Loading...
2012, 05-01 Permit App: APR-2012-0023 Approachppokane Valley Community Development Department 4•7 rmit Center 03 East Sprague Avenue, Suite B-3 pokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokaneval lev.orci APPROACH PERMIT APPLICATION PROJECT ADDRESS: 'CI . / 7$ ( E t404%9D/yi 6., START DATE: 177/ /--2__ANTICIPATED COMPLETI9N DATE: / p a BUILDING OWNER NAME: if -7,(9457 V ti/ S O MAILING ADDRESS: / 5/ 2 ( L fr) C 0.71Qc -,-.7 CITY: CfbZ(�yt e a1 a/STATE: �j'()Q /j ZIP CONTACT PERSON NAME: Sam PHONE: FAX: CONTRACTOR NAME: CELL: 953— �// 7 MAILING ADDRESS: CITY: PHONE: ¼(('QYISTATE: /1/$Q�e 0( ZIP: FAX: CELL: CONTRACTOR LICENSE No.: eeret(16 9 b/i IREs: PROJECT DESCRIPTION (Please Provide Site Sketch) ig Residential Driveway 0 Commercial/Industrial Driveway Q' Existing Curb & Gutter fl Rural Road Section El Culvert Installation 111 Repair/Construction 0 Other Conditions: CITY BUSINESS LICENSE NO.: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is n a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be requi ,o be submitted and subsequently approved before this application can be processed. Signature Date: 8- -/, // f Updated 1-11-11 Page 1 of 1 http: //www. spokaneva Iley. o rg/fi lestorage/ 124/938/210/948/ 1496/Approach_Perm it_1-11-11. doc •APPROACH PERMIT APPLICOION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide ft from back of curb ❑ Streetside Swale ❑ Drainage Ditch O Drywell (show location on sketch) O Other (please describe below) DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) Li FT (SEE TABLE) CONCRETE APPROACH l CURB 1 w z w. o di I--4' ---THROAT WIDTH OFT—.I-4' WING (SEE TABLE) WING STREET NAME EDGE NJ ASPHALT STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) 17271 FT (SEE TABLE) ASPHALT APPROACH THROAT WIDTH I-1 FT ---I (SEE TABLE) STREET NAME I N. CORNER LOT, DISTANCE FROM CURB RETURN n FT (SEE TABLE) CURB RETURN rnovefSIDM4"1 15 RADIUS RADIUS RETURN �1 IF CORNER LOT, DISTANCE FROM RADIUS RETURN Q FT (SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5'