Loading...
2012, 09-21 Permit: SW-12002254 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002254 Permit Issued Date: 09/21/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION WHITE BIRCH SEWER Primary Contact: D W CONSTRUCTION Applicant: D W CONSTRUCTION Address: 11014 E 16TH SPOKANE, WA 99206 Phone: 509-981-8599 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 610 N MOORE RD 45133.1706 FRISKE SUBDIVISION FRISKE SUB L6 B1 Owner: Address: Phone: Email: WOELKE, ELLIE M & DAN R 610 N MOORE RD VERADALE, WA 99037 Water District: Vera Fire District: Spokane Valley Fire Irrigation District #15 Land Area: 10386 Square Feet CONTRACTOR INFORMATION: General Contractor DWCONWC918J4 D W CONSTRUCTION 11014 E 16TH SPOKANE, WA 99206 509-981-8599 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 09/21/2012 07:37:10 Printed by: IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT - Permit Issued Date: Application Number: SW -12002254 09/21/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/21/2012 07:37:10 Printed by: IIS APPPOOL\ASP.NET v4.0