Loading...
2012, 05-01 Permit App: BLD-2012-0528 GarageStiokane FVa11eyW Community Development Department it Center 03 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter(i°spokanevalley.orq (Staff Use Only) OMIT NUMBER: PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 0 NEW CONSTRUCTION DECK ADDITION/REMODEL 0 ACCESSORY BUILDING v I Q OTHER SITE ADDRESS: l 75 ( E Mf7n -oro er ASSESSORS PARCEL NO.: LEGAL DES BUILDING OWNER NAME: Perry L/ ' 5[i n rpt:CEA/EQ IPTION: NAME: r!/` ✓// �//, /r 77_50 p-\ I Namee /V rC k ADDRESS: / 767(9l L 64"4 on /pint er- I Suumittai ii I_ CITY: 500A-0 Q N( -e ✓ Q //7 STATE: I�(� ZIP: 75-3- 9// MAI U1 2012 Q 'cel^t - 17 - 5-7 g PHONE: FAX: CELL: CONTACT NAME: PHONE: FAX: CELL: CONTRACTOR NAME: rq 2 73v / 4' h �,, c"1//' Ce S• //37 MAILING ADDRESS: CITY: PHONE: 5/b) n ne 1/4777 STATE: 74 )4 ZIp:, yy„?o6 8P7 z_ CONTRACTOR LICENSE NO.: Li a l 85 V 510 4XPIRES: CITY BUSINESS LICENSE NO.: LQ/ -O79 897 DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: FAX: CELL: ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: 2.5 '' Dimensions: 'Rc) X Zee No. of Stories: 7 7-7_ Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinish d Basement SQ FT: ' 3 qQ Finished Basement SQ FT: Garage SQ FT: 7,5r 2-- Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: 5 kick Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $J& / 000 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit of a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be re. red to be sugmitted and subsequently approved before this application can be processed. Signature Date: x/ Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/fllestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc RESIDENTIAL SECK LIST DIRECTIONS: • Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Window and door location and sizes o Header, beam or concrete lintel sizes ❑ Window well locations if applicable o Brace wall panel locations ❑ Room usage labels o Water heater and furnace locations ❑ Smoke detector locations o Exhaust fan locations ❑ Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier O Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Mick Bondurant From: Wayne McGavran Sent: Wednesday, May 02, 2012 9:25 AM To: Permit Center Cc: Mick Bondurant; Jon Hester Subject: Permits I approved the following permits, today. APR -2012-0023 ROW -2012-0147 Wayne 1 Spokane jvalley� Target Date sheet For City Use Only PLUS Project 63\C1 Z.C3 I ?_ - 52-13 Project Address V1 1.7 52 I E " !v !'t f r} r P i` ✓i t 11703 E Sprague Ave Suite 8-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we arc providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is — ' — i Z The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not tate date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments world be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page Although you should be contacted on or by the target date, please feel free to contact us tfyou haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure. you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it conies up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 0 1z' • • 2U 0;54 f� 4, 1-1' PLANNING DEPT. APPROVED BY: DATE: 5-/ - 2o'2_ 75 A5:0ei Lo T- 14,R, (c4-Ia-Sze ,�- 1 f -82.0166 S?. 91 -7Z1 )4 -P/2 -12-z3 J