Loading...
2013, 05-07 Permit: SW-13000625 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000625 Permit Issued Date: 05/07/2013 Expiration Date: 05/07/2014 Project Description: Primary Contact: Phone: SEWER CONNECTION CAPITOL CONSTRUCTION 509-723-7299 Applicant: CAPITOL CONSTRUCTION Address: 4821 N GREENWOOD BLVD SPOKANE, WA 99205 Phone: 509-723-7299 Email: SITE INFORMATION: Site Address: Parcel Number: 6210 E MORELAND DR 35252.1204 Assessor's Description: VALLEY VIEW HILLS ADD LT 3 BLK 8 TOGETHER WITH 25-25-43 PTN OF NW 1/4 DAF; BEG AT SW COR OF LT 3 BLK 8 VALLEY VIEW HILLS ADD & TRUE POB TH E 140 FT TH S 99.88 FT TH W 140 FT TH N 99.88 FT TO POB Inspection Area: : (509)-477-3675 Owner: BISCONER REVOCABLE TRUST Address: 6210 E MORELAND DR SPOKANE VALLEY, WA 99212 Phone: Email: Water District: Spokane County Water Fire District: Fire District 8 District #3 Zoning: Land Area: 28744.8 Square Feet CONTRACTOR INFORMATION: CAPITC*895RL, Exp. 12/13/2013 CAPITOL CONSTRUCTION 4821 N GREENWOOD BLVD SPOKANE, WA 99205 509-723-7299 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 $125.00 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/07/2013 11:39:32 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000625 Permit Issued Date: 05/07/2013 Expiration Date: 05/07/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/07/2013 11:39:32 Project Coordinator: Dawn Dompier