2013, 05-07 Permit: SW-13000625 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000625 Permit Issued Date: 05/07/2013
Expiration Date: 05/07/2014
Project Description:
Primary Contact:
Phone:
SEWER CONNECTION
CAPITOL CONSTRUCTION
509-723-7299
Applicant: CAPITOL CONSTRUCTION
Address: 4821 N GREENWOOD BLVD
SPOKANE, WA 99205
Phone: 509-723-7299
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
6210 E MORELAND DR
35252.1204
Assessor's Description: VALLEY VIEW HILLS ADD LT 3 BLK 8 TOGETHER
WITH 25-25-43 PTN OF NW 1/4 DAF; BEG AT SW
COR OF LT 3 BLK 8 VALLEY VIEW HILLS ADD &
TRUE POB TH E 140 FT TH S 99.88 FT TH W 140
FT TH N 99.88 FT TO POB
Inspection Area: : (509)-477-3675
Owner: BISCONER REVOCABLE TRUST
Address: 6210 E MORELAND DR
SPOKANE VALLEY, WA 99212
Phone:
Email:
Water District: Spokane County Water Fire District: Fire District 8
District #3
Zoning: Land Area: 28744.8 Square Feet
CONTRACTOR INFORMATION:
CAPITC*895RL, Exp. 12/13/2013
CAPITOL CONSTRUCTION
4821 N GREENWOOD BLVD SPOKANE, WA 99205
509-723-7299
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 05/07/2013 11:39:32 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000625 Permit Issued Date: 05/07/2013
Expiration Date: 05/07/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/07/2013 11:39:32 Project Coordinator: Dawn Dompier