Loading...
2011, 04-07 Permit App: 11000816 Pole BldgProject Number: 11000816 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/7/2011 Page 1 of 2 Project Information: Permit Use: 30 X 30 POLE BLDG FOR STORAGE Contact: SALEE, TRACI Address: 8509 E NORA AVE C - S - Z: SPOKANE VALLEY, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 921-1336 Group Name: Project Name: Site Information: Plat Key: 000000 Name: Range District: Nort Parcel Number: 45074.0507 Block: SiteAddress: 8509 E NORA AVE Location:: CSV Lot: Owner: Name: SALEE, TRACI Address: 8509 E NORA AVE SPOKANE VALLEY, WA 99212 Zoning: R-3 SF Res District Water District: 100 SPO CO WATER DIST#3A Hold: ❑ Area: 9,855 Sq Ft Width: 0 Nbr of Bldgs:. 0 Nbr of Dwellings: 0 Depth: 0 Right Of Way (ft): 0 Review Information: Review Building Plan Review Released By: Originally Released: Landuse/Zoning/HE Conditions 4/7/2011 By: tmelbourn Released By: Originally Released: 4/5/2011 By: tschmidt Permits: Operator: jmm Printed By: jmm Print Date: 4/7/2011 Project Number: 11000816 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/7/2011 Page 2 of 2 Building Permit Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes So Ft Valuation Su Ft Valuation POLE BDLG U-1 VB PLAN 900 $17,100.00 900 $17,100.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 900 $17,100.00 900 $17,100.00 Units Unit Desc Fee Amount 1 SELECT $293.25 1 SELECT $73.31 1 SELECT 54.50 Permit Total Fees: 5371.06 Notes: Pole bldg Not to be used for storage of on -road vehicles. Paving not required at this time. If bldg used for storage of on -road vehicles then driveway will need to be paved as per SVMC 19.40.020. Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $371.06 $371.06 $73.31 5297.75 $371.06 $371.06 573.31 5297.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 4/7/2011 Community Devel__opomenfitDepartment— Permit rin.PIVPD **(Acme 11703 East Spragug-AiuellSSuite 8� SP �� SpokanelValley, WA, ys2Cc��17 CENTER okane Tel: (509,) 688-0135! valley•• Fax: itc(5t) 688-Doka 1D _ get Dermitce terCmsookan 8a g2 its_ prOlect RESIDENTIAL CON`` ROCTI PER I/ A LICATION 0 NEW CONSTRUCTION 0 A 6DU TII ON/REMODEL I] ACCESSORY BUILDING 0 OTHER j, 0 DECK SITE ADDRESS: 8509 E Nora Spokane Valley ,Wa ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: Pole Barn BUILDING OWNER NAME: Traci Salee NAME: Traci Salee ADDRESS: 8509 E Nora cm: Spokane Valley STATE: WA Zip: 99212 PHQNE: 509-921-1336 FAX: CELL: 509-720-3212 CONTACT NAME: Traci Salee PHONE: 509-921-1336 FAX: CELL: 509-720-3212 CONTRACTOR NAME: Traci Salee MAILING ADDRESS: 8509 E Nora Spokane Valley ,Wa cm: Spokane Valley STATE: WA zip: 99212 PHONE: 509-921-1336 FAX: CELL: 509-720-3212 CONTRACTOR LICENSE No.: EXPIRES: Cm BUSINESS LICENSE NO.: iDESCRI@EbtHEj COPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: a (-e - S) {09e ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions:, 3Q 1\ i() No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Q Garage SQ FT:n 1 �6K— Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: 0 Construction Type: Heat Source: Sewer or Septic: Q TOTAL COST OF PROJECT: $ 4 Q O, 0 PISCLAIMF$ The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed, Effective -Oct o r 2007 Page 1 of 2 P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc Spokane Valley° For City Use Only. PLUS Project -Number /1-.i] C$ / Co Project Address'5'sZ, ci' rr 'l"-) o 11703 E Sprague Ave Suite B-3 • Spokane, Valley -WA 99206 • 509.688.0036 • Fax: 509.688.0037 4 permitcenter®spokaneyalley.org.•• As. part of our on-going commitment to customer service duringthe. review process Of .yo'ur project application, we are providing you with,a TARGET DATE for the initial technical. application review.,lf for any, reason we cannot meet this date, we will contact you with a revised target date: • Your application review TARGET DATE is, The TARGET DATE is the date we estimate your project application will have had. its initial: technical review. It is not the date for approval.or permit issuance. Tipsfor a Smoother Project Application Review i Submit complete, accurate plans and document's. . Extra time may be required for re -submittals as project applicaiion reviewers may be several days before they cavi look at .1;01E1 -Yew ar revised,informatioii . i • Designate a specific contact person to communicate with the City. . . While the person designated as the applicant's contact person with the City can be changed, ane individual• with the erperti.se for dealing with reviewer comments would be the best choice for the entire review process. ,: i Call staff regarding the status of your project only after the target date shown at the:top of the'page: : s . ' Although you should be contacted on or by the target date, please feel free to contact us iif i-oinhaven't heard from us by your target date. Staf mai; contact you befcn-e the, target datell tin. initial'teview is,eomplete. By following this procedure, you md/ save time and allow' the reviewers to.comp/ete'the work more expeditiously. vork on multiple applications and it - Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. ;This'means.all 61' th; required documents, as indicated on your Pre=Application Checklist have been submitted ':or, have been -.approved: for. deferred • submittal. This does not prevent technical staff from requesting additional information asa result of their technical review. 2. Quality Check. The next step in'the process is a quality `check to make sure that the application is reviewable and free from substantive Claws that would prevent technical stall frons completing.the technical review,once:it is'started.' When . this step is complete, your application will be routed to the appropriate staff and•remain in thei•r; review; queue. until_ it comes tip for review.. .. . . 3. Technical Compliance. Once an application is administratively,complete; it is routed to technical staff for'compliance ' review. Depending on the type'of project, technical staff may include .multiple, You'should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is:complete. • 4. Permit Issuance. When the technical compliance review of the,application is complete, including' any subsequent • ' rd - submittals, each reviewer will approve their section of the application' and route it to.the Permit Center. When all 'sections of the application are received, a Permit Specialist will process -the application and contact the person specitied'on your application for permit pick-up. Information regarding fees and pie -,construction meetings (if required)'will be provided by the Permit Specialist at that time. •. • WHITE -APPLICANT PINK -BUILDING FILE REV 9/07 PLANNING DEPT. PPROVED BY. DATE `�/5/// 1044 E- - Ni SheA n RECEIVED CSV PERMIT CENTE1-t APR 0u5, Project #J (ra� Name Submittal # ); i i SSafi- 73f+ E nor°,