09-009.00 Inland Asphalt: Pines Mansfield Congestion Relief
~
~ state
Change Order
p~ment of Tiran~po~on Date 1/2/2009
Pege 1 of 3 PeQes
Contrad Number 08-016 Federal Aid Number CM-9932 (032)
contract ntle Pines-Maufield Corridor Congestion Relief Project
Change Order Number 13
Prime Contractor 1n1and ASphalt ,
~ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications
❑ Change proposed by Contractor
Endorsed By Surety Consent
t. •
C
✓ Atcomey on Fad
\1
paw - Dffie
Original Contract Amount 3,061,916.95
Current Contract Amount 39155,298.13
Estmated Net Change This Order -19066.00
Estimated Contract Total After Change 391549232.13
Approval Required ❑ Region ❑ Olympia Service Center N Local Agency
If the amount authorized in the Local Agency Agreement is exceeded and federel funds are not available fior this
change, the Local Agency will assume the total cost of this Change Order.
~ Approval Recommended ~ Approved
AM&VO 4 i'
► ver c
9e e
~ -
F] Approval Reoommended F-] qpproved Other Approval When Required
ey signewm oO
paW Represwft
J
30T Form 140-005 EF
Revfsed 10197
C09-009
~
$
CHANGE ORDER
Page 2 of 3
Contract No: 08-016 Change Order No. 13
This Contract is revised as follows
Description of Work
Item 49, Cement Concrete Curb Type M shall be deleted The Contractor shall install
Item 52, Extruded Curb in all locations that Cement Concrete Curb Type M was
specified
Contract Time
Contract time will not be adjusted as a result of this Change Order
Attachments
None
~ ~ • r.
CHANGE ORDER
Page 3 of 3
Contract No: 08-016 Change Order No.13
Item No. Group No. Item Description Unit Unit Price Est. Qty. Est. Amt. Change
Measure Change
49 5 Cement Concrete Curb Type M LF $12 35 -520 ($6,422 00)
52 5 Extruded Curb LF $10 30 520 $5,356 00
TOTAL ($1,066.00)