2013, 02-19 Permit: SW-13000092 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -13000092
Permit Issued Date:
02/19/2013
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: CORBIN
Permit Type: SEWER
Primary Contact: LAUER EXCAVATION & CONST
Applicant LAUER EXCAVATION & CONST
Address. PO BOX 11581
SPOKANE VALLEY, WA 99211
Phone: 509-981-7954
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
19217 E NIXON AVE
55173.1319
CORBIN ADDITION
GUTHRIE'S VALLEY VIEW 5TH ADDITION
BLK 3
LT 19
Owner: CRC DESIGNS & CONSTRUCTION
Address: 157 S MONROE ST
SPOKANE, WA 99201-4528
Phone'
Email:
Water District: Fire District: Spokane Valley Fire
Consolidated Irrigation
District #19
Zoning: Land Area: 9921.65 Square Feet
CONTRACTOR INFORMATION:
General Contractor
LAUEREC931 DA
LAUER EXCAVATION & CONST
PO BOX 11581
SPOKANE VALLEY, WA 99211
509-981-7954
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$26.32
$125.00
$151.32
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Pnnted: 02/19/2013 12:56:16
Printed by: 115 APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -13000092 02/19/2013
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 02/19/2013 12:56:16 Printed by: IIS APPPOOL\SmartGovProdApp