2008, 08-19 Permit App: 08003197 Pole BldgProject Number: 08003197 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/19/2008 Page 1 of 2
Project Information:
Permit Use: 24 X 36 POLE BLDG Contact: LEE, RUSSELL S
Address: 8403 E NORA AVE
C - S - Z: SPOKANE VALLEY, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 924-9889
Group Name:
Site Information: Project Name:
Plat Key: 002795 Name: VISTA GARDENS NO 05 District: Nort
Parcel Number: 45074.0512 Block:
SiteAddress: 8403 E NORA AVE
Location:: CSV
Lot:
Owner: Name: LEE, RUSSELL S
Address: 8403 E NORA AVE
SPOKANE VALLEY, WA 99212
Zoning: 12-3 SF Res District
Water District: 100 SPO CO WATER DIST#3A Hold: ❑
Area: 9,180 Sq Ft Width: 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Depth: 0 Right Of Way (ft): 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 8/18/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Originally Released: 8/18/2008 By: mpalaniuk
Permits:
Operator: JD Printed By: jmm
Print Date: 8/19/2008
Project Number: 08003197 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/19/2008 Page 2 of 2
Contractor: OWNER
Building Height 18
Building Permit
Firm: OWNER
Phone: (000) 000-0000
Building Characteristics
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U -I VB 864 $16,416.00 864 $16,416.00
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Totals: 864 $16,416.00 864 $16,416.00
Units Unit Desc Fee Amount
1 SELECT $279.25
1 SELECT $69.81
1 SELECT $4.50
Permit Total Fees: $353.56
Notes•
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $353.56 $353.56 $0.00 $353.56
$353.56 $353.56
$0.00 $353.56
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 8/19/2008
Spokane
Valley.
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www. spokanevalley.ore
PERMIT NUMBER:
PERMIT FEE:
Li New Construction
❑ Addition/Remodel
❑ Other:
Accessory Bldg
Deck
SITE ADDRESS: 0 03 I NO RA
ASSESSORS PARCEL NO: q93714. 0512_ LEGAL DESCRIPTION: V IsTA meas C Lq 63
Building'Owuerc - -
Contractor: /y o#
Name: Ku 54a 1... S is
Name:
Address: Ry03 Noit.A
Address:
City: gaiarY16 State: WA Zip: e l Z
City: State: Zip:
Phone: WI % Okl < Fax: tett. MO -en
Phone: Fax:
DECK/COV. PATIO SQ. FTG:
Contractor Lic No: Exp Date:
':.Contact Persoti ''.'' '`-�' -- . .. ., -- _`_--
CONSTRUCTION TYPE:
'P0It l I�-r
City Business Lic. No:
SEWER OR SEPTIC?
Name: %I)SSL z L 5 t4F
Phone: 2$0 0) 5'7
Describe the scope of work in detail:
Cost of Project: $ 9677
Proposed Use:�ioo4 e- 4V - 60A -r
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO pfe$:
I0
DIMENSIO S:
oPIy36)ciy
# OF STORIES:
1
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:.
2NU FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
FTG:
GARA.QE SQ. FTG:
66SQ. 0(c--
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
'P0It l I�-r
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) his City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. • Plans or additional information may be required to be submitted, and subsequently approved before
this application can be,fayocess'.!
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/16/07
0 Check
❑ Mastercard
Expires:
DATE: N- J5- 9
❑ VISA
VIN#:
*Wane
#Valley®
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhall@spokanevalley.org
Q
Residential Plan Submittal Minimums
❑ Completed Building & Mechanical application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature, and date.
❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans
With details, roof plan, framing plans & details.
O Show the height of any proposed buildings or accessory structures.
O Floor plan for each floor: Dimension to scale (minimum 1/8") and label each
Room (including sq. footage of house and garage on plans) Show each
level of existing house and square footage of any additions.
O All braced wall panel types: show locations and details of installation, including
engineered design.
❑ Egress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping.
❑ Smoke detector locations
❑ 22" X 30" attic access location
❑ 18" X 24" crawl space access:
❑ One-hour separation detail: between house and garage
❑ Floor framing details: Joist type, size, spacing and installation details
❑ Roof framing plan and details
❑ Furnace and hot water heater location.
o All header locations: type, size, and connections
❑ Foundation plan
O Insulation information
S°pokane
arosesValley°
• For City Use Only
PLUS Project Number/111(153191
Project Address '
3
kb
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206. ,
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevattey.org
•
As part of our on-going commitment to customer, service during the review process of yotir project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date. '
j 1.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had.itsinitial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents. -
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
rnav be several dans before they can look at your neer or revised information.
i Designate a specific contact person to communicate with the City.
While the person designated as t/ne applicant's contact person with the Citi can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review- process. •
i Call staff regarding the status of your project only after the target date shown at,the.top of the page.
Al hough you should be contacted on or by the target date. please feel free to contact us if you haven't heard from us
by your target date. Stclfl may contact you before the target date rf the initial review is complete. By following this
procedure. you will save time and allow the reviewers lo'complete the work more expeditiously.
Steps in the Permit Process
I. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have, been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result oftheir technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the'appiication is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete. your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete,- it is•routed to,technical staff for compliance
review. Depending on the type of project, technical staff may include inultiple reviewers. You should be'contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliancereview is complete.
4. Permit Issuance. When the technical compliance review of the application is -complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and'contact the person specified ori your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
7z
7• rifiweL
3°T
JF
1 W o&e-D
4TH �c.� ntJ
N`` — ._6 2y 04/1-1
(c.
Ab' — 1>
cod -lir
0
eov
has 4- IR' `` C j
A--
V ,
PLANNING DEPT. A •PROVED
BY'
DATE:IT /,
7
1/87, imi)9 EosiZ
t\o°
E-- \4 •—� ?t2'
CON
/14
L 7'
?Li 03 E •
NIRA 6TRe5T-)