2012, 10-30 Permit: SW-12002465 SewerSPOKANE COUNTY;!3UILDING AND PLANNING
PERMIT
Application Number: SW -12002465
Permit Issued Date:
10/30/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
TRENTWOOD (HARRIS)
SEWER
Primary Contact: LOSS EXCAVATION LLC
Applicant. LOSS EXCAVATION LLC
Address:
Phone:
Email.
603 N FELTS RD
SPOKANE VALLEY, WA 99206
509-863-2785
SITE INFORMATION:
Site Address'
Parcel Number
Subdivision:
Assessor's Description
Inspection Area.
4406 N MORROW CT
45032.1308
HARRIS SUBDIVISION
PHASE TWO
HARRIS SUBDIVISION PHASE 2 LOT 8 BLK 2
Owner
MCCARTHY, CHARLES J & LETA J
Address: 4406 N MORROW CT
SPOKANE, WA 99216-2244
Phone:
Email:
Water District: Trentwood Fire District: Spokane Valley Fire
Irrigation District #3
Zoning: Land Area: 10007 Square Feet
CONTRACTOR INFORMATION:
General Contractor
LOSSEEL903OS
LOSS EXCAVATION LLC
603 N FELTS RD
SPOKANE VALLEY, WA 99206
509-863-2785
DETAILS'
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 10/30/2012 1541:14
Printed by IIS APPPOOLWSP NET v4 0
SPOKANE COUNTY'r3UIL4ING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002465 10/30/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/30/2012 15:41.14
Printed by. 118 APPPOOLV+SP NET v4.0