09-055.00 Inland Asphalt: Pines Mansfield Congestion Relief ~ 1AfaSN igton State . ~ Change Order ~ Date 4/20/2009 Page 1 of 4 Pages Contract Number 08-016 Federal Aid Number CM-9932 (032) Contract TiUe Pines-Manfield Corridor Congestion Relief Project Change Order Number 14 Prime Contractor Inland Asphalt N Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ❑ Change proposed by Contractor Endorsed By Surety Consent C ~ , Attomey on Fact DOW~t,C, DEU Original Contract Amount 3,0613,916.95 Current Contract Amount 391553,298.13 Estimated Net Change This Order 30,948.24 Estimated Contract Total After Change 39186,246.37 Approval Required ❑ Region ❑ Olympia Service Center N Local Agency If the amount authorized in the Local Agency Agreement is exceeded and federal funds are not available for this change, the Local Agency will assume the total cost of this Change Order. ~ Approval Recommended E:] Approved Approv c ProJed Ersglrreer roving Author(ty . greeme ~ Date Date F-~ Approval Recommended F~ Approved Other Approval When Requfred By Stgneture Dete Qate Represerttng DOT Form 140-005 EF Revised 10/97 C09-055 CHANGE ORDER Page 2 of 4 Contract No: 08-016 Change Order No. 14 This Contract is revised as follows: Description of Work The Contractor may use C900 PVC pipe in lieu of Schedule A Storm Sewer Pipe for pipe runs at the roundabout and on Mansfield Avenue as approved by the Engineer. The Contractor shall replace the one Precast Concrete Drywell Type B- Swale, located in the swale on the swouthwest comer of Pines/Mansfield, with 2 Precast Concrete Drywell Type A- Swale. The Contractor shall install one Precast Concrete Drywell Type B- Swale, in the ditch line on Montgomery Avenue at STateion T 14+50 Rt. In accordance with page 109 of the Special Provisions, Section 7-09.3(1)A is supplemented, and a new contract item, Rock Excavation for Drainage, will be added. Lines 1 through 14 on page 139 of the Special Provisions are deleted. Materials C900 PVC 8 Inch Diam. shall meet the requirements of Section 9-30.1(5)A. Gravel Backfill for Drywells shall meet the requirements of Section 9-03.12(5) Measurement C900 PVC 8 Inch Diam. shall be measured by the linear foot. Payment Payment will be made for each of the following items: Existing contract items: Item 16, uPrecast Concrete Drywell Type B- Swale", per each. Item 81, "Other Traffic Control Labor," per hour. Item 82, "Flaggers and Spotters," per hour. New contract items: "Precast Concrete Drywell Type A- Swale", per each "C900 PVC 8 Inch Diam.", per linear foot. "Rock Excavation for Drainage", by force account as provided in Section 1-09.6. CHANGE ORDER Page 3 of 4 Contract Time Three (3) working days will be added to Contract Time as a result of this Change Order Attachments None CHANGE ORDER Page 4 of 4 Contract No: 08-016 Change Order No.14 Item No. Group No. Item Description Unit Unit Price Est. Qty. EsL AmL Change Measure Change 16 4 Precast Concrete Drywell Type B- S1Nale EA $2,000.00 -1 ($2,000.00) 16 5 Precast Concrete Drywell Type & S1Nale EA $2,000.00 1 $2,000.00 NEVII 5 Precast Concrete Drywell Type A- Swale EA $2,000.00 2 $4,000.00 24 5 Schedule A Starm S1wewe Pipe 12 In. Diam. LF $25.50 -274 ($6,987.00) NEW 5 C900 PVC 8 Inch Diam LF $25.50 274 $6,987.00 NEW 5 Rock Excavation For Drainage EST $24,523.24 1 $24,523.24 81 5 Other Traffic Control HOUR $42.50 10 $425.00 82 5 Flaggers and Spotters HOUR $40.00 50 $2000.00 TOTAL $309848.24