2015, 02-06 Permit: SW-15000078 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000078
Permit Issued Date: 02/06/2015
Expiration Date: 02/06/2016
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER
CENTENNIAL PLACE PH2 - LOT 2, BLOCK 6
MARKHAM HOMES INC
509-927-1437
Applicant: MARKHAM HOMES INC
Address:
Phone:
Email:
PO BOX 14130
SPOKANE VALLEY, WA 99214
509- 927-1437
info@markhamhomesinc.com
SITE INFORMATION:
Site Address:
Parcel Number:
17010 E NORA AVE
45124.1002
Assessor's Description: 12-25-44: CENTENNIAL PLACE PHASE 2 (AFN#
6334285) L2 B6
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
MARKHAM HOMES INC
PO BOX 14130
SPOKANE VALLEY, WA 99214
509-927-1437
info@markhamhomesinc.com
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Land Area: 6938 Square Feet
CONTRACTOR INFORMATION:
MARKH H 1971 DK, Exp. 03/12/2015
MARKHAM HOMES INC
PO BOX 14130 SPOKANE VALLEY, WA 99214
509- 927-1437
info@markhamhomesinc.com
DETAILS:
Class
Type
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
Quantity Unit Charge Value
1 $125.00 $125.00
$126.00
Project # ( L� — 615 —6194
RECEIVED
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CSV PERMIT CENTER
Inside Public Transit Benefit Area EE ff
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPO JANEBCOU TY CODC'REQUIRES TPic
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 02/06/2015 07:43:54 Project Coordinator: Susan Clark