2012, 06-19 Permit: SW-12001553 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001553
Permit Issued Date:
06/19/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: ADAIR HOMES, INC
Project Name: ADAIR MODEL HOME Applicant: ADAIR HOMES, INC
Permit Type: SEWER Address: 1101 SE TECH CENTER DR #160
VANCOUVER, WA 98683
Phone:
Email:
SITE INFORMATION: 17 C 7
Site Address:505 `: ERci o RD—
Parcel Number: 45153.2908
Subdivision:
Assessor's Description: RAU ESTATES LT 8 BLK 1 (AUDITORS
#5670951 BK 35 PGS 10 & 11)
Inspection Area:
Owner:
Address:
Phone:
Email:
ADAIR HOMES, INC
1101 SE TECH CENTER DR #160
VANCOUVER, WA 98683
Water District: Modern Fire District: Spokane Valley Fire
Electric Water Company
Zoning: Land Area: 0.2382 acres / 10378 sqft
CONTRACTOR INFORMATION:
General Contractor
SAWYEPL914LP
SAWYER PLUMBING LLC
PO BOX 3170
HAYDEN, ID 83835
208-772-3878
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 06/19/2012 10:09:12
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001553 06/19/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/19/2012 10:09:12
Printed by: IIS APPPOOL\ASP.NET v4.0