2007, 08-06 Permit: 07003004 DeckSpokane e�
Valley
BUILDING DIVISION
1
1
Site Information
11707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Project Information
Site Address: 7906 E NORA AVE
Parcel Number: 45073.0710
Subdivision:
Block:
Lot:
Zoning: UR -3 Urban Residential 3.5
Owner: HAGER. ROBERT W
Address: 7906 E NORA AVE
SPOKANE VALLEY, WA 99212
Building Inspector: DOUG POWELL
Water Dist: SPO CO WATER DIST#3A
Project Number: 07003004 Inv: 1 Issue Date: 08/06/2007
Permit Use: BUILDING DECK 10 X 35
Applicant: HAGER, ROBERT W
7906 E NORA AVE
SPOKANE VALLEY, WA 99212 Phone: (509) 891-5512
Contact: HAGER, ROBERT W
7906 E NORA AVE
SPOKANE VALLEY, WA 99212 Phone: (509) 891-5512
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name:
Permits
Building Permit Contractor: OWNER
License #: OWNER
DECK OPEN
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
R-3 VB 350 RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
$5,250 00
$125.25
$450-
$50,10
Total Permit Fee: $179 85
1
Payment Summary
Total Fees AmountPaid AmountOwinp
$179.85 $179.85 $0.00
Tran Date Receipt it Payment Amt
08/06/2007 10717 $179 85
Processed By: Main, Jodi L
Printed By: TURBAK, MIKE Page 1 of 1
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -In of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy. -
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. Installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — pnor to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Pemvts and inspections for elecincal winng. State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division
And Industries 324-2640 4]]3604
Permits and inspections for on-site septic systems, Spokane Regional Fire spnnkler and alarm systems and private access road inspections, Spokane Valley
Health Distnct 324-1560 Fire Department 8g2.4122
State law RCW 19.122 requires that pnor to any excavation the -CALL BEFORE YOU 01G' center must be notified Gall before you dig at least 2 working days in advance, 456-6000
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior tp the plan review being completed.
Owner / Agent
Date -G7
Staff Approval Date