Loading...
2013, 03-06 Permit: SW-13000157 SewerSPOKANE COUNTY UTILITIES PERMIT pplication Number: SW -13000157 Permit Issued Date: 03/06/2013 roject Description: SEWER CONNECTION roject Name: CORBIN rimary Contact: BOUCHER CONSTRUCTION LLC hone: 509-953-3274 Applicant: BOUCHER CONSTRUCTION LLC Address: 10 N HARMONY RD GREENACRES, WA 99016 Phone: 509-953-3274 Email: ITE INFORMATION: ite Address: arcel Number: 19010 E NIXON AVE 55173.1705 ssessor's Description: GUTHRIES VLY VW 5TH L5 B7 spection Area: : (509)-477-3675 Owner: FOX, TANYA J/ BONDS, ALICE V Address: 19010 E NIXON AVE SPOKANE VALLEY, WA Phone: Email: Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Dning: Land Area: 10950 Square Feet )NTRACTOR INFORMATION: IUCHC*954P5, Exp. 10/25/2013 IUCHER CONSTRUCTION LLC N HARMONY RD ;EENACRES, WA 99016 3-953-3274 :TAILS: ass Type Quantity Unit Charge Value :WER SEWER CONNECTION 1 $125.00 $125.00 E DETAIL: cessing - Utilities ities Permit Total Fee: $26.32 $125.00 $151.32 $125.00 INDITIONS: n review fee is required for all site plan reviews conducted by Spokane Valley Fire. ide Public Transit Benefit Area LL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE ;TALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE LATED TO TRENCH SAFETY. R SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. IE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES PLY AFTER 30 MINUTES. ;TALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF WER STUB PRIOR TO ANY OTHER EXCAVATION. to Printed: 03/06/2013 14:21:05 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000157 Permit Issued Date: 03/06/2013 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 03/06/2013 14:21:05 Project Coordinator: Kathy Cummings