2008, 06-26 Permit: 08003385 SewerSPOKE COUKTY
SPOKANE COUNTY
DEPARTMENT OF BUILDING & PLANNING
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information
Project Information
Site Address: 18206 E MONTGOMERY AVE
Parcel Number: 55074.3404
Subdivision: RANGE
Block: 2 Lot: 4
Zoning:
Owner: VIKING CONSTRUCTION, INC
Address: 2605 W HAYDEN AVE
HAYDEN LAKE, ID 83835
luilding Inspector:
Water Dist: CONSOLIDATED ID #19
Project Number: 08003385 Inv: 1 Issue Date: 6/26/2008
Permit Use: SEWER CONNECTION - SONATA SPRINGS
Applicant: VIKING CONSTRUCTION INC
2605 W HAYDEN
HAYDEN LAKE, ID 83835
Contact: VIKING CONSTRUCTION INC
2605 W HAYDEN
HAYDEN LAKE, ID 83835
Setbacks - Front:
Group Name:
Project Name:
Left: Right:
Phone: (208) 762-9106
Phone: (208) 762-9106
Rear:
Permits
.wer Connection Permit
Contractor: VIKING CONSTRUCTION License #: VIKINCI988DJ
SEWER CONNECTION
1 $85.00 PROCESSING FEE
1 $15.00
Total Permit Fee: $100.00
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES.
THE INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND
MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE
AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.
BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETY.
Payment Summary
Tran Date
6/26/2008
Total Fees AmountPaid AmountOwing
$100.00 $100.00 $0.00
rocessed By: SHATTO, JULIE
Printed By: HINTZ, FAITH Page 1 of 1
Receipt # Payment Amt
2979 $100.00
PERMIT
NOTICE
It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and
requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's
or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of
property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/
curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized
representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your
structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to
concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which
must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - In addition to Foundation inspections prior to pouring pads, inspection of blocking, tie -downs, stairs, handrails,
skirting, etc., installations when completed per manufacturers installation instructions; Final inspection approval prior to occupancy: completed Wains
Tag(s) must be affixed to the home and completed inspection record card and manufacturers installation instructions must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Department
of Building & Planning
477-3675
• Construction in a flood plain, Division of Engineering & Roads
477-3600
• Electrical wiring, State Department of Labor and Industries
324-2640
• On-site waste disposal system, Spokane Regional Health District
324-1560
• Road cuts for utilities or driveways, Division of Engineering &
Roads - 48-HOUR NOTICE REQUIRED
477-3600
or State Department of Transportation
456-3000
• Sewer connection, Division of Utilities
477-3604
or City Public Works Department
625-6300
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by
the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and
approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity
of the permit. Please call if you have any questions concerning the validity of your permit. Please contact the other agencies with respect to their refund
policy on all other permit types.
All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the
date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No
refunds may be authorized more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Department of Building and Planning at the below address.
Spokane County Department of Building & Planning
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133
REVISED 06/07 BLDG PERMIT