Loading...
09-054.00 Inland Asphalt: Pines Mansfield Congestion Relief ~ ~ washhigt°" ".tte Change Order - Minor Change ~ Departmerrt of T1rarisportation . Contract Number Contract Title Federal Aid Number TA-2942 Pines - Mansfield Corridor Congestion Relief Project CM-9932(032) Change Order Number Change Description Date 15 Pines/Mansfield Rt. Tum Lane Widening Apr 3, 2009 Region Project Engineer Phone Number Eastern Region Steven M. Worley , 509-688-0198 Prime Contractor / Design-Builder Inland Asnhalt ComDanv , 0 Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications or the RFP ❑ Change proposed by Contractor / Design-Builder , Change Description The General Special Provisions for this project are supplemented as follows: ' Description . Provide additional earthwork to facilitate the lengthening of the right tum lane for eastbound Mansfield Avenue. Payment The lump sum ainount of $1556.63 shall be full pay for all labor, equipment, and materiars to perform the work as specified. Contract Time 1 Working Day will be added as a result of this Change Order. All work, materials and measurements to be in accordance with the provisions of the Contract for the type of construction involved unless stated otherwise in this document Original Contract Amount Current Contract Amount Est. Net Change This C.O. Est. Revised Contract Amount $ 33,0612916.95 $ 3,1982826.70 $ 1556.63 $ 332003,383.33 , Prime Contractor / Design-Builder " Signature or Method of Concurrence: Date Oq ~ . Project Engineer's Signature for Execution: Date Distribution: Copy w/Attachments - Steven M. Worley Page 1 Copy of page 1 onty w/o Attachments - PrimeContrador / Design-Builder " Copy w/o Attachments - ER Construction Office DOTForm 421-005A EF Original w/o Attachments - State Construction Office Revised 2108 C09-054