Loading...
2015, 02-11 Permit: BLD-2015-0205 Plumbing FixturesSfokane City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter@spokanevalley.org BLD -2015-0205 PROJECT NAME: SITE ADDRESS: 16914 E NORA AVE SPOKANE VALLEY BLD -PLUM ISSUED: 02/11/2015 EXPIRES: 02/11/2017 PROJECT DESCRIPTION: INSTALL PLUMBING FIXTURES FOR NEW RESIDENCE. PARCEL: 45124.1007 APPLICANT: MARKHAM HOMES INC OWNER: LGIE LLC PO BOX 14130 SPOKANE VALLEY, WA99214 504 E FAIRHAVEN AVE 509-927-1437 BURLINGTON, WA98233 GENERAL CONTRACTOR: MARKHAM HOMES INC PO BOX 14130 SPOKANE VALLEY, WA99214 509-927-1437 License: MARKHHI971DK Expires: 03/12/2015 FEES: Paid Due Plumbing Permit $104.00 $0.00 Totals : $104.00 $0.00 FIXTURES Qty Plumbing Fixtures 1 Repair or alteration of water piping, drainage or vent piping 15 Each plumbing fixture on a trap (includes garbage disposals, dishwashers, backflow device, drainage, hot tubs, built-in water softener, water closets, lavatories, sinks, drains, etc.) Printed by : Tamara Faurot on: 02/11/2015 02:08 PM Page 1 of 2 SP%kane Dalley. City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter(@spokanevalley.org BLD -PLUM BLD -2015-0205 The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and n ay necessitate removal of certain parts of the construction are the applicant's / permittee's or property owner's\e pense. ( Owner/Age-� �,��.�� Date: 11I Staff Approval Date: Printed by : Tamara Fauroton: 02/11/2015 02:08 PM Page 2 of 2