Loading...
2007, 11-08 Permit: 07004328 Residence' Spokane FValley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information 1 Site Address: 3717 S MORROW LN Parcel Number: 45342.3407 Subdivision: Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: LEXINGTON HOMES INC Address: PO BOX 141749 SPOKANE, WA 99214-1749 Building Inspector: SOUTH Water Dist: MODEL Project Number: 07004328 Inv: I Issue Date: 11/08/2007 Permit Use: NEW SFR -SEWER Applicant: LEXINGTON HOMES P.O. BOX 141749 SPOKANE WA 99214 Phone: (509) 924-1519 Contact: LEXINGTON HOMES P.O. BOX 141749 SPOKANE WA 99214 Phone: (509) 924-1519 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: Permits Building Permit Contractor: LEXINGTON HOMES License #: LEXINHI0251A I&2 FAMILY R-3 VB 1,589 RESIDENTIAL PERMIT FEE $1,587.35 2ND FLOOR R-3 VB 255 WSBC SURCHARGE $4 50 BASEMENT U R-3 VB 1,589 SF PLNS RVW < 7999 SQ FT $634.94 DECK OPEN' - R-3 VB 168 GARAGE U-1 VB 805 Total Permit Fee: $2,226 79 Total Value: $205,864 44 FOR BUILDING INSPECTIONS CALL. (509) 688-0054. Mechanical Permit Contractor: LEXINGTON HOMES License #: LEXINHI0251A GAS WATER HEATER 1 $10.00 GAS APPLIANCE<=100,000BT 1 $12.00 GAS PIPING 3 $3.00 VENTILATING FANS 4 $40.00 CLOTHES DRYER 1 $10.00 RANGE 1 $10.00 GAS LOG OR GAS INSERT 1 $10.00 HOOD -TYPE 11 1 $10.00 Total Permit Fee: $105.00 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. Plumbing Permit Contractor: LEXINGTON HOMES License #: LEXINHI025JA TOILETS/BIDETS 3 51800 SINKS 6 $36.00 SHOWERS 3 $18 00 TUBS 3 $18.00 DISH WASHERS 1 $6 00 GARBAGE DISPOSAL I $6.00 CLOTHES WASHER 1 $6 00 FLOOR DRAINS 1 $6.00 CROSS CONNECTION DEVICE 1 $6 00 MISCELLANEOUS FIXTURES 3 $18.00 Total Permit Fee: $138.00 FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Processed By: Main, Jodi L Printed By: TURBAK, MIKE Page 1 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking is in place. rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All pernits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Perms and inspections for eiecincal wring. State Department of Labor Permits and inspetlions for Sewer Connection, Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections for on-site septic systems, Spokane Regional Fire spnnkier and alarm systems and pnvate access road inspections, Spokane Valley Health Distnct 324-1560 Fire Department 892-4122 State law RCW 19.122 requires that pnor to any excavation the -CALL BEFORE VOL) DIG- center ,rust be notified Call before you dig al least 2 working days in advance. 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a perrnit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent /C/C ; !'$ Date // /e/t i Staff Approval Date S iokan6 eG e Valley® BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 3717 S MORROW LN SPOKANE VALLEY, WA 99206 Parcel Number: 45342.3407 Project Number: 07004328 Inv: 1 Issue Date: 11/08/2007 Permit Use: NEW SFR -SEWER Permits Payment Summary Total Fees AmountPaid AmountOwing $2,469.79 $2,469.79 $0.00 Tran Date Receipt N Payment Amt 11/08/2007 12033 $2,469.79 Processed By: Main, Jodi L Printed By: TURBAK. MIKE Page 2 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the perrnittee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in. before covering, and final MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants. fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails. skirting. etc. installed, and prior to occupancy, completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — pnor to placement of concrete/asphalt or. if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and Inspections for eiecmcal wrong, Stare Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division And lndustnes 324-2640 477-3604 Permits and Inspections for omsile septic systems. Spokane Regional Fire spnnkler and alarm systems and pnvate access road inspections. Spokane Valley Health ()mind 324-1560 Fire Department 892-4122 Stale law RCW 19122 requires that pnor to any excavation the 'CALL BEFORE YOU DIG' center must be notified Call before you dig at least 2 worlung days in advance, 456-8000, PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work Is not started within 180 days of obtaining a permit, or b) work Is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. /� i/ Owner / Agent / .✓ �f /�// Date if /C/67. r` Staff Approval Date