Loading...
2011, 07-21 Permit App: 11002169 Repair, RemodelProject Number: /1002/69 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/21/2011 Page 1 of 2 Project Information: Permit Use: WATER DAMAGE REPAIR TO WALLS & RELOCATE 1 WALL & 1 EGRESS WINDOW Setbacks: Front Site Information: Contact: MATHESON, RUSSELL J & CARRIE A Address: 1605 S MORROW RD C - S - Z: SPOKANE VALLEY, WA 99216 - Left: Right: Rear: Phone: (509) 921-0489 Group Name: Project Name: Plat Key: 001841 Name: OPPORTUNITY TERRACE District: Sout Parcel Number: 45272.0114 Block: Lot: SiteAddress: 1605 S MORROW RD Location:: CSV Owner: Name: MATHESON, RUSSELL J & CARRI Address: 1605 5 MORROW RD SPOKANE VALLEY, WA 99216 - Zoning: R-2 SF Res Suburban District Water District: 010 VERA Hold: ❑ Area: 14,662 Sy Ft Width: 102 Depth: 145 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released Bv: Permits: Originally Released: 7/21/2011 By: tmelbourn Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation BASEMENT R R-3 VB BASEMENT 0 $1,400.00 0 $1,400.00 REMODEL Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $1,400.00 0 $1,400.00 Units Unit Desc Fec Amount 1 SELECT $69.25 1 SELECT $4.50 1 SELECT $27.70 Operator: JD Printed Bv: JD Permit Total Fees: $101.45 Print Date: 7/21/2011 Project Number: 11002169 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/21/2011 Page 2 of 2 Notes: {- _ Payment Summary: Permit Tvpe Building Permit Pee Amount Invoice Amount $101.45 $101.45 SI01.45 $101.45 Amount Paid $27.70 Amount Owing $73.75 $27.70 $73.75 Disclaimer: Suhmittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to he a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 7/21/2011 Spokane .FValley1 Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 'Fax: (509) 688-0037 perm itcenter@ sookanevallev.orq (Staff Use Only) PERMIT NUMBER: PERMIT FEE: //- 2/6? RESIDENTIAL CONSTRUCTION PERMIT APPLICATION El NEW CONSTRUCTION K"ADDITION/REMODEL' f t ACCESSORY BUILDING EI DECK El OTHER iwSITIEIADDRESS:Ij 16 O 5 S. )1/41k .(z-tO L. 1 SFok-Rvrr v A 1I e "t ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: Rv35el1 VV\c't es ©r1 NAME: VSSe0n/4-TA-4 FSO^ ADDRESS: HO CITY: Seokit U A- fte'1 so Rzl—oyS'9 - PHONE: STATE: \N A FAX: CELL: CONTACT NAME: R USS Vnat1,,es0v'� ZIP: ICI 2- I Z svti-110--ga G1 PHONE: 5-lc2/U--go6I. FAX: GQNTR'AC-TLORINAME: (\ ne, _ ( Self. MAILING ADDRESS: CITY: PHONE: STATE: CELL: R E("`E'(\/En CSV PFRMIT'CENTER I .JUL 21 2011 !Project 4 1` ' -.-1A_CA ZIP:- IC\ �. FAX: 1 ivzD l ltl CELL:,moi u, CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: SE.S�-C,RIBE�THE/SCOPE�OF-WORK-IN_D,ETAI° AND_INDICATE-USE:& P,ROPOSED-USE:- 1 intone l Rir� of w,ssclieu"tib 4 tt(=Tin5-u1A-t u,^ j 4'-FravA%c\J)-) D w'W: �• is . , v D. -J ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE ll� 4 • 1 Height to Peak: Dimensions: No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Deck/Covered Patio SQ FT: Impervious Surface Area: 300/0 Slopes on Pro rt ey: No. of Bedrooms: Construction Type: Heat Source: Se wer r Septic: TOTrAKC °sato FIR R E Meek 0 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: 7-7./ - Zo Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permlt_ _Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any ❑ Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing p®kane Valley® Target Date sheet For City Use Only PLUS Project 1 I 0C -.1Z.1 (0'1 Project Address �, 1 bt/`,J'>i 7-1 P l n. ((nu 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720-5240 t Fax: 509.688.0037 t permitcenter@spokanevaltey.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. / ^� Your application review TARGET DATE is f C_ Coi 1 ( I The TARGET DATE is the date we estimate your project application will have had its initial technical review. 11 is not the date for approval or perntit issuance. Tips for a Smoother Project Application Review ). Submit complete, accurate plans and documents.lt Extra time may be required for re -submittals as protect/application reviewers work on multiple applications and it may he several days before they can look at your new or revised information )> Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise Jiff dealing with reviewer comments would be the hest choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feelf ree to contact us ifyou haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete By following this procedure. you will save time and allow the reviewers to.complete the work more expeditiously Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would,prevcnt technical staff from completing the technical review once it is started. When this step is complete, your application will he routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of I Spokane Valley Project Transmittal City of Spokane Valley Community Development Department 11703 E Sprague Ave. Suite B3 Spokane Valley, \VA 992U6 Phone: 509.688.0036 Neu- project ❑ Previous pre -app meeting Plan religions ❑ Transmittal Date: Thursday July 21, 2011 Site Address: 1605 S MORROW RD Parcel Number: 45272.0114 Zoning: R-2 Water District: VERA Fire District: FD 01 Project Number: 11002169 Applicant: MATHESON, RUSSELL J & CARRIE Owner: MATHESON. RUSSELL J & CARRI 1605 S MORROW RD 1605 S MORROW RD SPOKANE VALLEY, WA 99216- SPOKANE VALLEY, WA 99216- (509) 921-0489 e-mail: e-mail: Contact: MATHESON. RUSSELL J & CARRIE Occupant: 1605 S MORROW RD email: SPOKANE VALLEY. WA 99216- (509)921-0489 e-mail: Contractor: OWNER ( ) - 0 Arch / Engineer: e-mail: Project WATER DAMAGE REPAIR TO WALLS & RELOCATE 1 WALL Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO PLAN c Please send all plan review and project comments via e-mail to the highlighted individuals.