Loading...
2008, 02-29 Permit App: 08000607 Pole BldgProject Number: 08000607 Inv: I Application Date: 2/29/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Permit Use: 36 X 40 POLE BLDG Contact: TOWN & COUNTRY Address: 5918 E TRENT AVE C - S - Z: SPOKANE, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 535-9016 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 46353.1207 Block: Lot: SiteAddress: 14117 E OLYMPIC AVE Owner: Name: HATHAWAY, JAMES & KERI Location:: CSV Address: 14117 E OLYMPIC AVE SPOKANE, WA 99216 Zoning: R-3 SF Res District Water District: 001 TRENTWOOD Hold: ❑ Area: 15,609 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information:ae�a� Review Building Plan Review Originally Released: 2/27/2008 By: tmelbourn Septic Sys Review Released By: PATTI WARREN @ HEALTH Originally Released Landuse/Zoning/HE Conditions Originally Released: 2/29/2008 By: jdavis Released By: 2/27/2008 By: mpalaniuk Permits: �� z., .. . - ��u� .rw � . --: �� :� .: � �50 .MM". . i Operator: JD Printed By: JD Print Date: 2/29/2008 Project Number: 08000607 Inv: I Application Date: 2/29/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: TOWN & COUNTRY BLDG Address: 3908 W DAKIN LN CHENEY, WA 99004 Description Grp Type Notes POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Building Permit Firm: TOWN & COUNTRY BLDG CONT Phone: (509)448-8483 This Application: Sg Ft Valuation 1,440 $27,360.00 Totals: 1,440 $27,360.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Total Project: SQ Ft Valuation 1,440 $27,360.00 1,440 $27,360.00 Fee Amount $421.55 $105.39 $4.50 Permit Total Fees: $531.44 Notes: ..4a .ri Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owiniz Building Permit $531.44 $531.44 $0.00 $531.44 $531.44 $531.44 $0.00 $531.44 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 2/29/2008 SOD�ane �. jVHeyb Community Development Permit Center 11707 E Sprague Ave, Suite 106 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www. spokanevalley. orQ PERMIT NUMBER PERMIT FEE: Residential Construction ❑ New Construction ❑ Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: (41l-1 ASSESSORS PARCEL NO: 46-55'3. Q01 LEGAL DESCRIPTION: Describe the scope of work in detail: Cost of Project: $ D I# V Proposed Use: CYC e Q **************The following MUST be complete: (write N/A -if not apolicable)********************** HEIGHT TO PEAK " The DIMENSIONS: I „ # OF STORIES: TOTAL HAS TABLE SPACE: w ` ko" .4 10- MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: /1/1� N/� AREA N�A' FINISHED BASE T 4 GARAGE SQ. FTG: DECKICOV. PATIO SQ. FTG: N/� 30% SLOPES ON SQ. FTG: 0 D PROPERTY: N14— # OF BEDROO� v� CPRTYPE: osTFR¢M� HEAT SOU �4� SEWER�� IC? permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling ishvill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) Thi City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6); Plans or addit orlal information may be required to be submitted, and subsequently approved before thisapplication can be processed SIGNATUFi�:-.— DATE: Method of Payfi»ent ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 2115/07 Sp���Valley49;00 For City Use Only PLUS Project Number Project Address �1 f ! ��1 ,� , 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenterospokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is '� The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Proiect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 02/26/21606 UJ: 41 5b''ddZ417b1 FEE 28 2008 09=29 FR SU PERMIT CENTER rwura< <.o.wd 11707 E Sprague Ave, Sub 106 Spokane Vslley,'WA 99206 (SD9)688-0036 FAX: (509)688-0037 Davol moot 5096880037 TO 93241567 P.02iO3 P>� m- v PEFIVB'i'FEB: CozommaitY °P Residential Construction ❑ New Construction Permit Application I F Addition/Remodel-1 r SITEADDMS: A55E5SOMPARCELNO: -iia 3. tom? �I, ,pLDESCR�TiON: Contut ]Peron Name: ailled E ' ftme: Q9 5'3S 6- Ex- 2 D Accessory Bldg M Deck trotrl�ctpn xa�:7vw,V f Cou�lrR� &ri�A�Rs x,1k. Awa: 59 / 8 f fV- 7'RFJrt Caa�ac6oar Lic N0:'FvW4e&/21CJ EV'b"CB' 06 13 VA, S (G/ 0.517., Desciibe the scope of work in. detail: Cost of Project: S Wy Ho-, Proposed Use: lu I FT(3: OF BEC E The pemr8es verifies, acknowledges and agrees by their signature that Z) If this p*M91 Is for aondrud ion of or on a dwelling, the dwelling tsl W ba esrv9d by potable water: 2) Ownershlp trf tills City of spooma VsAW Psrmlt inure to the prop" owner. 3) The signatory is the pnfperty owner or has permission to reprasent the property ovmer.in 1619 transaction. 4) All construction is to be done In ibll wompliance with the City of Spokartr, Valley Development Code. Reflirsnoed codas ars "labia fbr review at the City of Spokane Valley Pa reit Center. 5)ity of Spo Valley Permit Is not a para tt or approval 'fbr aWvi6latiori of federal, state or IoW livres, codes orordrnanoea 6) d�orad ,intbmMan may be required tc be submMed, and subsequently approved before bt-applicallm Carl be ces _ .._ .-... ___....._. SIGNAT �_, '� J` DATE: Moahed of Pgy»r�nt: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA HankaaM A Expires: VINP: Autlwrlxed Slanafurs: G� o� FEB 28 2008 09:41 5093241567 PAGE.01 MANFLOOR"SCL FLOOR TO 5 . 2 FTG: U F'IN BASEMENT SQ. FTG: IMPERVIOUS SURFACE 1= >-G: ,(1�- #/#- AREA �,. I FT(3: OF BEC E The pemr8es verifies, acknowledges and agrees by their signature that Z) If this p*M91 Is for aondrud ion of or on a dwelling, the dwelling tsl W ba esrv9d by potable water: 2) Ownershlp trf tills City of spooma VsAW Psrmlt inure to the prop" owner. 3) The signatory is the pnfperty owner or has permission to reprasent the property ovmer.in 1619 transaction. 4) All construction is to be done In ibll wompliance with the City of Spokartr, Valley Development Code. Reflirsnoed codas ars "labia fbr review at the City of Spokane Valley Pa reit Center. 5)ity of Spo Valley Permit Is not a para tt or approval 'fbr aWvi6latiori of federal, state or IoW livres, codes orordrnanoea 6) d�orad ,intbmMan may be required tc be submMed, and subsequently approved before bt-applicallm Carl be ces _ .._ .-... ___....._. SIGNAT �_, '� J` DATE: Moahed of Pgy»r�nt: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA HankaaM A Expires: VINP: Autlwrlxed Slanafurs: G� o� FEB 28 2008 09:41 5093241567 PAGE.01 A`L /41 j('7 I � I Q I C E"4,' 1e 36 �qo �����s ���►err PLANNING DEPT. APPROVED BY: DATE: _ z12-7/2-oo A e e -1s S I v,,,�,p it A-Je Z WAMBEKE ENGINEERING 2913 East 61St Court Daniel Wambeke, P. E. Spokane, WA 99223 Telephone: 509-443-6186 • Fax: 509-448-6582 • dwambeke @msn.com STRUCTURAL DESIGN DRAWINGS F&M 36'X 40'X 10'6" POST FRAME BUILDING Zem J. LINCOLN HATHAWAY SPOKANE VALLEY, WASHINGTON JOB NO. SP 8730 PREPARED FOR TOWN & COUNTRY BUILDERS, INC. SPOKANE, WASHINGTON February 27, 2008 EXPIRES (. ��� Designer of Small Structures, Post Frame Buildings, Foundations, Light Gauge Steel Framing and Grain Storage Systems Desi n C� ritsriA 8 330 Wind Load ,,,,,,+, S M H -T aic" -� 0*rR 0 w A Uve Load -S foMaE Vey uJ4 Dead Load Bay Spacing o F1 ! 3 x p x� 1 D 6 6 PLF 3 -CO ; J 11r � 12�0 CL Zo l6 Q � 6x� 5a� ,tee prb 4 0 16 X6 00 Ib 1 S l Roles OUM4,I 2 9" O C STITCH SCREWS IN ALL STEEL ��O ®180606®t•`' PANEL VERTICAL LAPS f�'�,R�G1Sl'ER���j� 1-LooK FLAN Po5r Uy SjONAL G Elf 0p;I _ I LXPIRES 1),-07 I-/0 z THIS ENDWALL ONLY! INSTALL 1112 X 5/8"%.-- 60 kT %YPTcm FpnTrnl c, nF`TATL _P`�I FOOrING SCNEOuL E .�asr Foori�l F L04A JoAl 512-@ Sl -2- 40'3F) F kS zoo" x 2—V X 31, " �5 1. a 6A x ILF" x 31 „ - ov"s 6x 4 1(6", X. ) CA" A 31.6 11 EXPIRES 7-1- 49730 ---487,;0 —Co KAl6-PC 14EkAF—K Rgrrep- l0 16aP �%��s WT B1#4p- 0 161 dA zs G� Rrs 16� x►�s , > 12 IU A[Aji-S S7,A pPoa-T Uvas ! 2 14d A14165 Go STs 1%P 1cs L RaFrER ,Ls s,4pfoRr Pok PD ld NAIL5 Gets Y l6d nl�►�s T-/VTPt P 0 K a Y-- f u .2-2x6 Aj$tW &aeLl y To PiJapdetf4 W l rO y AlaI`s To RAFTERS c OIL n uamr�.�rn r. ru. I ' I1 f mmillim PuRL,Als L 2X(, AF -4 #Z- 1j1wt,,fP T 18067 0 vT9165 IrIA)6fl4l ISTV AL �G 7-R45$ To'P e0*0--9 i3oi7om oopo Ap TgW5;5 ,-, of-L"Z SPr .7•J .T49Is7 q�JG Rs uu t TPU55 007770M C 10-fi) ��- _ Tgy5S x - Br<4CPaC, 3 JU ar-I& ,j�'u 8 R S c.,A r Pvatil► rr _ 48 FASCIA CQnlnt 'cTiOAJ 70 Pini�.�/ A/v .2 X.—Yu g"'V-5 ,ICAI - '�4Qt►�l j�cTlv�� T� W�!Q i R���*! LW,�- WAsh l4tP �o 118067 o -G/Sl'ER� EXPIRES SPB� 3 V 4011-5 S"Ufr"I To AuA,PV I 3/y'' suv- Been w I r4 i,�/is/ cg s CrYPICAL) /-i i zx—faivalS 2y"o.4 OVO LAMED .Y,— D01/819 ThP 4wh5 0VERt..4PpEp Or k.1,06L - I z x6 wcolbv(w ,4> X AecBtE 8arroM C.__!FO�.OS �'�tiU wA'A,y� S� JER RppE,o 5' ATC+E/+lr7"E2°F C � R cry n1 of TR,Y53z- ot 18067 o =CISTERN ANAL L Aofuc Tom" nCIFoI� - 2X'IO .00gA0 1 %a p (� tF9KOS XPIRE 2x)2 Darn. % CNo"s - ZX4 BtocKAIC- zy LonlG- Zx iz AW&L 3/y �,. �T►f all4StiFKS f}e� foal A tE f} mrNl AM o f P -90M "CC PF WAM TO &AtiL W40&7 / a QTS lF + MIN/.*w4 OF 3" 6X Plf"fosT FRt�t CENT qC �r Tb CFV R OFAlr Nq+��C.,� Witl�lECT►oYII DF NSS Edl tis 11 3"sp,.�1 4L +l y 1�W 11 1 .—... 111 ��_._._. ■moi 1■1 n��� (44 G c CT r 0 O RPor AREA S w 4 (F) YR;i b RISC )o16 UVE rM "W&, 1-1 18067 _, RES /L '- SP8730 an - Roofing & Siding 1/3 Sna-n–' 29 Guage Steel 114 SPAM.— r' korw& otter 306 FEtr 4 DOUBLE TRUSS Purl; 2X VF44L 'p�� ►L u Top ChordZ ��_" oc rutl of rafter• �� [ Bot Chord 1X)o L f Webbing -Z$4 -Ljrz • ..� 24 Bolts 3/4 if • EyQ N f •'46 27C Girlijn Top Chord to Bottom Chord' '• Top Chord to Post _ --E Belts y/116 nnils164 I Bolts 1-1/6 nails Ibd �-Support Block to Post = __� Bolts H/G nailslid 2-2X6 Blockin "-Shear Block to Post = Z Bolts w/6 nailslbd Rat Runs �oc Ea0 'lib E,AIa Girts 2X6 Q 2P, oc Live Load A SSE Dead Loud 5 3E X10 PT a oard Othr Load IDSE 6XA_ P'r posts NL Ir Total Load J of .6 retension PI:,F S Truss Width Concrete 5 a �w Sp -1jo T TYPICAL CRGSS SeC'i'ION R � i CITYCOPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS RVr� - " ` GC ChAPLpANCE SPOI,ANE':fP I_v" SIAL IVIG I ISIC?h -� x C7 -