Loading...
2012, 05-23 Permit: SW-12001402 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001402 Permit Issued Date: 05/23/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: WEATHERWOOD Permit Type: SEWER Primary Contact: SCHELLENBERG EARTHWORKS Applicant: SCHELLENBERG EARTHWORKS Address: PO BOX 3271 SPOKANE, WA 99220 Phone: 509-999-3694 Email: SITE INFORMATION: Site Address: Parcel Number: 12921 E OLIVE AVE 45153.2209 Subdivision: BOYER'S SUBDIVISION Assessor's Description: OPP BOYER B81 L9 B2 Inspection Area: Owner: Address: Phone: Email: CLAPPER,GLENN/HOISINGTON,GINNY 12921 E OLIVE AVE SPOKANE, WA 99216-0925 Water District: Modern Fire District: Fire District 1 Electric Water Company Zoning: Land Area: 0.3206 acres / 13964 sqft CONTRACTOR INFORMATION: General Contractor SCHELE*973D4 SCHELLENBERG EARTHWORKS PO BOX 3271 SPOKANE, WA 99220 509-999-3694 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/23/2012 07:50:25 Printed by: IIS APPPOOL\ASP.NET v4.0 I SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001402 05/23/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/23/2012 07:50:25 Printed by: IIS APPPOOL\ASP.NET v4.0