Loading...
2010, 09-17 Permit App: 10002842 Fire Damage RepairProject Number: 10002842 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/17/2010 Page 1 of 2 Project Information: Permit Use: FIRE REPAIR DAMAGE Setbacks: Front Left: Right: Rear: Site Information:. vAusawasst,rwAsio 4. Plat Key: CONV Name: CONVERTED CNTY DATA Contact: Address: C - S - Z: Phone: Group Name: Project Name: BELFOR CONSTRUCTION 10020 E. KNOX, SUITE 100 SPOKANE, WA 99206 (509) 893-0001 District: East Parcel Number: 45143.2055 SiteAddress: 14411 E OLIVE AVE Location:: CSV Block: Zoning: R-3 SF Res District Water District: 010 VERA Area: 8,765 Sq Ft Nbr of Bldgs: 0 Nbr of Dwellings: Width: 0 10 Review Information: Lot: Owner: Name: JONES, JONATHAN W Address: 14411 E OLIVE AVE SPOKANE VALLEY, WA 99216-206 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Permits: Released By: Originally Released: Contractor: BELFOR USA GROUP Address: 10020 E. KNOX SUITE 100 SPOKANE VALLEY, WA 99206 Description Grp Type Notes 1&2 FAMILY R-3 VB PLAN REVIEW FEE Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Operator: jmm 9/17/2010 By: tmelbourn Building Permit Totals: Firm: BELFOR CONSTRUCTION Phone: (509) 893-0001 This Application: Sq Ft Valuation 0 $37,000.00 0 $37,000.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Printed By: JD Permit Total Fees: Print Date: Total Project: Sq Ft Valuation 0 $37,000.00 0 $37,000.00 Fee Amount $512.45 $4.50 $204.98 $721.93 9/17/2010 Project Number: 10002842 Inv: I Notes: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/17/2010 Page 2 of 2 Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $721.93 $721.93 Amount Paid Amount Owing $204.98 $516.95 $721.93 $721.93 $204.98 $516.95 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 9/17/2010 S` okane P jValley Community Development rerrrut LenLer 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www. spokanevalley. or Residential Construction New Construction Accessory Bldg erinit Application Additioli./Remod:d 1 [1 Deck [Other: PERMIT NUMBER: PERMIT FEE: ST -7 ADDRESS: i LW 11 E 0IANi 6- Ave SPo1U►44; 'OA ttr-f 1 t✓R 4q,211, AS ' , SORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: g - DIMENSIONS: r Name: eelriR USA 6vou.P shJC Name: JOI44TINAat J014e5 Address: iooav E i4IO1c Scj1Ti- /00 2Nu FLOOR SQ. F G: 396-.5. 4 Address: UC 01.4C: AJ I‘I11 Zip: 940 G Phone. Fax: 4-0q- *43 -0001 .*d9 - 8-93 City: State: L S00ILA4a VA-0Ei A Zip:, 90 l G Phone: Fax: 509 — 09 t. - +./SS 7 CONSTRUCTION TYPE: HEAT SOURC: Contact Person Name: sUn�(� Describe the scope of work in detail: f= ] ¢ 126 PA; rZ Contractor: g - DIMENSIONS: r Name: eelriR USA 6vou.P shJC TOTAL HABITABLE SPACE: l�c.)--i 0I - Address: iooav E i4IO1c Scj1Ti- /00 2Nu FLOOR SQ. F G: 396-.5. 4 City:SPoiLAAJt State: w A- Zip: 940 G Phone. Fax: 4-0q- *43 -0001 .*d9 - 8-93 - 00 0 L Contractor F C% 0 6ef q 0 8 f Exp Date: 30% SLOPES ON PROPERTY: SEWER OR SEPTIC? City Business Lic. No: CONSTRUCTION TYPE: Cost of Project: $ 3 �I o a o o c Or— Proposed Use: **************The followin MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: g - DIMENSIONS: r # OF STORIES: TOTAL HABITABLE SPACE: l�c.)--i 0I - MAIN FLOOR TO SQ. FTG: 9-5� 7 2Nu FLOOR SQ. F G: 396-.5. 4 UNFIN BASEMENT SQ. FTG. AREA: 6,9 '7 3 IMPERVIOUS SURFACE FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: 3 3 Co DECK/COV. PATI SQ. FTG: oL% /� 30% SLOPES ON PROPERTY: SEWER OR SEPTIC? # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURC: The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: /(Q (( Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: ci - / 0 - 0 VISA VIN#: Spokane jUalley 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhall@spokanevalley.org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. ❑ Show the height of any proposed buildings or accessory structures. O Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. O All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. O Smoke detector locations ❑ 22" X 30" attic access location O 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. ❑ All header locations: type, size, and connections O Foundation plan ❑ Insulation information Spokane jUalley For City Use Only PLUS Project Number ,. ' (. Project Address K(i( J 1 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. ////( () Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07