2012, 12-05 Permit: SW-12002598 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002598
Permit Issued Date:
12/05/2012
Expiration Date:
Project Name:
Permit Type:
SOUTH GREENACRES PH 3
SEWER
Primary Contact: DELANEY, HOWARD
Applicant: DELANEY, HOWARD
Address: 17606 E MONTGOMERY AVE
GREENACRES, WA 99016-8518
Phone: 509-768-7905
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
17606 E MONTGOMERY AVE
55073.0211
PLAT A
GREENACRES IRR DIST PLAT A E1/2 OF BLK 9
EXC E110' OF N123'
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 4.46 Acre(s)
Owner:
Address:
Phone:
Email:
DELANEY, HOWARD
17606 E MONTGOMERY AVE
GREENACRES, WA 99016-8518
509-768-7905
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
Owner Acting As Builder
OWNER
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS
SAME, WA 00000
DETAILS -
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR 8 INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 12/05/2012 15:03:44
Printed by IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002598 12/05/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 12/05/2012 15.03:44 Printed by: IIS APPPOOL\SmartGovProdApp