Loading...
2008, 03-31 Permit: 08001068 ResidenceSpokane e� .# Valley° BUILDING DIVISION 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 3824 S MORROW LN Parcel Number: 45342.3311 Subdivision: Block: Lot: Zoning: R-3 SF Res District Owner: CLIFF SCHMITZ CONSTRUCTION INC Address: 13903 E SPRAGUE AVE STE 210 SPOKANE, WA 99216 Building Inspector: EAST Water Dist: Project Number: 08001068 Permit Use: SFR W/ATT GAR Inv: 1 Issue Date: 03/31/2008 Applicant: CLIFF SCHMITZ CONSTRUCTION INC 13903 E SPRAGUE AVE STE 210 SPOKANE, WA 99216 Phone: (509) 999-7733 Contact: CLIFF SCHMITZ CONSTRUCTION INC 13903 E SPRAGUE AVE STE 210 SPOKANE, WA 99216 Phone: (509) 999-7733 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: Permits Building Permit Building Height 24 Contractor: CLIFF SCHMITZ CONSTRUCTION License #: CLIFFSCIO4RF 1&2 FAMILY R-3 VB 1,096 RESIDENTIAL PERMIT FEE $1,424 95 2ND FLOOR R-3 VB 492 WSBC SURCHARGE $4.50 BASEMENT U R-3 VB 1,096 SF PLNS RVW c 7999 SQ FT 5569.98 DECK OPEN R-3 VB 48 GARAGE U-1 VB 950 Total Permit Fee: $1,999.43 Total Value: $176,061.60 FOR BUILDING INSPECTIONS CALL (509) 688-0054. Mechanical Permit Contractor: CLIFF SCHMITZ CONSTRUCTION License #: CLIFFSC IO4RF GAS WATER HEATER 1 $10.00 GAS APPLIANCEc=100,000BT I $12.00 GAS PIPING 2 $2.00 VENTILATING FANS 2 $20.00 HOOD -TYPE II 1 510.00 Total Permit Fee: $54 00 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. Plumbing Permit Contractor: CLIFF SCHMITZ CONSTRUCTION License #: CLIFFSC 104RF TOILETS/BIDETS 2 $12.00 SINKS 3 518.00 TUBS 2 $12 00 DISH WASHERS I $6.00 GARBAGE DISPOSAL I $6.00 CLOTHES WASHER 1 $6.00 FLOOR DRAINS 1 $6.00 MISCELLANEOUS FIXTURES 3 $18 00 Total Permit Fee: $84 00 FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Processed By: DAVIS, JENNA Printed By: PATRICIA PRINCE Page 1 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING - after all framing, braang and blocking is in place. rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and pnor to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this perrnit Items such as the installation of fire hydrants. fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion., In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Perms and inspections for eiectncal winng, State Department of Labor Perm's and Inspections for Sewer Connection. Spokane County Utilities Division And lndustnes 324-2640 477-3604 Permis and inspections for on -sue septic systems, Spokane Regional Fire spnnkler and alarm systems and pnvaie access road Inspections. Spokane Wiley Health Dstnct 324-1560 Fire Department 892-4122 State law ROW 19122 requires that pnor to any excavation the'CALLBEFORE YOU DIG' center must be notified Call before you dig at least 2 working days In advance. 456-8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a perrnit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit Is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected Refunds of not more than 80% of a perrnit fee may be authorized when no work has been done under e pe it issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cagcell�d Jior to e plan review being completed. Owner / Agent Staff Approval Date 2---3 Date Spokane Valley® BUILDING DIVISION 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 3824 S MORROW LN SPOKANE VALLEY, WA 99206 Parcel Number: 45342.3311 Project Number: 08001068 Inv: 1 Issue Date: 03/31/2008 Permit Use: SFR W/ATT GAR Permits Payment Summary Total Fees AmountPaid AmountOwing $2,137.43 $2,137.43 $0.00 Tran Date Receipt N Payment Amt 03/31/2008 13465 $2,137.43 Processed By: DAVIS, JENNA Printed By: PATRICIA PRINCE Page 2 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures. including manufactured homes. NOTE. This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the venfication or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete. and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — pnor to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (Includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for electncal wuing. Stale Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division And Industries 324-2640 477-3604 Pemtls and inspections for on-s,te septic systems. Spokane Regional Fire spnnkler and alarm systems and private access road inspections. Spokane Valley Health Distnct 324-1560 Fire Department 892-4122 Stale law RCW 19122 requires that pnor to any excaval,on the -CALL BEFORE YOU DIG'centermusLbe notified Cali before you dig at least 2 working days in advance. 456.6000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of perrnit issuance, regardless of whether the work is finished If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee -rroneously paid or collected. Refunds of not more than 80% of a perrnit fee may be authorized when no work has been done unde- the•e t i- ued Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or can : Ile • pH. to w being completed. sada Owner / Agent Staff Approval Date 3— 3/ OY Date