Loading...
2012, 11-05 Permit: SW-12002501 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT . Application Number: SW -12002501 Permit Issued Date: 11/05/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: ROTH ADD PH II Permit Type: SEWER Primary Contact: LOTS N LAND Applicant: LOTS N LAND Address: 210 N UNIVERSITY RD STE 300 SPOKANE VALLEY, WA 99206 Phone: Email: SITE INFORMATION: Site Address: Parcel Number: 13609 E OLYMPIC 46344.0609 Subdivision: PLAT NO 4 OF WEST FARMS IRRIGATED TRACTS Assessor's Description: W FARM IRR TR PL 4 W1/2 8110 EXC PLATTED PTN ALSO EXC PTN DAF: BEG AT SE COR OF LT 4 ROTH ADD PHASE 1 TH S89°56'30"W ALG S LN OF LT 4 39FT TH S00°02'20"W 5FT TO NE COR OF LT 5 BLK 2 TH N89°56 Inspection Area: Owner: LOTS N LAND Address: 210 N UNIVERSITY RD STE 300 SPOKANE VALLEY, WA 99206 Phone: Email: Water District: Trentwood Fire District: Spokane Valley Fire Irrigation District #3 Zoning: Land Area: 4.6 Acre(s) CONTRACTOR INFORMATION: General Contractor FOLSOE1994DO FOLSOM EXCAVATING INC 16701 E VALLEYWAY AVE VERADALE, WA 99037 509-891-1232 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Date Printed: 11/05/2012 08:50:52 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002501 Permit Issued Date: 11/05/2012 Expiration Date: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 11/05/2012 08:50:52 Printed by: IIS APPPOOL\ASP.NET v4.0