Loading...
2012, 06-19 Permit: SW-12001553 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001553 Permit Issued Date: 06/19/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: ADAIR HOMES, INC Project Name: ADAIR MODEL HOME Applicant: ADAIR HOMES, INC Permit Type: SEWER Address: 1101 SE TECH CENTER DR #160 VANCOUVER, WA 98683 Phone: Email: SITE INFORMATION: 17 C 7 Site Address:505 `: ERci o RD— Parcel Number: 45153.2908 Subdivision: Assessor's Description: RAU ESTATES LT 8 BLK 1 (AUDITORS #5670951 BK 35 PGS 10 & 11) Inspection Area: Owner: Address: Phone: Email: ADAIR HOMES, INC 1101 SE TECH CENTER DR #160 VANCOUVER, WA 98683 Water District: Modern Fire District: Spokane Valley Fire Electric Water Company Zoning: Land Area: 0.2382 acres / 10378 sqft CONTRACTOR INFORMATION: General Contractor SAWYEPL914LP SAWYER PLUMBING LLC PO BOX 3170 HAYDEN, ID 83835 208-772-3878 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 06/19/2012 10:09:12 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001553 06/19/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/19/2012 10:09:12 Printed by: IIS APPPOOL\ASP.NET v4.0