2013, 03-19 Permit: SW-13000248 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000248
Permit Issued Date: 03/19/2013
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
SUMMERFIELD
LARRY MILLER EXCAVATING
509-218-3335
Applicant: LARRY MILLER EXCAVATING
Address:
Phone:
Email:
7117 E RUTTER AVE
SPOKANE, WA 99212
509-218-3335
SITE INFORMATION:
Site Address:
Parcel Number:
14617 E OLYMPIC AVE
46353.2502
Assessor's Description: SUMMERFIELD EAST 1ST ADD LT 2 BLK 5
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
RICHARDS, MATTHEW & TERESA
14617 E OLYMPIC AVE
SPOKANE, WA 99216
Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire
#3
Land Area: 11001.4 Square Feet
CONTRACTOR INFORMATION:
LARRYME918DR, Exp. 03/19/2013
LARRY MILLER EXCAVATING
7117 E RUTTER AVE
SPOKANE, WA 99212
509-218-3335
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Possible FEMA Flood Zone
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 03/19/2013 15:06:06 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000248 Permit Issued Date: 03/19/2013
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/19/2013 15:06:06 Project Coordinator: Kathy Cummings