Loading...
2015, 02-06 Permit: SW-15000077 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000077 Permit Issued Date: 02/06/2015 Expiration Date: 02/06/2016 Project Description: Project Name: Primary Contact: Phone: SEWER CENTENNIAL PLACE PH2 - LOT 7, BLOCK 6 MARKHAM HOMES INC 509- 927-1437 Applicant: MARKHAM HOMES INC Address: Phone: Email: PO BOX 14130 SPOKANE VALLEY, WA 99214 509-927-1437 info@markhamhomesinc.com SITE INFORMATION: Site Address: Parcel Number: 16914 E NORA AVE 45124.1007 Assessor's Description: 12-25-44: CENTENNIAL PLACE PHASE 2 (AFN# 6334285) L7 B6 Inspection Area: : (509)477-3675 Zoning: Owner: Address: Phone: Email: MARKHAM HOMES INC PO BOX 14130 SPOKANE VALLEY, WA 99214 509-927-1437 info@markhamhomesinc.com Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Land Area: 6011 Square Feet CONTRACTOR INFORMATION: MARKHH1971DK, Exp. 03/12/2015 MARKHAM HOMES INC PO BOX 14130 SPOKANE VALLEY, WA 99214 509- 927-1437 info@markhamhomesinc.com DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $27.12 $125.00 $152.12 $125,00 $125.00 $125.00 j Project its —b -)C3 RECEIVED FEB 0 9 2015 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CSV PERMIT CENTER SUB rF �� REV. CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES I HE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 02/06/2015 07:44:13 Project Coordinator: Susan Clark