Loading...
09-009.00 Inland Asphalt: Pines Mansfield Congestion Relief ~ ~ state Change Order p~ment of Tiran~po~on Date 1/2/2009 Pege 1 of 3 PeQes Contrad Number 08-016 Federal Aid Number CM-9932 (032) contract ntle Pines-Maufield Corridor Congestion Relief Project Change Order Number 13 Prime Contractor 1n1and ASphalt , ~ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ❑ Change proposed by Contractor Endorsed By Surety Consent t. • C ✓ Atcomey on Fad \1 paw - Dffie Original Contract Amount 3,061,916.95 Current Contract Amount 39155,298.13 Estmated Net Change This Order -19066.00 Estimated Contract Total After Change 391549232.13 Approval Required ❑ Region ❑ Olympia Service Center N Local Agency If the amount authorized in the Local Agency Agreement is exceeded and federel funds are not available fior this change, the Local Agency will assume the total cost of this Change Order. ~ Approval Recommended ~ Approved AM&VO 4 i' ► ver c 9e e ~ - F] Approval Reoommended F-] qpproved Other Approval When Required ey signewm oO paW Represwft J 30T Form 140-005 EF Revfsed 10197 C09-009 ~ $ CHANGE ORDER Page 2 of 3 Contract No: 08-016 Change Order No. 13 This Contract is revised as follows Description of Work Item 49, Cement Concrete Curb Type M shall be deleted The Contractor shall install Item 52, Extruded Curb in all locations that Cement Concrete Curb Type M was specified Contract Time Contract time will not be adjusted as a result of this Change Order Attachments None ~ ~ • r. CHANGE ORDER Page 3 of 3 Contract No: 08-016 Change Order No.13 Item No. Group No. Item Description Unit Unit Price Est. Qty. Est. Amt. Change Measure Change 49 5 Cement Concrete Curb Type M LF $12 35 -520 ($6,422 00) 52 5 Extruded Curb LF $10 30 520 $5,356 00 TOTAL ($1,066.00)