Loading...
2009, 10-12 Permit App: 09003137 Garage, ApproachProject Number: 09003137 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/12/2009 Page 1 of 2 Project Information: Permit Use: NEW GARAGE AND APPROACH Setbacks: Front Left: Right: Rear: Site Information: Plat Key: Name: Range Contact: VIALL, DAVID E & SHALAMARI Address: 11021 E NIXON AVE C - S - Z: SPOKANE VALLEY, WA 99206 Phone: (509) 389-0171 Group Name: Project Name: District: Nort Parcel Number: 45163.0412 SiteAddress: 11021 E NIXON AVE Location:: CSV Block: Zoning: R-3 SF Res District Water District: 011 MODERN Area: 15,514 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Lot: Owner: Name: VIALL, DAVID E & SHALAMARI Address: 11021 E NIXON AVE SPOKANE VALLEY, WA 99206 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Driveway/Approach Originally Released: 10/12/2009 By: tmelbourn Released By: Originally Released: 9/30/2009 By: WMCGAV Landuse/Zoning/HE Conditions Permits: Released, By: THE NEW GARAGE MUST BE ATTACHED TO THE HOUSE -MH Originally Released: 10/2/2009 By: MHARNOI Operator: jmm Printed By: JD Print Date: 10/12/2009 Project Number: 09003137 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/12/2009 Page 2 of 2 Approach Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 Item Description APPROACH -CONST IN ROW Units Unit Desc Fee Amount 1 NUMBER OF $50.00 Permit Total Fees: $50.00 Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB 937 $17,803.00 937 $17,803.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 937 $17,803.00 937 $17,803.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $293.25 $73.31 $4.50 Permit Total Fees: $371.06 THE NEW GARAGE MUST BE ATTACHED TO THE HOUSE -MH Payment Summary: Permit Type Approach Building Permit Fee Amount $50.00 $371.06 Invoice Amount $50.00 $371.06 Amount Paid $0.00 $73.31 Amount Owing $50.00 $297.75 $421.06 $421.06 $73.31 $347.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 10/12/2009 Permit Center Scruor �11703 E Sprague Ave, Suite B-3 pokane Spokane Valley, WA 992Q5-.-- --�_— 37 Wr w.JVnuu �:• la. CENTER Community Development GS1 PERMIT CEN ` Residential Constructionp 3 g 2009 Ne Construction Accessory Bldg Permit Application: .E„ 7-,-31,53---Add tion/Remodel Deck l ..>Oth : : PERMIT NUMBER: j 3/ 3 7 PERMIT FEE: SITE ADDRESS: 00)-i • t4 ASSESSORS PARCEL NO: % 5/ 3• D"/c LEGAL DESCRIPTION: Building Owner: DIMENSIONS: : ` I Name1� I , 4Ja Ue- V 1 X11 Name: Address: j IO)/ z,, I)vovi 2"" FLOOR SQ. FTG: City: `7 c1-6 ie State: v/� Zip:99)0� Phone: 37.) 7_3 e%- U 21 7 Fax: 1 v6.,2_ ye„s�6 Contac Person Name: Om; r Phone: _9'07 - 3et'- 07/ Contractor: DIMENSIONS: # OF STORIES: I Name: MAIN FLOOR TO SQ. FTG: ,,,--;:7'w e..=-OP 2"" FLOOR SQ. FTG: Address: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: City: State: Zip: Phone: Fax: CONSTR TION TYPE: LA,- cx) c) Contractor Lic No: Exp Date: City Business Lic. No: Descipp thA scope of work in de-01:iJ Cost/of P oject: $ 1 / (tn.5 e k � ivy S �n CcArrek41 uvo✓f-, ric,5 ^vC"F \iS S� PrI�✓��l�a ljo 1 -/// Proposed Use: ( .r S ral r � C[ e ()e I l e 5t v c,.) CcI ✓S + P ,15 **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: I TOTAL HABITrABLiiiii� PACE: MAIN FLOOR TO SQ. FTG: ,,,--;:7'w e..=-OP 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE Q. FT x'37 _ - =_ = ` DCK/COV. PATIO S .FTG: 30% SLOPES ON PROPERTY: _ # OF BEDROOMS: CONSTR TION TYPE: LA,- cx) c) HEAT SOURCE: 6c s Of Flee' , SEWER OR SEP C? lie ✓- The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with t - ity of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Perm' Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or o dinances.lans1additional information may be required to be submitted, and subsequently approved before this application can b: processe SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 D Check ❑ Mastercard Expires: DATE: // ❑ VISA VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details O Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations o Handrail / Guard height & spacing Permit Center__., 11703 E S rague Av, rC tV D Community Development Spokane V 11ey, WAt nCFNiER Stiokane Valley® (509)688-0 36 1�3�`!f(. vvww.s oka evalle .ora Approach Permit Applicaiol -- - PROJECT ADDRESS ' / /t4"1761/ START DA I P1() 145 (Al /0 PERMIT NUMBER: 9- 3 3'7 PERMIT FEE: �, (S', 44'Yi'.^ 0 ANTICIPATED COMPLETION DA 1'h //p' n f gyp/ O BuildingQwner: Contractor: Name: a tl L0 I q ,� Name: Address: j 0) / c, /1/ I,w✓) Address: City: �p 1�q N (> State: l.v,- Zip:? 'C, City: State: Zip: Phone: $ 3< ? - c..)7/ 2 Fax: �O i 4II,2- 2/G,_5-6, Phone: Fax: Contact Person .u' ( Contractor Lic No: Exp Date: Name: City Business Lic. No: Phone: PROJECT DESCRIPTION (Provide site sketch) Residential Driveway Existing Curb & Gutter Culvert Installation Other Conditions Commercial/Industrial Driveway Rural Road Section Sidewalk Repair/Construction Bond/Insurance certification must be on file with the city. DISCLAIMER The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Cen r) 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinan - s. ) Plans or additional formation may be required to be submitted, and subsequently approved before this application can b pr.cessed. Signature Method ofPayment: ❑ Cash ❑ Check Bankcard #: Authorized Signature: REVISED 316/66 Date ❑ Mastercard *VISA Expires: VIN#: Si�1'" Urban Driveway Approach .000%Hey Requirements ► Minimum of 7.5' from property line ► Minimum of 5' from crosswalks or intersection curb arc ► Minimum of 16' wide flat portion of approach ► Maximum of 30' wide flat portion of approach ► Combined approach width not to exceed 50% of total frontage ► Minimum of 15' of separation between any two approaches ** All driveway approaches to be constructed per the Spokane County Standards as adopted by the City of Spokane Valley ** S154511°:eNs Valley @ For City Use,Ortly, PLUS Project Number •)/ Project Address /(): / % (i/ 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a reviseddtarget date. / L)/(49 Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 1 0 8 3? 36 . Sc no 1)(C) si coo .SQ Mir R EC FiVED sv FERmiri CENTER c$EP 0,2009 Prbje,7t Ntme .r Submittal # I /p -,;2-0, 11 APPROVEDtria cwirz_r_z_44in / (IJ) o \