2012, 05-01 Permit App: BLD-2012-0528 GarageStiokane
FVa11eyW
Community Development Department
it Center
03 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter(i°spokanevalley.orq
(Staff Use Only)
OMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
0 NEW CONSTRUCTION
DECK
ADDITION/REMODEL 0 ACCESSORY BUILDING
v I
Q OTHER
SITE ADDRESS: l 75 ( E Mf7n -oro er
ASSESSORS PARCEL NO.: LEGAL DES
BUILDING OWNER NAME: Perry L/ ' 5[i n
rpt:CEA/EQ
IPTION:
NAME: r!/` ✓// �//, /r 77_50 p-\ I Namee /V rC k
ADDRESS: / 767(9l L 64"4 on /pint er- I Suumittai ii I_
CITY: 500A-0 Q N( -e ✓ Q //7 STATE: I�(� ZIP:
75-3- 9//
MAI U1 2012
Q
'cel^t - 17 - 5-7 g
PHONE:
FAX: CELL:
CONTACT NAME:
PHONE:
FAX: CELL:
CONTRACTOR NAME: rq 2 73v / 4' h �,, c"1//' Ce S•
//37
MAILING ADDRESS:
CITY:
PHONE:
5/b) n ne 1/4777
STATE: 74 )4 ZIp:, yy„?o6
8P7 z_
CONTRACTOR LICENSE NO.: Li a l 85 V 510 4XPIRES: CITY BUSINESS LICENSE NO.: LQ/ -O79 897
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
FAX: CELL:
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:
2.5 ''
Dimensions:
'Rc) X Zee
No. of Stories:
7 7-7_
Total Habitable
Space:
Main Floor SQ FT:
Upper Floor SQ FT:
Unfinish d Basement SQ
FT: ' 3 qQ
Finished Basement SQ
FT:
Garage SQ FT:
7,5r 2--
Deck/Covered Patio SQ
FT:
Impervious Surface
Area:
30% Slopes on
Property:
No. of Bedrooms:
Construction Type: 5 kick
Heat Source:
Sewer or Septic:
TOTAL COST OF PROJECT: $J& / 000
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit of a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be re. red to be sugmitted and subsequently approved before this application can be processed.
Signature
Date: x/
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/fllestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc
RESIDENTIAL SECK LIST DIRECTIONS: •
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
o Header, beam or concrete lintel sizes ❑ Window well locations if applicable
o Brace wall panel locations ❑ Room usage labels
o Water heater and furnace locations ❑ Smoke detector locations
o Exhaust fan locations ❑ Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with Emil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
O Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Mick Bondurant
From: Wayne McGavran
Sent: Wednesday, May 02, 2012 9:25 AM
To: Permit Center
Cc: Mick Bondurant; Jon Hester
Subject: Permits
I approved the following permits, today.
APR -2012-0023
ROW -2012-0147
Wayne
1
Spokane
jvalley�
Target Date sheet
For City Use Only
PLUS Project 63\C1 Z.C3 I ?_ - 52-13
Project Address V1
1.7 52 I E " !v !'t f r} r P i` ✓i
t
11703 E Sprague Ave Suite 8-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we arc
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is — ' — i Z
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not tate date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments world be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page
Although you should be contacted on or by the target date, please feel free to contact us tfyou haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure. you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it conies up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1
0
1z'
• •
2U
0;54 f� 4,
1-1'
PLANNING DEPT. APPROVED
BY:
DATE: 5-/ - 2o'2_
75 A5:0ei
Lo T- 14,R,
(c4-Ia-Sze ,�-
1
f
-82.0166 S?. 91 -7Z1
)4 -P/2 -12-z3
J