Loading...
2009, 04-01 Permit App: 09000764 ResidenceProject Number: 09000764 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/1/2009 Page 1 of 3 Project Information: Permit Use: NEW SFR W/ATT. GARAGE Contact: CLIFF SCHMITZ CONSTRUCTION Address: 16520 E. SECRETARIAT C - S - Z: VERADALE, WA 99037 Setbacks: Front Left: Right: Rear: Phone: (509) 922-4297 Group Name: Site Information: Project Name: Plat Key: Name: Range District: Sout Parcel Number: 45342.3312 Block: Lot: SiteAddress: 3826 S MORROW LN Location:: CSV Zoning: R-3 Water District: Area: 8,421 Sq Ft Nbr of Bldgs: 0 Review Information: SF Res District Width: 0 Nbr of Dwellings: 0 Owner: Name: CLIFF SCHMITZ CONSTRUCTIO Address: 13903 E SPRAGUE AVE STE 210 SPOKANE, WA 99216 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: Landuse/Zoning/H E Conditions 4/1/2009 By: tmelbourn Released By: Sewer Review Permits: Originally Released: 3/30/2009 By: MPALANIU Released By: PERMIT # 07008804 Originally Released: 3/27/2009 By: MTURBAK Operator: JD Printed By: jmm Print Date: 4/1/2009 Project Number: 09000764 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/1/2009 Page 2 of 3 Contractor: CLIFF SCHMITZ Address: 16520 E SECRETARIAT VERADALE WA 99037 Description Grp Type I&2 FAMILY R-3 VB 2ND FLOOR R-3 VB BASEMENT U R-3 VB COV DECK R-3 VB GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Building Permit Notes 1ST FLOOR 2ND FLOOR UNFIN. BSMT COV DECK ATT GARAGE Contractor: C & K PLUMBING Address: 5231 W NAVAJO SPOKANE, WA 99208 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS 1 DUCT CLOTHES DRYER RANGE HOOD -TYPE 11 Totals: Firm: CLIFF SCHMITZ CONSTRUCTIO Phone: (509) 922-4297 This Application: Total Project: Su Ft Valuation Sq Ft Valuation 529 $51,223.07 529 $51,223.07 770 $57,503.60 770 $57,503.60 445 $6,675.00 445 $6,675.00 25 $375.00 25 $375.00 981 518,639.00 981 $18,639.00 2,750 $134,415.67 2,750 $134,415.67 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Mechanical Permit Units 1 1 2 3 1 1 1 Operator: JD Printed By: jmm Fee Amount $1,189.75 $4.50 5475.90 $1,670.15 Firm: C & K PLUMBING Phone: (509) 489-3906 Unit Desc NUMBER OF NUMBER OF # OF UNITS NUMBER OF NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Print Date: Fee Amount $11.00 $13.00 $2.00 $33.00 $10.00 $10.00 $11.00 $90.00 4/1/2009 Project Number: 09000764 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/1/2009 Contractor: C & K PLUMBING Address: 5231 W NAVAJO SPOKANE, WA 99208 Item Description TOILETS/BIDETS SINKS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER FLOOR DRAINS MISCELLANEOUS FIXTURES Plumbing Permit Page 3 of 3 Firm: C & K PLUMBING Phone: (509) 489-3906 Units Unit Desc 3 NUMBER OF 4 NUMBER OF 2 NUMBER OF 1 NUMBER OF 1 NUMBER OF I NUMBER OF 1 NUMBER OF 3 NUMBER OF Permit Total Fees: Fee Amount $18.00 $24.00 $12.00 $6.00 $6.00 $6.00 $6.00 $18.00 $96.00 Notes: , Payment Summary: Permit Type Building Permit Mechanical Permit Plumbing Permit Fee Amount $1,670.15 $90.00 $96.00 Invoice Amount $1,670.15 $90.00 $96.00 $1,856.15 $1,856.15 Amount Paid $455.74 $0.00 $0.00 Amount Owing $1,214.41 $90.00 $96.00 $455.74 $1,400.41 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 4/1/2009 Permit Center cm or• 11703 E Sprague Ave, Suite B-3 Spokane Spokane Valley, WA 99206 valleycool(509)688-0036 FAX: (509)688-0037 www. spokanevallev.org Community Development Residential Construction Permit Application PERMIT NUMBER: () J vl PERMIT FEE: ® New Construction ❑ Addition/Remodel ❑ Other: ❑ Accessory Bldg ❑ Deck SITE ADDRESS: 3 A2_10 S. mDCXDiti) Pp^ eCK ASSESSORS PARCEL NO: Y<3 y2- S S iZ LEGAL DESCRIPTION: L / Z B l glom 3,--Talai Describe the scope of work in detail: nuew 1? ES /02n62, Proposed Use: le,(S \Opal HQ 1 Cost of Project: 1271 ,DQD,o • • _ �..********************** **************The Iollowmg e. a' BuildirkOwner g r;'>s ' . Contractor..: Vit;, 5 *, ; • .'`= r'1::a` :az ;` ° s.- M .� r. at,.t , Name: C 6 Name: C: 1�F SC )TL e�ttl�% . AJC iTT Y t Address: J Address: ih5v, t. ste,zefr-A -r City: State: Zip: City: t%ip Q4"1..e., State: w4 Zip:9963 Phone: Fax: Phone: Off''7- 33 Fax: q _i-StOO __// 7� �� DEC OV PATIO SQ FTG: PATIO Exp Date: SQ. FTG: # OF BEDROOMS: Contractor Lic No: �CoinfactPersdi-L I <. _-�. - . SEWER OiIC? City Business Lic. No: Name' 0,1(PP SC1-fy-n1T7 Phnnr 4QQ• % l3 Describe the scope of work in detail: nuew 1? ES /02n62, Proposed Use: le,(S \Opal HQ 1 Cost of Project: 1271 ,DQD,o • • _ �..********************** **************The Iollowmg HEIGHT TO PEP(: DIMENSIONS: I x 4/6 # OF STO ES: I h- TOTAL HABITABLE SPACE: Z138 MAIN FLOOR TO SQ. FTG: N�y X5.2 ? ( 2"" FLOOR SQ. FTG: <G '� UNFIN BASEMENT SQ. FTG: — i/IS IMPERVIOUS SURFACE AREA: Q `J BAS » FINISHED BASE NTD GARAGjSQ. FTG: o f8/ ►.S'� DEC OV PATIO SQ FTG: PATIO 30% SLOPES ON PROPERTY: 011er SQ. FTG: # OF BEDROOMS: CONSj N TYPE: CONST HEAT URC : SEWER OiIC? The permitee verges, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) T is City .f Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances 6 'I a or =dditional information may be required to be submitted, and subsequently approved before this application can be prbc ss tSIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 Check ❑ Mastercard Expires: /7 RECEIVED BY �pl ATE: , Q7 CITY OF SPOKANE VALLEY MAR 2 7 2009 ❑ VISA PE VIN#: BY: Permit Center pus, sr _O''^n�" e ` 11703 E Sprague Ave, Surte B-3 ti7�2 �fA� 7�1 Spokane Valley, WA 99206 V� lley (509)688-0036 FAX' (509)688-0037 Community Development panni tcentergesnokaneva liev.org Mechanical Permit Application n Commercial SITE ADDRESS: 311-o 5• nib z) ,If PERMIT NUMBER: 0-1/2 —� PERMIT FEE: Residential Building Owner Name: Phone Fax. Address: City. State' Zip: Contractor Name. Address: C k_bi lo5 Phone Fax: City. State' Zip: License No. City Business Lic' Contact/Project Manager: Phone EXPIRES ❑CASH 0 CHECK 0 VISA 0 MC SIGNATURE CARD # CURRENT FEES AVAILABLE AT: http:/Mnvw.spokanevalley.org//uploads/Operations_and_Administration/Finance/MasterFeeSchedule pdf P:\Community Development \Building Division\]odi-comm'I\PCF \DRAFT APPS\DRAFT Mechanical Permit App..doc #UNITS FURNACES 8 SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to 8 including 100,000 BTU I FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER l GAS PIPING SYSTEM (each outlet) GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp -100.000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 - 15 hp - 100,001 to 500,000 BTU BOILER, COMPRESSORS. ABSORPTIONS SYSTEM Over 15 - 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp - 1,000.001 to 1,750,000 BTU BOILER. COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp - overt 750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 ctm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct 3 VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range. Clothes Washer 2 - UNLISTED APPLIANCES UNLISTED Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II 1 L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM - FREE STANDING EXPIRES ❑CASH 0 CHECK 0 VISA 0 MC SIGNATURE CARD # CURRENT FEES AVAILABLE AT: http:/Mnvw.spokanevalley.org//uploads/Operations_and_Administration/Finance/MasterFeeSchedule pdf P:\Community Development \Building Division\]odi-comm'I\PCF \DRAFT APPS\DRAFT Mechanical Permit App..doc Pei mit ('enter Spokane 11703 I: Sprague Ave, Suite R-3 Walley Spokane Valley, WA 99206 (509)688-0036 FAX (509)68R-0037 Community Development peon'', r:u St spokain_.,.11c. (se Plumbing Permit Application In Commercial PERMIT NUMBER: V I PERMIT FEE: Residential SITE ADDRESS: ' L i! / S • 0\ t) Ia?O tLL Building Owner Name Phone Fax. Address City State: hip: Contractor Name Addt Cs>' e rJ6 Phone Fax. City Stale Zip License No ('ity Business Lie Contact/Project Manager: Phone: DCASH 0 CHECK D VISA ❑ MC EXPIRES. Card# VIN SIGNATURE CURRENT FEES AVAILABLE AT: http //wwwspokanevalley.org//uploads/Operations_and_Administration/Finance/MasterFeeSchedule.pdf P:\Community Development \Building Division \Jodi-comm'I\PCF \DRAFT APPS\DRAFT plumbing APP.doc • # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS V URINALS TUBS .2 SHOWERS (per trap) Lav/Basins. Bar, Floor, Kitchen, Laundry, Utility, Janitor. Photo, X-ray, Food. Prep/Culinary Meat -a-&- / I i SINKS DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL / WATER SOFTNER FLOOR DRAIN Area, Case, Coil. Trench. Condensate / ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN. DRINKING WATER PIPING/DRAIN-IN WASTE Installation. Alterations. Repair, Reversals WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carhonator. swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas. See Mechanical INDUS TRIAL WASTE PRETREATEMENT INCEPTORS Including traps. vents except kitchen typo grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS DCASH 0 CHECK D VISA ❑ MC EXPIRES. Card# VIN SIGNATURE CURRENT FEES AVAILABLE AT: http //wwwspokanevalley.org//uploads/Operations_and_Administration/Finance/MasterFeeSchedule.pdf P:\Community Development \Building Division \Jodi-comm'I\PCF \DRAFT APPS\DRAFT plumbing APP.doc Spokane Valley. • For City Use Only PLUS Project Number 0(1 000-7in'- Project Address 382 -co '5. MOff3W L..Iv.: 11703E Sprague Ave Suite 8-3 • Spokane Valley:WA 99206' 509.688.0036 ♦ Fax: 509.688:0037 $'p errnlfcenter®sPokanevalley.brg As part of our on-going :commitment to customer•, service during the review' process 'of your project application; we are providing you with a TARGET DATE for the initial technicalapplication review:.If fro- any orany reason we cannot meet this date; we will contact you with a revised target date: . Lj/z/b1 Your application review, TARGET DATE is The TARGET DATE' is the date we estimate' your project application. will have had its initial technical review. It is not the date for approval or.'permit issuance. -Tips-for a Smoother Project Application Review Submit complete, accurate plans and documents. E.rtra lw;e may be required jot: re -submittals as project application reviewers work on multiple applications and it may be several days before thev can look at your new or revised information, • .. Designate a specific contact person to communicate with the City. . While the person designated as the applicant's contact person sidth the City, can be changed, one individual with the ecperli.se,fin dealing with reviewer Comments would he the bast choice for the with-Li/review. process. ' • i Call staff regarding the status of your project only after the target date shown at the top of thelpage. - . ; , ' . Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us ' by your target date. Staff may contact you before the target. date if the'initial reyiew'is conrpleie.•Bv following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. • • - , '- . Steps in the Permit Process- - 1. Counter Complete. Your appliication,has been accepted, as counter complete. This means all: of The required. documents, as indicated on your Pre -Application Checklist have been submitted or have been .approved -for deferred submittal. This, does not prevent technical staff from' requesting additionat-information as a result of their technical -review. 2. Quality Check. The next step in the process is a quality check to•make sure that the appl,ication.is reviewable.and free from substantive flaws that would prevent technical.staff from completing the•technical review onee- it' is.started. When this step is complete, your application will be; routed to the appropriate, staff and -remain in their'review•queue until it comes up for review... • 3. Technical Compliance. Once an, application is administratively complefe,;it is routed to technical staff for compliance review. Depending on the type of project, technical staff may 'include multiple reviewers. You -should be contacted by. phone, fax, email, or mail by your TARGET DATE once the initial technical compliance'r'eview is:complete. .` . 4. Permit Issuance. When the technical compliance review of the application' is complete, including any subsequent reL submittals. each reviewer will approbe.their section of the application and route it -to the'Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified"on your . application for permit pick-up. Information regarding fees and pre, construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07