Loading...
2011, 09-07 Permit: 11002705 DuplexSPoka�i�e~ Valley® Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ email: permitcenter@spokanevalley.org Site Information Project Information Site Address: 12516 E OLIVE AVE Parcel Number: 45153.1827 Subdivision: Block: Lot: Zoning: R-3 SF Res District Owner: DERKACHEV, VITALI Address: 914 W LINCOLN BLVD SPOKANE, WA 99224 Building Inspector: NORTH Water Dist: MODERN Project Number: 11002705 Inv: 1 Issue Date: 09/07/2011 Permit Use: CONSTRUCT NEW 3044 SQFT SFR/DUPLEX Applicant: DERKACHEV, VITALI 914 W LINCOLN BLVD SPOKANE, WA 99224 Contact: DERKACHEV, VITALI 914 W LINCOLN BLVD SPOKANE, WA 99224 Setbacks - Front: Left: Right: Group Name: Project Name: DUPLEX - 12516 / 12518 Phone: (509) 710-0183 Phone: (509) 710-0183 Rear: Permits 1 Approach Contractor: A K Construction & Excavtn Llc APPROACH -CONST IN ROW License #: KCONSCE920J4 1 $52.00 FOR RIGHT OF WAY INSPECTIONS CALL (509) 869-5373 ENGINEERING Building Permit Contractor: OWNER SFR/DUPLEX R-3 VB 2,554 SFR/DUPLEX U-1 VB 490 GARAGE Total Value: $267,136.30 FOR BUILDING INSPECTIONS CALL (509) 688-0054. Mechanical Permit Contractor: OWNER VENTILATING FANS 1 DUCT 4 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. Processed By: BONDURANT, MICK Printed By: MORRIS, HEATHER Page 1 of 2 Total Permit Fee: License #: OWNER RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT SFR / DUP SITE PLN REVIEW Total Permit Fee: $52.00 $1,934.55 $4.50 $773.82 $50.00 $2,762.87 License #: OWNER $44.00 VENTILATION SYSTEM 2 $26.00 Total Permit Fee: $70.00 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT-OF-WAY/APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one-time 30 -day extension available. Right-of-way permits issued between October 1, and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: htto://www.spokanevallev.orq and search for "fees" Owner/Agent Date: Staff Approval Date: jam. Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240 • Fax: 509.688.0037 ♦ email: permitcenter@spokanevauey.org Project Information Site Information Site Address: 12516 E OLIVE AVE SPOKANE VALLEY, WA 99016 Parcel Number: 45153.1827 Permits Project Number: 11002705 Inv: 1 Issue Date: 09/07/2011 Permit Use: CONSTRUCT NEW 3044 SQFT SFR/DUPLEX Plumbing Permit Contractor: OWNER License #: OWNER TOILETS/BIDETS 2 $12.00 SINKS SHOWERS 2 $12.00 DISH WASHERS GARBAGE DISPOSAL 2 $12.00 CLOTHES WASHER WATER HEATER - ELECTRIC 2 $12.00 Total Permit Fee: FOR PLUMBING INSPECTIONS CALL (509) 688-0054. 4 $24.00 2 $12.00 2 $12.00 $96.00 Payment Summary Total Fees AmountPaid AmountOwing $2,980.87 $2,980.87 $0.00 Tran Date 09/01/2011 09/07/2011 Receipt # 28177 28237 Payment Amt $771.58 $2,209.29 Notes / Conditions of Approval Driveway is to be inspected by the City's ROW Inspector prior to paving. Approach is to be constructed per City's Standard Plan R-1 14 (Driveway Approach Asphalt). Processed By: BONDURANT, MICK Printed By: MORRIS, HEATHER Page 2 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage 0208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT-OF-WAY/APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one-time 30 -day extension available. Right-of-way permits issued between October 1, and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website t: http://www.spokanevalley.orq and search for "fees" Owner/Agent Date: - -1 \ 3,0 Staff Approval Date: