2012, 09-17 Permit App: BLD-2012-1596 Pole BldgS orkaanne®
.00.*Valley
Community Development
Fernvt tenter
11707 E • • gue Ave, Suite 106
Spokan ley, WA 99206
(509)68: • r 36 FAX: (509)688-
www.s•ok• evallev.or
Residential Constructioi
Permit Application
037
❑ New Co
❑ Additio
❑ Other:
PERMIT NUM;3t:x: l
PERMIT FEE:
struction
emodel
r` ZZ s , N4 6.-I ILIA -4-
SITE ADDRESS
ASSESSORS PARCEL NO:AP-17-Df.; \ I' 3
LEGAL DES
TION:
[Accessory Bldg
0 Deck
206
Phone: 36-Z— ,�j3t� Fax:
Address:
City:9#
Phone:
2C
State: �.
Describe the scope of work in detail:
f Project: $ /44 t DO
MUST be com
licable
HEIGHT TO PEAK:
# OF STORI
UNFIN BAS
MENT SQ. FTG:
-{9
**********************
ITOTAL HABIT,�BLSPACE:
IMPERVIOUSSURFACE
AREA:
DECK/COV
The permitee verifies, acknowledges find agrees by their si
dwelling is/will be served by potable Water. 2) Ownership
signatory is the property owner or haS permission to repre
in full compliance with the City of Spo ane Valley Develop
Spokane Valley Permit Center. 5) T is City of Spokane V
local laws, codes or ordinances. 6) ans or additional inf■
this application can berocessed.. Aj
�Nv
Signature
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 825/2005
Check
. HEAT SOU
nature that: 1) If
f this City of Spoka
nt the property o
ent Code. Refere
Iley Permit is not a
ation may be req
Mastercard
Expires:
SEWER O
SEPTIC?
Is permit is for construction of or on a dwelling, the
e Valley Permit inure to the property owner. 3) The
er in this transaction. 4) All construction is to be done
. codes are available for review at the City of
ermit or approval for any violation of federabefore
state or
ired to be submitted, and subsequently approved
Date _.
❑ VISA
VIN#:
__6W -71a.-.7_1 s--54
•
Target Date sheet
For City Use Only
PLUS Project - 'C' l l - i ' 4 -
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet _
this date, we will contact you with a revised target date.
Your application review TARGET DATE is 7 - �7 `"( "
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
D. Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
D Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1
SPOKANE POST FRAlV INC.
Engineered Pole Buildings
shops
garages
storage buildings
cabins
kits -cost plus
7001 E. 2nd Ave
Spokane, WA 99212
ROLFE WILL
Owner
509-926-0865 • Fax 509-924-5161
or 1-866-926-0865
Visit us at
www.spokanepostframe.com
Site Plan
5I low C d
North
Show streets/alley
Show septic/sewer/dralnfleld
Show existing buildings
Show proposed`6tltttttng
Show le tacks - front, r I_d9s.
Show lot Sfi� ;' 't
JOB NNIE 1'1 -4 --'"'co
PHONE s' 36
ADDRESS q22- s- AI
Oct -4l /tel 20‘
tEpAL DESCRIPTION
Vart -L4- Li6-203 - l-.3
ZONINQ CRITERIA SPokNLt
city_
If closer than 5' to property line - need firewall and parapet
Out of rear 30' and closer than 5' - need waiver from nelohbor
Can't cover more than 50% of rear 25'
Corner lot. - building must be 20' from property line
50' minimum setback from front property line
Less than 8' from residence - need firewall
Maximum square f ootage - 10% of lot area (Must be less than 3,000 sof t.)
1 -lay not subdivide lot so that building is more than 10% of residual lot area
LOUDLY
If closer than 5' to property line - need firewall
10' from septic/dralnfleld
Less than 6' from residence - need f irewall
MIERAL SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK
AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE
ALSO CHANGES WITH DIFFERENT ZONING.
;' minimum side yard setback
5' minimum rear yard setback
Minimum front and side street setback - 25' from property line or 55' from
center of road - whichever Is greater
/1%Lnl� ..T/Lc L ()
to -1..= -F4 77 3s fa
PLANNING DEPT. APPROVED
BY. 74' /�,
DATE. q//7/00/2 -
•Spoar"Fliane
Spokane Valley Municipal Code (SVM
asphalt, Portland cement, grasscrete,
the struct
Section 19.40.020.
paver blocks or othe
re you ara proposing
PART I — O
OWNER NAME: C hit 6-`1- (jl 0
ADDRESS: I -2-z_
1. Do you have an existin
2. Is the proposed detach
3. Do you plan on using t
what type of vehicles?
4. Do you plan to conduc
is the nature of your b
Commun
11703
509.720.5026
; `All residential dri
equivalent hard su
Is not going to requ
NER INFOR
esidential Driveway
PAVING WAIVER
ty Development — Planning Division
Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
Fax: 509.688.0037 • ptanning®spokanevaltey.org
eway and off-street parking areas shall be paved with
ace material". A paving waiver can only be granted if
re a driveway for daily use.
ATION
PARCEL #: 2 C 3 ` L-� /
STATE: ZIP: G rZ 06
EMAIL:
I,(PRINT NAME) OV -$C
form is true and correct. 1
the City to imp • -e paving
th
.pokane ley Comm
• caner
PART II —DET
garage for par
d structure use
le detached stru
a business fro
siness?
• ILS OF PAVI
Ing daily use ve
for storage onl
ture to park ve
G WAIVER
icles?
proposed deta •
YES ❑ NO
YES ❑ NO
cles? �ES ❑ NO If yes, then
Q s hat
PART I
r o
cknowledge th
requirements.
nity Developme
owner, hereby
t any change i
'I further agree t
Department,
TION
onIirm that'the information provided on this
this fnegoing conditions, coulslrequire
reepert-any changein these conditions to
anning Division, within 30 days.
nature
Date
PA
STAFF HAS REVIEWED THE PROPOSED PAVIN
DIRECTOR AND FIND THE REQUEST IS GRAN
SAID ADDRESS FOPERM T #:
Planning Division Sta
ignature
ON
ALF OF THE COMMUNITY DEVELOPMENT
Created 6/27/11
Page 1 of 1
SPOKANE POST FRAME, INC.
Engineered Pole Buildings
shops
garages
storage buildings
cabins
kits -cost plus
7001 E. 2nd Ave
Spokane, WA 99212
ROLFE WILL
• Owner
509-926-0865 • Fax 509-924-5161
or 1-866-926-0865
Visit us at
www.spokanepostframe.com
Site Plan
(North
Show streets/alley
Show septic/sewer/drain(leld
Show existing buildings
Show opose
Show epacks - front, r fId s.
Show t sr1Q�GCt —tZ—/
o
:- EP ?Oil
J06 NAME C-1/1.4-rvc
PI-K3NE " 362 3t�1
ADDRESS tel' 22 5 - AJL,vit-
5;oa `L i.4 L - z_06
CE AL DESCRIPTION
G 4.L Li 5-203 - 3 L -L 3
TONIN CRI It YA:='�b/PC/K?Mi SFR
SUB
If closer than 5' to property line - need f Irewall and parapet
Out of rear 30' and closer than 5' - need waiver from neighbor
Can't cover more than 50% of rear 25'
Corner lot - building must be 20' from property line
50' rnlnlmurn setback from front property line
Less than 8' from residence - need firewall
Maximum square footage - 10% of lot area (Must be less than 3,000 so. ft.)
Flay not subdivide lot so that building is more than 10% of residual lot area
county
If closer than 5' to property line - need firewall
I0' from septic/drainfleld
Less than 6' from residence - need firewall
MIER& SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK
AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE
ALSO CHANGES WITH DIFFERENT ZONING.
5' minimum side yard setback
5' minimum rear yard setback
Minimum front and side street setback - 25' from property line or 55' from
center of road - whichever Is greater
1
(/Viv7) C./4_6L0
1 = 'F/773S
PLANNING DEPT. APPROVED
BY: i4z
/77a7i6
DATE. 9/17/0072-