Loading...
2013, 02-19 Permit: SW-13000092 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -13000092 Permit Issued Date: 02/19/2013 Expiration Date: Project Description: SEWER CONNECTION Project Name: CORBIN Permit Type: SEWER Primary Contact: LAUER EXCAVATION & CONST Applicant LAUER EXCAVATION & CONST Address. PO BOX 11581 SPOKANE VALLEY, WA 99211 Phone: 509-981-7954 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: 19217 E NIXON AVE 55173.1319 CORBIN ADDITION GUTHRIE'S VALLEY VIEW 5TH ADDITION BLK 3 LT 19 Owner: CRC DESIGNS & CONSTRUCTION Address: 157 S MONROE ST SPOKANE, WA 99201-4528 Phone' Email: Water District: Fire District: Spokane Valley Fire Consolidated Irrigation District #19 Zoning: Land Area: 9921.65 Square Feet CONTRACTOR INFORMATION: General Contractor LAUEREC931 DA LAUER EXCAVATION & CONST PO BOX 11581 SPOKANE VALLEY, WA 99211 509-981-7954 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $26.32 $125.00 $151.32 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Pnnted: 02/19/2013 12:56:16 Printed by: 115 APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -13000092 02/19/2013 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 02/19/2013 12:56:16 Printed by: IIS APPPOOL\SmartGovProdApp