Loading...
2013, 05-15 Permit: SW-13000716 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000716 Permit Issued Date: 05/15/2013 Expiration Date: 05/15/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION GREEN HAVEN POUL CONSTRUCTION 509-979-5872 Applicant: POUL CONSTRUCTION Address: Phone: Email: 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 509-979-5872 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 17814 E OLIVE 55183.1502 CORBIN ADD TO GREENACRES TR B OF SP95- 1028 AUDITOR'S #4044620 BK 13, PG 63 & 64 BEING A PTN OF LT 1 BLK 17 : (509)-477-3675 Owner: Address: Phone: Email: Water District: Consolidated Irrigation District #19 PATTEN, ROY H & GLADYS R 17814 E OLIVE LN GREENACRES, WA 99016-8584 Fire District: Spokane Valley Fire Land Area: 0.46 Acre(s) CONTRACTOR INFORMATION: POULCC*932BQ, Exp. 01/28/2015 POUL CONSTRUCTION 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 509-979-5872 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 05/15/2013 15:44:13 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000716 Permit Issued Date: 05/15/2013 Expiration Date: 05/15/2014 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/15/2013 15:44:13 Project Coordinator: Kathy Cummings