2011, 08-02 Permit: 11002281Tear Off, ReroofSibFkane
.0Valley®
Permit Center
11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 4 email: permitcenter@spokanevalley.org
1
Site Information
Project Information
Site Address: 1316 S NEWER RD
Parcel Number: 45234.3205
Subdivision:
Block: Lot:
Zoning: R-3 SP Res District
Owner: DI IAENENS. KARMA
Address: 1316 S NEWER RD
VERADALE, WA 99037-9742
Building Inspector: EAST
Water Dist: VERA
Project Number: 11002281 Inv: 1 Issue Date: 08/02/2011
Permit Use: TEAR OFF
Applicant: PREMIER ROOFING CONTRACTORS
2608 N COLEMAN RD
SPOKANE VALLEY WA 99212 Phone: (509) 216-6540
Contact: PREMIER ROOFING CONTRACTORS
2608 N COLEMAN RI)
SPOKANE VALLEY WA 99212 Phone: (509) 216-6540
Setbacks - Front: Left: Right:
Group Name:
Project Name:
Rear:
1 Permits
Building Permit Contractor: PREMIER ROOFING CONTRACTORS
License /4: PRIEMIC'931BB
'FEAR OFF
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
R-3 VB 0 RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
$6,725 00
$139 25
$4.50
Total Permit Fee: $143.75
Payment Summary
Total Fees AmountPaid AmountOwing
5143.75 5143.75 50.00
Tran Date Receipt # Payment Amt
08/02/2011 27795 $143.75
Processed By: DAVIS. JENNA
Printed By: MORRIS. HEATHER Page 1 of 1
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please venfy their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL - when complete and prior to occupancy and/or use; all permits require final inspection.
" NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of
a permrt/srte plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover
RIGHT-OF-WAY/APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one-time 30 -day extension available. Right-of-way permits issued between October 1, and March 31, shall be
valid until the following April 30. •
Refunds:
/
All refund requests must be made in writinAby the2original permite to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any,permit issued iin error•. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit.application'L copy of this schedule is available at Permit Center and also available
for reference on the city website at: http://www.spokane-valley.orq andfsearch for "fees"
Owner/Agent Date:
Staff Approval Date: