09-008.00 Inland Asphalt: Pines Mansfield Congestion Relief AdMk ~ Washington'Uiate Department of Transportation Change Order - Minor Change Contract Number Contract Title Federal Atd Number TA-2942 Pines-Mansfield Corridor Congestion Relief Project CM-9932(032) Change Order Number Change Description Date 12 Concrete Intersection Tie-In Jan 5, 2009 Region Project Engineer Phone Number Eastern Region Steven M. Worley 509-688-0198 Prime Contractor Inland Asphalt Company N Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ❑ Change proposed by Contractor Change Description The General Special Provisions for this project are supplemented as follows: , Description Perform additional saw cut and pavement removal, as well as backfilling with controlled density fill (CDF) for the area between the concrete intersection and the remaining existing asphalt. Payment The lump sum amount of $768.40 shall be full pay for all labor, equipment and materials to perform the work specified. All work, materials and measurements to be In accordance with the provisions of the Standard Speclflcations and Speciel Provisions tor the type of conetrucdon involved unless stated otherwise In this document Original Contract Amount Current Contract Amount Est Net Change This C O Est Revised Contract Amount $ 390619916.95 $ 391549529.73 $ 768.40 $ 33,1559298.13 Prime Contractor Signature or w ` Method of Concurrenoe Date~JPA , QS ZO°L t ~ Project Engineer's Signature for Execwtion ~ Date 22 a7 Distribution Original w/Attachments - Steven M Worley Pe 1 Copy of page 1 only w/o Attachments - Iniand Asphalt Comparry 9e Copy w/o Attachments - ER Construcbon Office DOT Fomt 421-005A EF Copy w/o Attachments - State Construction Oftfce Rev(W 4/2002 C09-008