1990, 08-25 Permit App: D1978/ZE-42-90 Residence/officeDate: A- 26.= 9
SPOKANE COUNTY PLANNING DEPARTMENT
APPLICATION FOR ZONE RECLASSIFICATION
�� Application No: L / V (2
7/7744;&,--* Sa ae,/G.yr ,(‘,7>ez///n1e
Name of applicant: /77erl //),
Street address of Qappl-tsara S /D 7
City:
Name
176 4.04, -
SDG
S.DrY Z- State: G(14.- Zip Code: 99,70%
of property owner(s): /4/ede- GU..4,46,-
Phone:
a4, r
Phone: 3S-- ?s-//
Authorized agent representing owner
(if other than owner):, D40/6- 64-r- •,7 //1/76 -
Existing
t7c
Existing zoning classification:
n,3
Date existing zone classification established:
Existing use of property: /res.
/979
Proposed zone classification: Ute- ZZ
Proposed use of property: (%44 e
Legal description of property: 7-Att ?or -74/0Y7 of 770(.6 77�/ j ,lites''(i
t)iez-r` z y,,, y sir c, /Vo a- w,50,.. re., s w y 6,4
._ce-G . /D %u//- Ar FaiG mfr e ---/l/7 ree -/s 4,1 .S�x).�4, . W.-1.
Section: S t1' /0
Township: c2 -S -
Source of legal: �jsSFssp,'S /�ir�l.�ctr3o,i
Range: eiq
Assessor's Parcel No. (see tax statement): -4/-70 3
Property size: (7• 7 6' 4e_ Frontage: 5-/G Feet on:
Total amount of adjoining land controlled by this owner or sponsor:
Street address of property: /a9/B /16YCc five_
If you do not hold title td' the --property affected by this application, what is your
interest in it? Oen /
Please list previous Planning Department actions involvi g this property:
GF,(7/6- C
ALL OF THE FOLLOWING QUESTIONS MUST BE ANSWERED:
1. What are the changed conditions of the site area�� which you feel make this
proposal is
is warranted?(te/ eyn1e5 �� �lGl�llr� aim/ aft
C.74eS - c��/'el s�f't tes i5 cC(�?//�� �c� �a VZ SA .
/-?e 7, Iorz r �e j �,ik- t-, , i '4 i��,�aGsG a w
/4 7r� y C. c-. off , • C eVc-yecw.o.) .
2. What effect will the proposed zone reclassification have on the adjacent
properties? /%P - bar s s,/e ;,774) r-a)s/s cy
This section of the application will provide the Planning Department's staff with
written verification that the applicant has had preliminary consultation
with the agencies identified. Results of the preliminary consultation should be
incorporated in the proposal before final submittal to the Planning Department.
ZE
V.'
"^r
APPLICATION FOR ZONE RECLASSIFICATION
PAGE 2
1 COUNTY ENGINEER'S OFFICE
A preliminary consultation has been held to discuss the proposal. Our
rements or submittal of this proposal for rezone have been01114 1: satisfied.
(Sigature) (Da )
2.— COUNTY UTILITIES OFFICE
A preliminary consultation has been held to discuss the proposal. Our
uirements for •mittal of this proposal for rezone hie bee
feed. The d: t= water purveyor for this site is G,�y�/
(S',4w• ature)
3!'WATER PURVEYOR
a) The proposal
area.
b) Satisfactory arrangements (have)
propos
c) We
(Date)
is not) located within the boundary of our service
been made to serve this
ble to serve this site with adequate water.
t/3/ke
(Signa re) (Date)
4.1 BUILDING AND SAFETY DEPARTMENT
A preliminary consultation has been held to discuss the proposal. Our
requirements for submittal of this proposal for rezone have been satisfied.
This proposal is located in Fire District No.
% Igo
(Date)
5.
ture)
5, COUNTY HEALTH DISTRICT
A preliminary consultation has been held to discuss the proposal. The
applica t as been informed of our requirements and standards.
1
8'-3/ --q a
( j nature) (Date)
I, THE DERSIGNED, SWEAR UNDER PENALTY OF PERJURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE.
I FURTHER SWEAR THAT J AM THE OWNER OF RECORD OF THE SITE PROPOSED FOR ZONE
RECLASSIFICATION. OR IF NOT THE OWNER. ATTACHED HEREWITH IS WRITTEN
PERMISSION FROM_ D OWNER AUTHORIZING MY ACTIONS ON HIS OR HER BEHALF.
(Signed): /.T/. 41.016,, _ _
(Address): 5'1 7 tlK/ar//
NOTARY SEAL:
e Gfk..
eiw�ti /I a.•. �
NOTARY: sc_ -
Date: -- _73--9e)
Phone: r3 S- -- ZS/ /
Zip: g9aDy
Date: Vac %4 u
SIGNATURE OF APPLICANT OR AGENT
Date:
REV.4/89:fcu
9
SpOK AN
11•4 -TE. Ft, O N A
. - -�
-
0
Z
N
No. 150 7144;...,.,
I t1
I r:l ^ J
A I 111Y.,..;.II J
• I �� �Ipo
QI��
�I �I�d
k 1 C.7 „ 15
14
`029 't. 1�.�•
•
2. 1 ` 30 j
•
300.5
616.5
SpoK
l50
s• r -
's.4
et"
Nb
A
24 -
MISSION
EO
L
0
L
ZS
Cf,
--.--- = gam
AVENUE 1 (See Ns
0;
• 0I
I
(-)I
ti h,
MISsioN AVE. N' 2.3t--
MISSION
3t-
�A�ENU
DATE
O ESC R /PT /ON
6 - /5- 172
TH/S SECT/ON REPRODUCED FROM LINEN TO MyL.AR.
ZL --?-y'd
/4 �y
C. Ic)9I8 N0(4•Aile
SPOKANE COUNTY
HEARING EXAMINER COMMITTEE
FINDINGS OF FACT, CONCLUSIONS AND ORDER
INTRODUCTION
This matter has come before the Hearing Examiner Committee on November 29,
1990. The members of the Committee present are Phil Harris, Chairperson, Verona
Southern and Bud Skadan.
PROPOSAL
The sponsor, Merle Haffner, requests approval of a zone reclassification, File No.
ZE-42-90, Multiple Family Suburban (MFS) to Urban Residential -22 (UR -22) to
allow development of an office complex.
FINDINGS OF FACT AND CONCLUSIONS
1. The property is generally located south of I-90 and south of and adjacent to Nora
Avenue. The site is approximately 1/4 mile east of Pines Road in Section 10,
Township 25 N., Range 44 EWM, Spokane County, Washington.
2. The committee adopts the Planning Department Report as a part of this record.
3. The existing land uses in the area include single family residences, offices and
retirement apartments.
4. The Comprehensive Plan designates this site as Urban. The Urban category is
intended to provide for a variety of land uses in an intensive "city like" environment.
5. The Arterial Road Plan designates Nora Avenue as a local access street, with a
recommended right of way width of 60 feet.
6. The existing zoning of the property described in the application is Multiple Family
Suburban, previously established in 1979.
7. The provisions of RCW 43.21C (The State Environmental Policy Act) have been
complied with and a Determination of Nonsignificance was issued.
8. The legal requirements for public notice have been fulfilled
9. The owners of adjacent lands expressed neither approval or disapproval of the
proposed use.
10. The proposed use is compatible with existing uses in the area.
11. The proposed zoning does implement and conform to the Comprehensive Plan.
12. The applicant has demonstrated that conditions have substantially changed since the
original zoning of this area and accordingly, the proposed zone reclassification is
justified.
HEC Order for ZE-42-90 Page 2
13. The proposed use will not be detrimental to the public health, safety, morals or
welfare.
CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL
1. All Conditions imposed by the Hearing Examiner Committee shall be binding on the
"Applicant," which term shall include the owner or owners of the property, heirs,
assigns, and successors -in -interest.
2. The following Conditions of Approval apply to the real property described below:
that portion of tracts 11 and 12, Assessor's Plat #6 lying southerly of Nora Avenue
within the SW 1/4 of Section 10, Township 25 N., Range 44 EWM.
HEARING EXAMINER COMMITTEE
1. The Spokane County Hearing Examiner Committee added Spokane County Air
Pollution Control Authority Condition of Approval 1 through 4 as contained herein.
COUNTY PLANNING DEPARTMENT
1. A specific development plan shall be submitted for Planning Department review and
approval prior to issuance of building permits. Construction must be judged as
proceeding according to the plan or constitute a zoning violation.
2. Approval is required by the Planning Director/designee of a specific lighting and
signing plan for the described property prior to the release of any building permits.
3. A specific landscape plan, planting schedule and provisions for maintenance
acceptable to the Planning Director/designee shall be submitted with a performance
bond for the project prior to release of building permits. Landscaping shall be
installed and maintained so that sight distance at access points is not obscured or
impaired
4. The existing residence on the site may be converted to office use. Existing
landscaping may be utilized to satisfy landscaping requirements until such time that
a building permit is requested to enlarge or construct additional office space. At that
time, a site development plan and landscape plan will be required and all
requirements of the Urban Residential -22 (UR -22) Zone shall be met.
5. The Planning Department shall file with the Spokane County Auditor, within the
same time frame as allowed for an appeal from the fmal disposition, including
lapsing of appeal period, a Title Notice, which shall generally provide as follows:
"Prior to the issuance of any building permit for any building or any use on the
property described herein, the applicant shall be responsible for complying with the
provisions of the Zoning Code for Spokane County, Section 14.706 (Aquifer
Sensitive Area Overlay Zone). The property which is the subject of this notice is
HEC Order for ZE-42-90 Page 3
more particularly described as follows: That portion of tracts 11 and 12,
Assessor's Plat #6, lying southerly of Nora Avenue within the SW1/4 of Section
10, Township 25 North, Range 44 EWM, Spokane County, Washington."
6. The Planning Department shall prepare and record with the Spokane County
Auditor a Title Notice noting that the property in question is subject to a variety of
special conditions imposed as a result of approval of a land use action. This Title
Notice shall serve as public notice of the conditions of approval affecting the
property in question. The Title Notice should be recorded within the same time
frame as allowed for an appeal and shall only be released, in full or in part, by the
Planning Department. The Title Notice shall generally provide as follows:
The parcel of property legally described as that portion of tracts 11
and 12, Assessor's Plat #6, lying southerly of Nora Avenue within
the SW1/4 of Section 10, Township 25 North, Range 44 EWM,
Spokane County, Washington, is the subject of a land use action by a
Spokane County Hearing Body or Administrative Official on
November 29, 1990, imposing a variety of special development
conditions. File No. ZE-42-90 is available for inspection and
copying in the Spokane County Planning Department.
COUNTY ENGINEER'S OFFICE
Prior To The Issuance Of A Building Permit Or Use Of The Property As Proposed:
1. Applicant shall dedicate 10 feet on Nora Avenue for right-of-way.
2. The word "applicant" shall include the owner or owners of the property, his heirs,
assigns and successors.
3. Access permits for approaches to the county road system shall be obtained from the
Spokane County Engineer.
4. The applicant shall submit for approval by the Spokane County Engineer road,
drainage and access plans.
5. The applicant shall submit for approval by the Spokane County Engineer and the
Spokane County Health District a detailed combined on-site sewage system plan
and surface water disposal plan for the entire project, or portion thereof, if the
development is to be phased.
6. A parking plan and traffic circulation plan shall be submitted and approved by the
Spokane County Engineer. The design, location and arrangement of parking stalls
shall be in accordance with standard traffic engineering practices. Paving or
surfacing as approved by the County Engineer, will be required for any portion of
the project which is to be occupied or traveled by vehicles.
7. To construct the roadway improvements stated herein, the applicant may, with the
approval of the County Engineer, join in and be willing to participate in any
petition or resolution which purpose is the formation of a Road Improvement
District (RID) for said improvement, pursuant to RCW 36.88, as amended.
HEC Order for ZE-42-90 Page 4
Spokane County will not participate in the cost of these improvements. This is
applicable to Nora Avenue.
8. As an alternative method of constructing the road improvements stated herein, the
applicant may, with the approval of the County Engineer, accomplish the road
improvements stated herein by joining and participating in a County Road Project
(CRP) to the extent of the required improvement. Spokane County will not
participate in the cost of these improvements. This is applicable to Nora Avenue.
9. The construction of the road improvements stated herein shall be accomplished as
approved by the Spokane County Engineer.
10. The County Engineer has designated Typical Roadway Section Number One, Local
Access standard for the improvement of Nora Avenue, which is adjacent to the
proposed development. This will require the addition of approximately 8 -10 feet
of asphalt along the frontage of the development. The construction of curbing and
sidewalk is also required.
11. All required improvements shall conform to the current State of Washington
Standard Specifications for Road and Bridge Construction and other applicable
County standards and/or adopted resolutions pertaining to Road Standards and
Stormwater Management in effect at the date of construction, unless otherwise
approved by the County Engineer.
12. Applicant shall construct a paved and delineated approach(es) to meet the existing
pavement on Nora Avenue.
13. Roadway standards, typical roadway sections and drainage plan requirements are
found in Spokane Board of County Commissioners Resolution No. 80-1592 as
amended and are applicable to this proposal.
14. This subdivision or development proposal is located within a drainage basin which
has been identified by the Spokane County Engineer's office as having stormwater
runoff problems. Since this plat or development proposal is affected by or is a
contributor to stormwater flows, property owners should participate in the planning
and implementation of a future basinwide stormwater management system. The
following statement shall be placed in the plat dedication:
"The owner(s) or successor(s) in interest agree to join in any County -approved
stormwater management program and to pay such rates and charges as may be fixed
through public hearings for service or benefit obtained by the planning, design,
constructing, maintaining or operation of stormwater control facilities."
15. No construction work shall be performed within the existing or proposed public
right-of-way until a permit has been issued by the County Engineer. All work
within the public mad right-of-way is subject to inspection and approval by the
County Engineer.
16. All required construction within the existing or proposed public right-of-way is to
be completed prior to the release of a building permit, or a bond in an amount
.estimated by the County Engineer to cover the cost of construction of improvements
shall be filed with the County Engineer.
HEC Order for ZE-42-90 Page 5
17. Applicant shall sign and record Spokane County Notice to the Public No. 6 which
specifies the following:
The owner(s) or successor(s) in interest agree to authorize the County to place their
name(s) on a petition for the formation of a Road Improvement District (RID) by
the petition method pursuant to Chapter 36.88 RCW, which petition includes the
owner(s) property, and further not to object, by the signing of a ballot, the
formation of a RID by the resolution method pursuant to Chapter 36.88 RCW,
which resolution includes the owner(s) property. If an RID is formed by either the
petition or resolution method, as provided for in Chapter 36.88 RCW, the owner(s)
or successor(s) further agree:
(a) that the improvement or construction contemplated within the proposed RID is
feasible;
(b) that the benefits to be derived from the formation of the RID by the property
included therein, together with the amount of any County participation,
exceeds the cost and expense of formation of the RID; and
(c) that the property within the proposed RID is sufficiently developed.
Provided further that the owner(s) or successor(s) shall retain the right, as
authorized under RCW 36.88.090, to object to any assessment on the property as a
result of the improvements called for in conjunction with the formation of the RID
by either petition or resolution method under Chapter 36.88 RCW.
This requirement applies to Nora Avenue, from which the subject parcel takes
access.
COUNTY UTILITIES DEPARTMENT
1. Applicant shall make connection to public sewer system. Sewer connection permit
is required. Plans and specifications are to be reviewed and approved by the
Utilities Department.
COUNTY HEALTH DISTRICT
1. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane
County.
2. Water service shall be coordinated through the Director of Utilities, Spokane
County.
3. Water service shall be by an existing public water supply when approved by the
Regional Engineer (Spokane), State Department of Health.
4. A public sewer system will be made available for the project, and individual service
will be provided to each lot/tract prior to sale. Use of individual on-site sewage
disposal systems shall not be authorized.
HEC Order for ZE-42-90 Page 6
5. Use of private wells and water systems is prohibited.
COUNTY BUILDING AND SAFETY DEPARTMENT
1. The applicant shall contact the Department of Building and Safety at the earliest
possible stage of design/development in order to be informed of code requirements
administered/enforced by the department, e.g., State Building Code Act
regulations, such as requirements for fire hydrant/flow, fire apparatus access roads,
street address assignment, barrier -free regulations, energy code regulations and
general coordination with other aspects of project implementation.
2. Requirements of Fire District No. 1 need to be satisfied during the building permit
process.
SPOKANE COUNTY AIR POLLUTION CONTROL AUTHORITY
1. Air pollution regulations require that dust emissions during demolition, construction
and excavation projects be controlled. This may require use of water sprays, tarps,
sprinklers or suspension of activity during certain weather conditions. Haul roads
should be treated, and emissions from the transfer of earthen material must be
controlled, as well as emissions from all other construction -related activities.
2. All traveled surfaces (ingress, egress, parking areas, access roads) must be paved
and kept clean.
3. Measures must be taken to avoid the deposition of dirt and mud from unpaved
surfaces onto paved surfaces. If tracking or spills occur on paved surfaces,
measures must be taken immediately to clean these surfaces.
4. Debris generated as a result of this project must be disposed of by means other than
burning.
HEC Order for ZE-42-90 Page 7
WIDER
The Hearing Examiner Committee, pursuant to the above Findings of Fact and
Conclusion, APPROVES the application of Merle Haffner for Rezone No. ZE-42-90
Zone Reclassification from Multiple Family Suburban (MFS) to Urban Residential -22
(UR -22) as described in the application ZE-42-90.
Motion by: Southern Seconded by: Skadan
Vote: (3-0) UNANIMOUS TO APPROVE THE ZONE CHANGE
HEARING EXAMINER COMMTI"thE
HEREBY ATTEST TO THE ABOVE FINDINGS, ORDER, AND VOTE
ATTEST:
For WALLIS D. HUBBARD
PlanningDirector
AUL F. JENSEN
Senior Planner
Date
kc
Pursuant to County regulations, any aggrieved party has the right to appeal this written
decision to the Spokane County Board of County Commissioners within ten (10) calendar
days of the signing of this order. Upon receipt of an appeal, a public hearing will be
scheduled. If you desire to file such an appeal, you must submit a written appeal,
preferably on forms designed for such purpose, to the Board of County Commissioners,
W. 1116 Broadway, Spokane, WA 99260, along with $100 processing fee payable to the
Spokane County Treasurer.
If you have any questions, please call the Planning Department at 456-2205.
rev 1/90
liti. 1
S P O K A N E r sit m � '� C O U N T
DEPARTMENT OF BUILDING AND SAFETY • A DIVISION OF THE PUBLIC WORKS DEPARTMENT
JAMES L. MANSON. DIRECTOR DENNIS M. SCOTT, DIRECTOR
TO: 20 NI N 6 alit i t N I 5TePitOlanning Department
FROM: Tom Davis, Code Compliance Coordinator
DATE: .1'4:A 2 lci9 0
RE: File Number: ZE - 142-40
Address: E. 12918 Noir
Our comments regarding the above are reflected in the marked box(es) below:
HZ -
The applicant shall contact the Department of Buildings at the earliest possible stage of design/development in order to be
informedd of code requirements administered/enforced by the department; e.g., State Building Code Act regulations such as
requirements for fire hydrant/flow. fire apparatus access roads, street address assignment, barrier -free regulations, energy code
regulations, and general coordination with other aspects of project implementation.
The issuance of a building permit by the Department of Buildings is required.
Requirements of Fire District No. .- need to be satisfied during the building permit process.
The applicant is advised that the private road shall be named and signed in accordance with the provisions of Spokane County
Road Standards. This condition may be waived in the event that the Department of Buildings determines addressing on the
private road is not acceptable. However, at such time the Department of Buildings feels the need for the road to become a
private, named road, the applicant/owner shall participate and cooperate in this process.
The required fire flow for any building or subdivision is determined by building size, type of construction and proximity of
exposures. Based on information presented to this office regarding this subdivision, the minimum fire flow established by code
of 500 gallons per minute for 30 minutes is being required.
We have no requirements for this proposal - existing conditions.
Specific comments are as follows:
WEST 1303 BROADWAY • SPOKANE, WASHINGTON 99260-0050 • (509) 456-3675
FAX (509) 456-4703