAILS I ' BOLTING BLOCK DETAIL 3 TYP. GABLE END TRUSS CONNECTION USE BOLTING BLOCKS BELOW ALL CORNER COLUMN GIRTS SPLIT SLIDER DOOR OPTION OPTIONAL FRONT ELEVATION N.T.S. NOTES FOR OPTIONAL FRONT ELEVATIONS S1 HALF TRUSS DESIGN BY OTHERS S2 2' X 10' HEADER UP TO 12' 0' DOORS 2' X 12' HEADER UP TO 20' 0' DOORS 2' X 12' BACKED WITH 2" X 6' UP TO 24' 0' S3 2' X 6' HEADER S4 4' X 6' DOOR POST - 8' THRU 14' WALL HEIGHT W/ 2' X 6' FACER. 6' X 6' DOOR POST - 16' & 18' WALL HEIGHT W/ 2' X 8' FACER, SS DOUBLE 2' X 6' KINGP❑ST TYPICAL 51UE ELEVA I IUN NOTES FOR SIDE ELEVATION N.T.S. S1 2' X 8' HEADER S2 2' X 10' HEADER FOR 10' & 12' SLIDING DOORS 2' X 8' HEADER FOR 8' & SMALLER SLIDING DOORS SPACING 'W' W X D 'B" DIA IT, REQUIRED VOLUME, -YD 1&- W -V' 6" X 6" 18•' 3'-0" NO _ 0.20 _ 0.20 10'-0 12-0" 14-0" 3.0' 3.0' NO NO -- 0.20 0.20 6"X6" _ 6"X6"W/2 X6 18 18 10'-0 I-- 10'-0 16-0' - -- - 6"X8" -- 20 3-0 NO 0.24 __._ _ 10'-0 18-0' 6X10" 3-0 NO 0.24 20 10'-0 20-0" 6 X10" 21 3-0 NO- 0.27 12-0" W -O' 6 X 6 26 3 -O NO 0.41 3'-0" NO 0.41 ---NO -12;0,•- -17.0•: 6" X 6" W/2" X 6;r ---26"- ..3,-0�;- 0.41 12.0" 14'-0" 6" X 6'• W/2 X 6 6•' X 8" W/2•' X 6•' 26 26 3 -0" T -O" . NO NO - " - 0.41 0.41 12-0' 16'.0" 12.0"--18'-0"�6"X8"VIIl2"'X6" 6" X 10•• Wl2•• X s^ --- 26 _ 3'-0"_ .__NO_ _ 0.41 0.44 1Z -W' 20•-V' 26•• a• -z" No POST/FOOTING SCHEDULE 30• SPANS, 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "If' W X D "B" DIA 'T• REQUIRED VOLUME, YD IW -W' &-&1 6" X W 26" T.0" NO 0.41 ------ 26" ----- 3'-0" ------ NO - --- 10'-0" ---- 10'-0" ----- 6" X 6" 0.41 _ 10'-0' 12'-0" 14-0 6" X 6" VU%2" X 6" 6"XB"1Nl2 X6 26" _ 26 3'-0" 3-0' NO NO 0.41 0.41 10'-0 0.41 10'-0" 18'-0" 6" X 8`• W!2" X 6" 26'• 3'-0" NO 0.41 -- -- ---- 20'-0" ---6;i-W-2-'-'X-6"- 6" X " ----...._--- 26" 3'-0" -_ NO 0.41 IV- 22-0" 6 X 10 W/2•' X 6" 26 - 3-2' NO 0.44 26 3 J" NO 0.45 124" 8'-0" 6" X 6" 28" T -V' NO 0.47 12-0""- 10,,0„ &7R 6" 28" 3'-0" NO 0.47 _- 12-0 4I ---._..- 6 X 6 W/2 X 6" 28 3 -0" NO 0.47 12-0 14-0 6" X 8" 28 3-0 NO _ 0.47 12.0 16-0" __- 6 XS••W_!2 X6 28 3-0' NO 0.47 FTC 10'' 28 3`-0", NO 0.47 12-0" 20'-0" 6" X 12" 28" 3'-0" _ -- NO 0.47 12-0 24 -0" 6" X 12" 28 3%6" NO 0.56 POST/FOOTING SCHEDULE 36' SPANS, 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING MNEEBRACE CONCRETE SPACING "H" W X D "B" DIA. 'T' REQUIRED VOLUME, Y13 IV-O"8-0' 6X6 28 X- NO 0.47 10'-0 10-0' 6X6 28 3-0' NO, _ 0.47 10'-0 12-0' 6 X6 W/2 X6 28 3-0' NO 0.47 0.47 3'-0" NO 0.47 28" 10'-0 18-0' 6 X89Nl2' X6 28 3-0 NO 0.47 10•-0 20-0' 6X10 - 28 3-0'- NO 0.47 90'-0 22-0" 6 X 10 W/2 X 6 28 _ -3-0" _ NO 0.47 101 -VI W-91 6" X 10" WIZ' X 6" 28 • T-2•' YES 0.50 12-0 8-0 6 X6 32 3-0' NO 0.62 124_ 10-0' 6 X6 3_2 3-0• NO 0.62 12-0 12-0 6 6 W/2 X6 X 32 3-0 NO 0.62 12-0 _ 14-0' 6 XS 32 3-0' NO _ O.fi. 12.0 16-0 6 XS W/2'X6 32 3-0' NO 0.62 12-0 18-0' 6 X10 32 3-0' NO .-._. 0.62 12-0 _. 20 -0' _-_ - . 6 X 10" W/2" X 6" __- 32 3 -0' NO 0.62 12-0 22-0' ?�-0" 6X12" __-__ 3'�3" 0.66 0.68 12-0" 6" X 12" WI2" X 6" _-32- 32" NO POST/FOOTING SCHEDULE 40' SPANS, 30&40 PSF LIVE LOAD, POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "H" W X D "B" DIA 'T' REQUIRED VOLUME, YD IV- 8.0..6 X6 30 3-0' NO ----- 0.55 _A61-&-, 10'-0 - - 6X6' - - 30 3-0' NO 0.55 3-0 NO _ 10'-0 12-0- 6X6 W/2 X6 30 0.55 '10'-0 14-0 6X6 W/2 X6 30 3-0' NO 0.55 -90'-0 16-0" 6X8 W/2 X6 30 3-0 NO 0.55 0.55 10'-0 20'-0 6X10 30 3-0' NO 0.55 10'-0 22-0' 6X10 X6' 30 3-0' NO 0.55 10'-0 24.0' -W/2 6X12" 30 3'-Z' YES 0.58 12-0 8-0 6 X6 33 3-0 NO 0.66 12-0 10-0' 6X6 733 3-0' NO 0.66 _ 0.66 12-0" 14'-0" 6" X 8" 33 3 -0' NO 0.66 --- 12-0 16--g- S X 8 W/2 d 6 .33 � tYD 0.66 18-0. 6 X10 -- 33 3-0' NO 0.66 _12.0 12-0 20.0•• 6 X10V11/2'X6" 33 3-0_ 0.66 _NO NO 12-0 .2Z-0" 6" X 12" -- _... _ _ '3-z' 0.70 12-0 24 -0" 6" X 12" W/2" X 6" 33 T-2•' NO 0.72 POST/FOOTING SCHEDULE 48' TO 5Z SPANS, 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "IT' W X D "B DIA 'T' REQUIRED VOLUME, YD 10'-0 8•4" 6 X &1 34 _ T -O" NO 0.70 -NO _ -i&4;-10-0" 6 X6 _ 34 3••0`° 0.70 8 x -w%2 -- 3a a•-0" _ No 0.70 10•-0 14-0'• - 6 X6••W/2 X6 3-0• NO 0.70 10'-0 - .34 _ - --- -- 0.70 90'-0 16-0' 6X8 WIZ' X6" 34 3-0" 0.70 -U' 16 -0" 6 X 8 WIZ'X 6 _ 34 T -O" v_NO-- NO 0.70 10'-0'' 20'-0" 6" X 10" - - 34" ,3'-0" _ YES 0.70 10'-0 _ 22-0" 6 X 10' W/2 X 6' 34 T.V NO 0.70 24'-0" 6' X 12" W/2•' X 6" 34" T -O" YES 0.70 12-0 8-0 6X6 36 3-0 NO _. 0.79 12-0 10-0' 6X6 W!2 X6m -3159;-3-0' -. NO 0.79 12.0 12-0' 6X6 W/2 X6' 36 3-0' NO 0.79 _ 3'-0" - NO 0.79 12-0 16 -0' 6 X B' W_/_2•' X 6" 36 3 -0' NO 0.79 12.0 18'-0" 6 X 10" 36 • 3!-& YES 0.79 12.0 204' 6X10 W/2 X6 - 36 3-0" __._ 0.79 12-0 22-0T 6 X 12 WI2 X 6 96 &4; _NO-:. NO 0.83 12-0 24'-0" 6' X 12" W/2' X &1 36" 3'-2" -_ _ _ NO 0.83 POST/FOOTING SCHEDULE 54' TO 60' SPANS, 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "H" W X D "B" DIA 'T' REQUIRED VOLUME, YD 1_0•-0•• 8'-0•' 6" X 6" 36" T -O" NO 0.79 _ --` - - 10'-0" -- - 6 "---- 6" X 6" --36" 36".. - - -...-- 3'-0" --O NO 0.79 10'-0 12 -0" ... &'f( 6' Vil/2" X 6'' _-__- 36 ____'- 3'-0" _._...___- NO 0.79 __- -- --T6;'-- 36 . -_. __-...._____-..___. 3-0' NO 0.79 10'-0 16-0" 6 XS W/2"X6" 36 34' _ - NO 0.79 0.79 10'-0 20-0• 6X10 W/2 X6 �36 3-0 YES _ 0.79 10'-0 22-0 6 X10 W_/2 X6 3-0 NO 0.79 10'-0 24.0 ley _ _36 36 3 2 _ YES 0.83 12-0 8-0 6 X6 40 a-0 NO 0.97 12.0 10 -0' 8" X 6" W/2 X 6 40 5141, NO _ 0.97 12-0 - 12-0' -- - 6" X 8" 40 3 -0' NO 0.97 12-0 14!4' _ 6 X 8 W/2 X 6 40 3!-V' NO 0.97 12-0 16 -0 6 X S W/2 X 6 40 T- __ NO 0.97 92-0 18-0 6X10 40 3-0' YES 0.97 12-0 20-0' 6 X10 W/2 X6 40 3-0' NO 0.97 6" X 12" W/2" X 6" 40" 3'-0" NO 0.97 _..12-0" 24'-0" 6" X 12" W/2a X 6,' 40';- 3;-2•; _ _._ �..._ 1.03 NOTE: 1. THE NEXT LARGER SIZE POST MAY BE SUBSTITUTED FOR POSTS WITH 2" X 6" LAMINATIONS. 2. ENDWALL POSTS SHALL BE 6" X 6" ROUGH CUT HEM -FIR #2 TREATED V-.1 POSTS UP TO 16'-0" WALL HEIGHT. ABOVE 16' WALL HEIGHT, •;.•, ENDWALL POSTS SHALL BE 6" X 8" ROUGH CUT HEM -FIR N2 POSTS. 3. FOOTINGS FOR ENDWALL POSTS SHALL BE A MINIMUM OF 20"0 X EXPIRES 12/29/09 3'-0" DEEP FOR WALL HEIGHTS TO 16'-0". ABOVE 16' WALL HEIGHT; FOOTINGS SHALL BE 24"0 X 3'-4" DEEP. 4. ABOVE FOOTING DESIGNS ARE FOR POST FRAME BUILDINGS WITH CONCRETE FLOORS (CONTRAINED POSTS). IF BUILDINGS WILL NOT HAVE CONCRETE FLOORS, INCREASE FOOTING DIAMETER X 2" & FOOTING,. DEPTH X 4". _.:_-�1^��U�'r', E ENGINEERING. LAYOUT, STRUCTURAL DETAILS AND SPECIFICATION(. POST FRAME BUILDINGS j 30 & 40 PSF LIVE LOAD - IBC 2006 EXCALIBER CONTRACTING, INC. P. 0. BOX 14991 I 9K�1E--WASHINGTON 99214-0991 L. BY DATE DRAWING NO. - DRAWN WAMBEKE 7_15-08 EXCALIBUR.IBC2006 CHECKED BY DATE DESCRIPTI❑N OF CHANGE PROJECT N0. 2008 SCALE, N.T,S. SHEET, I OF I PROVIDE DIAGRAMS AND NGINEERING LAYOUTS FOR HOOF TRUSSES, BEAMS AND OOR SYS1"EMS PRIOR TO FRAMING r UNS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS iiY REViEV/ED FOtz t,r;ti42 SP ,KA.NE `r4: s =V OMPLIANGE INCA DIVISION!