Loading...
2012, 10-18 Permit App: BLD-2012-1870 RemodelSpokane 1 Valley RESIDENTIAL CONSTRUCTION PERMIT APPLICATION Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenterc sr okanevallev.orq • (Staff Use Only) PERMIT NUMBER: PERMIT FEE: ❑ NEW CONSTRUCTION ❑■ ADDITION/REMODEL ❑ ACCESSORY BUILDING ❑ OTHER • DECK SITE ADDRESS: 415 N Moore Rd, Spokane Valley, WA 99037 ASSESSORS PARCEL NO.: 45133.1905 BUILDING OWNER NAME: Homeowner LEGAL DESCRIPTION: Lot 5, Block 3, Friske 1st NAME: Douglas & Sheryl Florance ADDRESS: 415 N Moore Rd CITY: Spokane Valley STATE: WA zip: 99037 PHONE: 509-893-0434 FAX: CELL• 509-953-9054(Sheryl) CONTACT NAME: Homeowner PHONE: 509-893-0434 FAX: CELL: 509-953-9054(Sheryl) CONTRACTOR NAME: Homeowner MAILING ADDRESS: 415 N Moore Rd, Spokane Valley, WA 99037 CITY: Spokane Valley STATE: WA zip: 99037 PHONE: 509-893-0434 FAX: CELL: 509-953-9054(Sheryl) CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: Convert main floor from 3 bedroom to 2 bedroom with master bathroom, making this a 2 bathroom home. Add small deck/porch to slider in new master bedroom. Convert main floor from 3 bedroom to 2 bedroom with master bathroom, making this a 2 bathroom home. Add small deck/porch to slider in new master bedroom. ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: same Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: Heat So rrra• Mrir Cowar nr Cat tie- ..,or TOTAL COST OF PROJECT: $ 12,000 P r -e jct #f /J‘ IV- 2 0� 2 l ?70 DISCLAIMER tr F (1 F I The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for con r brt VgnPthe dwelling is/ be served by potable water. 2) Ownership of this City of Spokane Valley permit in,ire to the property owner. 3) The signatory is the grope owner or has permission to represent the property owner in this transaction. 4) All construction is toe done in lull com Bance with the Citi Spokane Valley Development code. Referenced codes are available for review at the City of Spok4j falle� err201 enter. 5) The City Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, co es or ordinances. 6) Plans or additio information may be required to be submitted and subsequently approved before this application can be processed. CSV PERMIT CENTER Effc'1 iv6 October , 2007 P:\Community Development\02 Administration\03 Forms - Official Verstu \ u". ua Gv IC App 10.28.07.doc REV. t Page 1 of Nill rty of of nal Sini451 Valley® Target Date sheet For City Use Only PLUS Project f ..c - :(/ Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is! ' �' t/ The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feelfree to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 1ST FLOOR q\5 N Mo -e. �d 13'4" Project # SUB 228" RECEIVED NOV 0 8 2012 CSV PERMIT CENTER Lik I REV, # I CITY COPY v kane VIEW D FOR CODE COMPLIANCE KA ��" BUILDING DIVISION