Loading...
2012, 09-17 Permit App: BLD-2012-1596 Pole BldgS orkaanne® .00.*Valley Community Development Fernvt tenter 11707 E • • gue Ave, Suite 106 Spokan ley, WA 99206 (509)68: • r 36 FAX: (509)688- www.s•ok• evallev.or Residential Constructioi Permit Application 037 ❑ New Co ❑ Additio ❑ Other: PERMIT NUM;3t:x: l PERMIT FEE: struction emodel r` ZZ s , N4 6.-I ILIA -4- SITE ADDRESS ASSESSORS PARCEL NO:AP-17-Df.; \ I' 3 LEGAL DES TION: [Accessory Bldg 0 Deck 206 Phone: 36-Z— ,�j3t� Fax: Address: City:9# Phone: 2C State: �. Describe the scope of work in detail: f Project: $ /44 t DO MUST be com licable HEIGHT TO PEAK: # OF STORI UNFIN BAS MENT SQ. FTG: -{9 ********************** ITOTAL HABIT,�BLSPACE: IMPERVIOUSSURFACE AREA: DECK/COV The permitee verifies, acknowledges find agrees by their si dwelling is/will be served by potable Water. 2) Ownership signatory is the property owner or haS permission to repre in full compliance with the City of Spo ane Valley Develop Spokane Valley Permit Center. 5) T is City of Spokane V local laws, codes or ordinances. 6) ans or additional inf■ this application can berocessed.. Aj �Nv Signature Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 825/2005 Check . HEAT SOU nature that: 1) If f this City of Spoka nt the property o ent Code. Refere Iley Permit is not a ation may be req Mastercard Expires: SEWER O SEPTIC? Is permit is for construction of or on a dwelling, the e Valley Permit inure to the property owner. 3) The er in this transaction. 4) All construction is to be done . codes are available for review at the City of ermit or approval for any violation of federabefore state or ired to be submitted, and subsequently approved Date _. ❑ VISA VIN#: __6W -71a.-.7_1 s--54 • Target Date sheet For City Use Only PLUS Project - 'C' l l - i ' 4 - Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet _ this date, we will contact you with a revised target date. Your application review TARGET DATE is 7 - �7 `"( " The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. D. Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. D Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 SPOKANE POST FRAlV INC. Engineered Pole Buildings shops garages storage buildings cabins kits -cost plus 7001 E. 2nd Ave Spokane, WA 99212 ROLFE WILL Owner 509-926-0865 • Fax 509-924-5161 or 1-866-926-0865 Visit us at www.spokanepostframe.com Site Plan 5I low C d North Show streets/alley Show septic/sewer/dralnfleld Show existing buildings Show proposed`6tltttttng Show le tacks - front, r I_d9s. Show lot Sfi� ;' 't JOB NNIE 1'1 -4 --'"'co PHONE s' 36 ADDRESS q22- s- AI Oct -4l /tel 20‘ tEpAL DESCRIPTION Vart -L4- Li6-203 - l-.3 ZONINQ CRITERIA SPokNLt city_ If closer than 5' to property line - need firewall and parapet Out of rear 30' and closer than 5' - need waiver from nelohbor Can't cover more than 50% of rear 25' Corner lot. - building must be 20' from property line 50' minimum setback from front property line Less than 8' from residence - need firewall Maximum square f ootage - 10% of lot area (Must be less than 3,000 sof t.) 1 -lay not subdivide lot so that building is more than 10% of residual lot area LOUDLY If closer than 5' to property line - need firewall 10' from septic/dralnfleld Less than 6' from residence - need f irewall MIERAL SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE ALSO CHANGES WITH DIFFERENT ZONING. ;' minimum side yard setback 5' minimum rear yard setback Minimum front and side street setback - 25' from property line or 55' from center of road - whichever Is greater /1%Lnl� ..T/Lc L () to -1..= -F4 77 3s fa PLANNING DEPT. APPROVED BY. 74' /�, DATE. q//7/00/2 - •Spoar"Fliane Spokane Valley Municipal Code (SVM asphalt, Portland cement, grasscrete, the struct Section 19.40.020. paver blocks or othe re you ara proposing PART I — O OWNER NAME: C hit 6-`1- (jl 0 ADDRESS: I -2-z_ 1. Do you have an existin 2. Is the proposed detach 3. Do you plan on using t what type of vehicles? 4. Do you plan to conduc is the nature of your b Commun 11703 509.720.5026 ; `All residential dri equivalent hard su Is not going to requ NER INFOR esidential Driveway PAVING WAIVER ty Development — Planning Division Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 Fax: 509.688.0037 • ptanning®spokanevaltey.org eway and off-street parking areas shall be paved with ace material". A paving waiver can only be granted if re a driveway for daily use. ATION PARCEL #: 2 C 3 ` L-� / STATE: ZIP: G rZ 06 EMAIL: I,(PRINT NAME) OV -$C form is true and correct. 1 the City to imp • -e paving th .pokane ley Comm • caner PART II —DET garage for par d structure use le detached stru a business fro siness? • ILS OF PAVI Ing daily use ve for storage onl ture to park ve G WAIVER icles? proposed deta • YES ❑ NO YES ❑ NO cles? �ES ❑ NO If yes, then Q s hat PART I r o cknowledge th requirements. nity Developme owner, hereby t any change i 'I further agree t Department, TION onIirm that'the information provided on this this fnegoing conditions, coulslrequire reepert-any changein these conditions to anning Division, within 30 days. nature Date PA STAFF HAS REVIEWED THE PROPOSED PAVIN DIRECTOR AND FIND THE REQUEST IS GRAN SAID ADDRESS FOPERM T #: Planning Division Sta ignature ON ALF OF THE COMMUNITY DEVELOPMENT Created 6/27/11 Page 1 of 1 SPOKANE POST FRAME, INC. Engineered Pole Buildings shops garages storage buildings cabins kits -cost plus 7001 E. 2nd Ave Spokane, WA 99212 ROLFE WILL • Owner 509-926-0865 • Fax 509-924-5161 or 1-866-926-0865 Visit us at www.spokanepostframe.com Site Plan (North Show streets/alley Show septic/sewer/drain(leld Show existing buildings Show opose Show epacks - front, r fId s. Show t sr1Q�GCt —tZ—/ o :- EP ?Oil J06 NAME C-1/1.4-rvc PI-K3NE " 362 3t�1 ADDRESS tel' 22 5 - AJL,vit- 5;oa `L i.4 L - z_06 CE AL DESCRIPTION G 4.L Li 5-203 - 3 L -L 3 TONIN CRI It YA:='�b/PC/K?Mi SFR SUB If closer than 5' to property line - need f Irewall and parapet Out of rear 30' and closer than 5' - need waiver from neighbor Can't cover more than 50% of rear 25' Corner lot - building must be 20' from property line 50' rnlnlmurn setback from front property line Less than 8' from residence - need firewall Maximum square footage - 10% of lot area (Must be less than 3,000 so. ft.) Flay not subdivide lot so that building is more than 10% of residual lot area county If closer than 5' to property line - need firewall I0' from septic/drainfleld Less than 6' from residence - need firewall MIER& SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE ALSO CHANGES WITH DIFFERENT ZONING. 5' minimum side yard setback 5' minimum rear yard setback Minimum front and side street setback - 25' from property line or 55' from center of road - whichever Is greater 1 (/Viv7) C./4_6L0 1 = 'F/773S PLANNING DEPT. APPROVED BY: i4z /77a7i6 DATE. 9/17/0072-