Loading...
2011, 07-05 Permit App: 11001957 Pole BldgProject Number: 11 001957 Inv. 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/5/2011 Page 1 of 2 Project Information: Permit Use: 30 X 32 POLE BLDG Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 002798 Name: VISTA GARDENS SUB Contact: CRUZ, JOSE' Address: 8503 E NORA AVE C - S - Z: SPOKANE VALLEY WA 99212-2429 Phone: (509) 924-7843 Group Name: Project Nanie: District: Nort Parcel Number: 45074.0508 Block: SiteAddress: 8503 E NORA AVE Location:: CSV Zoning. R-3 Water Distract' SF Res District Lot: Owner: Name: CRUZ, JOSE' Address: 8503 E NORA AVE SPOKANE VALLEY WA 99212-242 Hold: ❑ Area: 9,855 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: r ------------- - Review Building Plan Review Released 13y: Originally Released: 7/1/2011 By: tmelbourn Landuse/Zoning/HE Conditions Permits • Released By: Originally Released: 7/1/2011 By: Ibarlow Operator: jmm Printed By: jmm Print Date: 7/5/2011 Project Number: 11 001957 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/5/2011 Page 2 of 2 Building Permit Contractor: ZIEGLER LUMBER COMPANY Firm- ZIEGLER LUMBER COMPANY Address: 4220 N MARKET ST Phone: (509) 489-8760 SPOKANE, WA 99207 This Application: Total Project: Description Grp Tvpe Notes Sq Ft Valuation Se Ft Valuation POLE BDLG U -I VB PLAN 960 $18,240.00 960 $18,240.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSt3CC SURCHARGE Totals: 960 $18,240.00 960 $18,240.00 Units Unit Desc I SELECT 1 SELECT 1 SELECT Fee Amount 5307.25 $76.81 54.50 Permit Total Fees: $388.56 Notes: This permit is granted based on the identified use as storage - not a garage for daily use vehilcles. A hard paved driveway is not required for a storage building. Pamela Suaunar;• Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $388.56 $388.56 $76.81 5311.75 $388.56 $38856 $76.81 $311.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local Iaws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 7/5/2011 SpO ale Residential Driveway PAVING WAIVER Community Development— Planning Division 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720.5026 • Fax: 509.688.0037 • planning@sookanevallev.orq Spokane Valley Municipal Code (SVMC) Section 19.40.020.13; "All residential driveway and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material". A paving waiver can only be granted if, the structure you are proposing Is not going to require a driveway for daily use. — OWNER INFORMATION OWNER NAME: is SC Cr"LIZ PARCEL#: L{col LI. OS Db ADDRESS: 553 zi E Nkyyca kJ e. CITY: SpU 'av \I al 2L1J !\� STATE: 1/J I'( ZIP: 9 9 2_1 Z- 2('i2- PHONE: 92.(4 - 1 EJ'I3 FAX: CELL: EMAIL: PART II —DETAILS OF PAVING WAIVER 1. Do you have an existing garage for parking daily use vehicles? E YES ❑ NO Can -re{ p `� u 2. Is the proposed detached structure used for storage only? 4, YES IDNO %- 69(cE•�ta� 3. Do you plan on using the detached structure to park vehicles? E' YES ❑ NO If yes, then what type of vehicles? 90 4. Do you plan to conduct a business from proposed detached structure? ❑ YES E NO If so, what is the nature of your business? PART III —AUTHORIZATION I,(PRINT NAME) j o SL e J Z— owner, hereby confirm that theinformation provided on this form is true and correct. I acknowledge that any change in the foregoing conditions, could require the City to impose paving requirements. I further agree to report any change in these conditions to the Spokane Valley Community Development Department, Planning Division, within 30 days. Owner Signature - tJ—/7 Date 'PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT DIRECTOR AND FIND THE REQUEST IS GRANTED AT a ,cT03 K occt NVL - SAID ADDRESS FOR PERMIT #: II DU I flS c,A-lco" 3 J l ? Zc)t Planning Division Staff Signature Date Created 6/27/11 Page 1 of 1 Sc1T1®11CILllIL� e Valley Community Developrtient DepartmentL�I �f Permit Center CSV PERMIT ( 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 JUL 0 1 Tel: (509) 720-2540 I Fax: (509) 688-0037 Project # 17— (9 Y. permitcenter©spoka v II r - r i.t Submittal # t `L) (Staff Use Only) ENTER PERMIT NUMBER: 314 PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ❑ NEW CONSTRUCTION 0 ADDITION/REMODEL EL ACCESSORY BUILDING Ltl DECK❑ OTHER p SITE ADDRESS: 0 503 L KJoit- - ASSESSORS PARCEL NO.: Li 50-1 y . (ASOLEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: ADDRESS: ?503 a No(z CITY: PHONE: seo1u-N1 _ V ictir �Y 9ZL-7Pti3 STATE: Ver ZIP: 95zjz FAX: CELL: CONTACT NAME: ,LSC PHONE: FAX: CELL: CONTRACTOR NAME: Z\ E6-L.E1L LUyvk MAILING ADDRESS: (02o Irvt— ,.A3 CITY: SP(-, ubil-Nir/ STATE: 11/4l -y- ZIP: q%7---( 0 PHONE: 509 - Li Uri - t keel (PO FAX: CELL: CONTRACTOR LICENSE No.: tee) ttafL'� 313tXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND IINDICATE USE & PROPOSED USE: t IJSTA't� . 3o,c 2,2_1±-k - 9Q Ltj, C2 -)u I/06— ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Pea • 4Dimensions: q _ 30 3z No. of Stories: \ Total Habitable Space: N11A- Main Floor SQ FT: -Aa- Upper Floor SQ FT: /3IA' Unfinished Basement SQ FT: Al\et- Finished Basement SQ FT: i•-4/4- -4t4GI Garage arage SQ FT: 9(40 0 (L-- Deck/Covered Patio SQ FT: tJt()-- Impervious Surface Area: 30% Slopes on Property: F/(R- No. of Bedrooms: 1J\ A- Construction Type: POt_ft Heat Source: 1../ (I- Sewer or Septic: r./1/f TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: Y— l —$`c� 0 0 Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc Spollane #Va11ey® Target Date sheet For City Use Only PLUS Project _/ ( �VC Project Address &JOS L, 1' 100- 11703 E Sprague Ave Suite 8-3 1 Spokane Valley WA 99206 509.720-5240 1 Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days befbrc they can look at your new or revised information ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us ij you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or snail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 PLANNING DEPT. APPROVED Boa >JORA 5 31er .7E(Epl, owe Pole L 1-1 4--i