2012, 05-01 Permit App: APR-2012-0023 Approachppokane
Valley
Community Development Department
4•7
rmit Center
03 East Sprague Avenue, Suite B-3
pokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@spokaneval lev.orci
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: 'CI . / 7$ ( E t404%9D/yi 6.,
START DATE: 177/ /--2__ANTICIPATED COMPLETI9N DATE: / p a
BUILDING OWNER NAME: if -7,(9457 V ti/ S O
MAILING ADDRESS: / 5/ 2 ( L fr) C 0.71Qc -,-.7
CITY: CfbZ(�yt e a1 a/STATE: �j'()Q /j ZIP
CONTACT PERSON NAME:
Sam
PHONE:
FAX:
CONTRACTOR NAME:
CELL: 953— �// 7
MAILING ADDRESS:
CITY:
PHONE:
¼(('QYISTATE:
/1/$Q�e 0( ZIP:
FAX: CELL:
CONTRACTOR LICENSE No.: eeret(16 9 b/i IREs:
PROJECT DESCRIPTION (Please Provide Site Sketch)
ig Residential Driveway 0 Commercial/Industrial Driveway
Q' Existing Curb & Gutter fl Rural Road Section
El Culvert Installation 111 Repair/Construction
0 Other Conditions:
CITY BUSINESS LICENSE NO.:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is n a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be requi ,o be submitted and subsequently approved before this application can be processed.
Signature
Date: 8- -/, //
f
Updated 1-11-11 Page 1 of 1
http: //www. spokaneva Iley. o rg/fi lestorage/ 124/938/210/948/ 1496/Approach_Perm it_1-11-11. doc
•APPROACH PERMIT APPLICOION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
O Drywell (show location on sketch)
O Other (please describe below)
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
Li FT (SEE TABLE)
CONCRETE
APPROACH
l
CURB
1
w
z
w.
o
di
I--4' ---THROAT WIDTH OFT—.I-4'
WING (SEE TABLE) WING
STREET NAME
EDGE NJ
ASPHALT
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
17271 FT (SEE TABLE)
ASPHALT
APPROACH
THROAT WIDTH I-1 FT ---I
(SEE TABLE)
STREET NAME
I
N.
CORNER LOT,
DISTANCE FROM
CURB RETURN
n FT (SEE TABLE)
CURB
RETURN
rnovefSIDM4"1
15 RADIUS RADIUS
RETURN
�1
IF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
Q FT (SEE TABLE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'