Loading...
2012, 10-08 Permit: SW-12002345 SewerSPOKANE COUNT'rBU!LDING AND PLANNING PERMIT Application Number: SW -12002345 Permit Issued Date: 10/08/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: CORBIN Permit Type: SEWER Primary Contact: BOUCHER CONSTRUCTION LLC Applicant: BOUCHER CONSTRUCTION LLC Address: 10 N HARMONY RD GREENACRES, WA 99016 Phone: 509-953-3274 Email: SITE INFORMATION• Site Address. Parcel Number. 19318 E NIXON AVE 55173.1404 Subdivision: CORBIN ADDITION Assessor's Description: GUTHRIES VLY VW 5TH L4 B4 Inspection Area: Water District: Consolidated Irrigation District #19 Zoning: Land Area: 10400 Square Feet Owner: KENNERSON, KIERAN J & STEPHANIE C Address: 19318 E NIXON AVE SPOKANE VALLEY, WA 99016-9650 Phone: Email: Fire District: Spokane Valley Fire CONTRACTOR INFORMATION: General Contractor BOUCHC*954P5 BOUCHER CONSTRUCTION LLC 10 N HARMONY RD GREENACRES, WA 99016 509-953-3274 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 525.94 5125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed 10/08/2012 13'19:19 Printed by. IIS APPPOOLWSP.NET v4.0 7 SPOKANE COUNT'; BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002345 10/08/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed 10/08/2012 13:19:19 Printed by' 118 APPPOODASP.NET v4.0