Loading...
2012, 05-24 Permit App: BLD-2012-0743 Residence• 4••••ovaitey. Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenterna spokanevallev.orq SUB#j i 'REV.# RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION .OTHER RUCTION ADDITION/REMODEL ACCESSORY BUILDING is n SITE ADDRESS: / `� // 263 �. (J i i p i CI ji°0)Z4iL z/ALI / z J4 ,Q19.2) ASSESSORS PARCEL NO.: C..%3 , S a 0 z LEGAL DESCRIPTION: L2. I j Z !IWO tUIJ BUILDING OWNER NAME: L /J L 14Oti)L5 LLC NAME: L -N 01 L -LG' ADDRESS: 2 I r N lj pe, 1 L / lel- E2p /J CITY:v// eigKNi.i J\L 1 STATE: . ZIP: g (i©62. PHONE: i1 - (A°690 1FAX: lZ2 ''0115 CONTACT NAME: ��l N Hi%01‘..*4 PHONE: o 1i r 612c7 FAX: jG� !✓II A D L 1'64(70 7 CELL: 'Z'/ CONTRACTOR NAME: K g\h 1 HiNooKi I+ON1g MAILING ADDRESS: 10 I 0 1,1 id ce„.;L'ry go, diem �O /,1�i i% %� L,i CITY: r Q a.i,l e U L. STATE: A ZIP: - 1 12 7 PHONE: I 4 ( 100 FAX: 11"Z - 0115 CELL: ZI-7'i /41 0L✓ CONTRACTOR LICENSE NO.: KN(hIL I✓1 0154144 EXPIRES: { - `2 - lit. CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE QF WORK IN DETAI AND INDICATE SE & PROPOSED USE: IU ki Fr* i pg..I-11M,- 'ted 21(9N CELL:72_,11 --'6/•10e7 ****YOU MUST COMPLETE THE FOLLOWING**** APPLICABLE Height to Peak: Dim ion ; Ii .-67 X -� :. No. of Stories: /� oY' Total Habitable Space: Main Floor SQ 1T:w AI Upper Floor SQFT:Unfinish / B FT: SQ Finished BaseSn t SQ FT: I� Garage SQ FT: it;FT: Deck/Covered P i Impervious Area: urface q A 30% Slopes o Property: Q I ® No. of Bedrooms: Construction Type: MD Heat Source: (41/!r Septic. TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, ttie dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Effective October 28, 2007 Page 1 of 2 P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc $ (3I SPINE COUNTY BUILDING AND PLA•ING PERMIT Application Number: SW -12001423 Permit Issued Date: 05/24/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: FOLSOM EXCAVATING Project Name: HUNTERS RUN Applicant: FOLSOM EXCAVATING Permit Type: SEWER Address: 16701 E VALLEYWAY VERADALE, WA 99037 Phone: (509)979-6002 Email: SITE INFORMATION: Site Address: Parcel Number: 14203 E OLYMPIC AVE 46353.5102 Subdivision: HUNTERS RUN Assessor's Description: HUNTER'S RUN LT 2 BLK 2 (AFN 5344305) Inspection Area: Owner: LOTS -N -LAND, LLC Address: 210 N. UNIVERSITY RD #300 SPOKANE, WA 99206 Phone: Email: Water District: Trentwood Fire District: Fire District 1 Irrigation District #3 Zoning: Land Area: 0.2342 acres / 10203 sqft CONTRACTOR INFORMATION: General Contractor FOLSOE1994DO FOLSOM EXCAVATING INC 16701 E VALLEYWAY AVE VERADALE, WA 99037 509-891-1232 DETAILS: Class Type Project # 4/2. 'La(z- 071/3 RECEIVED MAY 2 4 2012 CSV PERMIT :::ENTER Quantity Unit Charge c). 4-4 Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area Possible Floodzone On Site CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 05/24/2012 14:10:00 Printed by: IIS APPPOOLWSP.NET v4.0 SPINE COUNTY BUILDING AND PLANING PERMIT Permit Issued Date: Application Number: SW -12001423 05/24/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/24/2012 14:10:00 Printed by: IIS APPPOOL\ASP.NET v4.0 • Spokane~ Valley® Target Date sheet For City Use Only PLUS Project £ ( . 2O/2 ' 7t/3 Project Address P/2 r'' [ . / 4rA we 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. D Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. D Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 1 PLANNING DEPT. APPROVED BYeh DATE: I Y 112 „A OD 17l sire-. 2,6 f1 - Oa 7,7 Lof tit -01‘7 Hitt4-1P74 PAR R 1 I*444) 1 I -2v Pi, rt CI,rr' P*11444) otv-----7 ley lit_ lol Oft L 1 I! goP-? i____P4-1.11 &irr 14�G��v �, oLyNCPIG )6 1110 ,I_cl1 Jon Hester From: Wayne McGavran Sent: Tuesday, May 29, 2012 11:00 AM To: Permit Center Cc: Mick Bondurant; Jon Hester; Jenna Davis Subject: APR -2012-0027 All, This approach permit is not required, as this is part of the Hunters Run Subdivision and the builder is using the pre - approved curb cut. Wayne 1 Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 permitcenter@sookanevallev.orq APPROACH PERMIT APPLICATION PROJECT ADDRESS: /f)O3 of<7CrjPiC START DATE: ANTICIPATED COMPLETION DATE: BUILDING OWNER NAME: , • , -7 MAILING ADDRESS: D 1U. ‘,41.3c) CITY: e)k ua ! ec STATE: 64 CONTACT PERSON NAME: /"4,4, nefe; ZIP: 1% d� PHONE: c f 7 6 7 Z FAX: 2-c)72.5--- / CELL: �� CONTRACTOR NAME: cj/Gam, `j ��J `� M '5 C MAILING ADDRESS: ?7O 0.61. (1)/2iUf60,^5:, .2(Cr E 3e C CITY: STATE: jL�/7' ( ZIP: ! lc tC/ PHONE: �Dc - (&Y >C23 . FAX: CELL: CONTRACTOR LICENSE #: 11.24n 41$ r /(%3EXPIRES: PROJ ECT ,Residential Driveway O Existing Curb & Gutter O Culvert Installation O Other Conditions: CITY BUSINESS LICENSE #: DESCRIPTION (Please Provide Site Sketch) O Commercial/Industrial Driveway • Rural Road Section O Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently armed before this application can beprocessed. Signature P:\Community Development\11 Forms. Building\Permit Center\Approach Permit 2-24-11.doc Date: / 2-- Page 1 of 2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑Sidewalk ft wide ft from back of curb ❑Streetside Swale Drainage Ditch ❑Drywell (show location on sketch) ❑Other (please describe below) w z' DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH /CURB RETURN CURB' w zI M o IX ; THROAT WIDTH =FT —1-4' WING (SEE TABLE) WING STREET NAME STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH 1 `IF CORNER LOT, DISTANCE FROM CURB RETURN n FT (SEE TABLE) 15' RADIUS RADIUS RETURN EDGE OF 1 ASPHALT THROAT WIDTH n FT —4 (SEE TABLE) STREET NAME STREET WITH ASPHALT EDGE SIF CORNER LOT, DISTANCE FROM RADIUS RETURN FT(SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50° of frontage width. P:\Community Development\11 Forms\A. Building\Permit Center\Approach Permit 2-24-11.doc Page 2 of 2 Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' P:\Community Development\11 Forms\A. Building\Permit Center\Approach Permit 2-24-11.doc Page 2 of 2