2012, 11-05 Permit: SW-12002501 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT .
Application Number: SW -12002501
Permit Issued Date:
11/05/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: ROTH ADD PH II
Permit Type: SEWER
Primary Contact: LOTS N LAND
Applicant: LOTS N LAND
Address: 210 N UNIVERSITY RD STE 300
SPOKANE VALLEY, WA 99206
Phone:
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
13609 E OLYMPIC
46344.0609
Subdivision: PLAT NO 4 OF WEST
FARMS IRRIGATED
TRACTS
Assessor's Description: W FARM IRR TR PL 4 W1/2 8110 EXC PLATTED
PTN ALSO EXC PTN DAF: BEG AT SE COR OF
LT 4 ROTH ADD PHASE 1 TH S89°56'30"W ALG
S LN OF LT 4 39FT TH S00°02'20"W 5FT TO NE
COR OF LT 5 BLK 2 TH N89°56
Inspection Area:
Owner: LOTS N LAND
Address: 210 N UNIVERSITY RD STE 300
SPOKANE VALLEY, WA 99206
Phone:
Email:
Water District: Trentwood Fire District: Spokane Valley Fire
Irrigation District #3
Zoning: Land Area: 4.6 Acre(s)
CONTRACTOR INFORMATION:
General Contractor
FOLSOE1994DO
FOLSOM EXCAVATING INC
16701 E VALLEYWAY AVE
VERADALE, WA 99037
509-891-1232
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Date Printed: 11/05/2012 08:50:52
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002501
Permit Issued Date:
11/05/2012
Expiration Date:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 11/05/2012 08:50:52
Printed by: IIS APPPOOL\ASP.NET v4.0