2009, 04-26 Permit: 09000764 ResidenceOF ottki.
Spokane
Valley®
BUILDING DIVISION
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information Project Information
Site Address: 3826 S MORROW LN
Parcel Number: 45342.3312
Subdivision:
Block: Lot:
Zoning: R-3 SF Res District
Owner: CLIFF SCHMITZ CONSTRUCTION INC
Address: 13903 E SPRAGUE AVE STE 210
SPOKANE, WA 99216
Building inspector: SOUTH
Water Dist:
Project Number: 09000764 Inv: 1 Issue Date: 04/06/2009
Permit Use: NEW SFR W/ATT. GARAGE
Applicant: CLIFF SCHMITZ CONSTRUCTION
16520 E. SECRETARIAT
VERADALE, WA 99037 Phone: (509) 922-4297
Contact: CLIFF SCIIMITZ CONSTRUCTION
16520 E SECRETARIAT
VERADALE, WA 99037 Phone: (509) 922-4297
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name:
Permits
Bailclinp Permit
Contractor: CLIFF SCHMITZ CONSTRUCTION License #: CLIFFSCIO4RF
I ST FLOOR R-3 VB 529 RESIDENTIAL PERMIT FEE $1,189.75
2ND FLOOR R-3 VB 770 WSBCC SURCIIARGE $4.50
UNFIN. BSMT R-3 VB 445 SF PLNS RVW < 7999 SQ FT $475 90
COV DECK R-3 VB 25
A'I'f GARAGE U -I VB 98 l Total Permit Fee: $1,670.15
Total Value: $134,415 67
FOR BUILDING INSPECTIONS CALL (509) 688-0054
Mechanical Permit
Contractor: C & K PLUMBING License #: CKPLUKP940C4
GAS WATER HEATER 1 $11.00 GAS APPLIANCEr=I00,000BT I $13.00
GAS PIPING 2 $2.00 VENTILATING FANS 1 DUCT 3 $33 00
CLOTHES DRYER I $1000 RANGE 1 $10 00
HOOD -TYPE II 1 511 00
Total Permit Fee: 590.00
FOR MECIIANICAL INSPECTIONS CALL (509) 688-0054.
Phmthinj Permit
Contractor: C & K PLUMBING License #: CKPLUKP940C4
TOILETS/BIDETS 3 $18.00 SINKS 4 $2400
TUBS 2 51200 DISH WASHERS 1 $6.00
GARBAGE DISPOSAL 1 $600 CLOTHES WASHER 1 5600
FLOOR DRAINS I 56.00 MISCELLANEOUS FIXTURES 3 $18.00
"Total Permit Fee: $96.00
FOR PLUMBING INSPECTIONS CALL (509) 688-0054
Processed By: DAVIS, JENNA
Printed By: PATRICIA PRINCE Page 1 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection Includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete
PLUMBING - after rough -in, before covering, and final
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to Inspection of the structure. this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc installed, and prior to occupancy:
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above. any plumbing or mechanical systems or material which would be concealed by framing. drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Perm's and Inspections for electncal wring, State Department of Labor Perm's and Inspections for Sewer Connection. Spokane County UIbites Dreson
And Industries 324-2640 477-3604
Perm's and inspections for on-site septic systems. Spokane Regional Fire sprinkler and alarm systems and pnvate access road inspections. Spokane Valley
Health Distnct 324-1560 Fire Depanrnent 892-4122
State law RCW 19 122 requires that pnor to any excavation the 'CALL BEFORE YOU DIG- center crust be notified Cali before you dig al least 2 working days in advance, 456-8000
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work Is
finished. If a permit is expired for lime, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 160 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Date
Spokane e%
Valley
BUILDING DIVISION
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 3826 S MORROW LN
SPOKANE VALLEY, WA 99206
Parcel Number: 45342.3312
Project Number: 09000764 Inv: 1 Issue Date: 04/06/2009
Permit Use: NEW SFR W/ATT. GARAGE
Permits
Payment Summary
Total Fees AmountPaid AmountOwing
$1,856.15 $1,856.15 $0.00
Tran Date Receipt # Payment Amt
03/27/2009 17692 $455.74
04/06/2009 17768 $1,400.41
Processed By: DAVIS. JENNA
Printed By: PATRICIA PRINCE Page 2 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the venfication or location of your property lines Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants. fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 668-0195 or State Dept of Transportation
324-6000
Permits and inspections for electoral wnng, Slate Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Dtvsion
And lndustnes 324-2640
477.3604
Permits and inspections for on-site septic systems, Spokane Regional Fire spnnkler and alarm systems and pnvate access road inspections. Spokane Valley
Health Distncl 324-1560 Fire Department 692-4122
State law RCW 19 122 requires that poor to any excavation the -CALL BEFORE YOU DIG- center must be notified Call before you dig al least 2 working days in advance, 456-8000
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work Is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance. regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made In writing by the origin
payment. 100% refunds will be granted for any fs - er
authorized when no work has been done under
when an application is withdrawn or can ,' Iled
Owner / Agent
Staff Approval
ittee to the Building Official no later than 180 days after the date of fee
id or colla ted. Refunds of not more than 80% of a permit fee may be
Refund .f not more than 80% of a plan review fee paid may be authorized
view b -%g completed.
Date
Date