2011, 04-07 Permit App: 11000816 Pole BldgProject Number: 11000816 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/7/2011 Page 1 of 2
Project Information:
Permit Use: 30 X 30 POLE BLDG FOR STORAGE Contact: SALEE, TRACI
Address: 8509 E NORA AVE
C - S - Z: SPOKANE VALLEY, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 921-1336
Group Name:
Project Name:
Site Information:
Plat Key: 000000 Name: Range
District: Nort
Parcel Number: 45074.0507 Block:
SiteAddress: 8509 E NORA AVE
Location:: CSV
Lot:
Owner: Name: SALEE, TRACI
Address: 8509 E NORA AVE
SPOKANE VALLEY, WA 99212
Zoning: R-3 SF Res District
Water District: 100 SPO CO WATER DIST#3A Hold: ❑
Area: 9,855 Sq Ft Width: 0
Nbr of Bldgs:. 0 Nbr of Dwellings: 0
Depth: 0 Right Of Way (ft): 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
4/7/2011 By: tmelbourn
Released By:
Originally Released: 4/5/2011 By: tschmidt
Permits:
Operator: jmm Printed By: jmm
Print Date: 4/7/2011
Project Number: 11000816 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/7/2011 Page 2 of 2
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes So Ft Valuation Su Ft Valuation
POLE BDLG U-1 VB PLAN 900 $17,100.00 900 $17,100.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 900 $17,100.00 900 $17,100.00
Units Unit Desc Fee Amount
1 SELECT $293.25
1 SELECT $73.31
1 SELECT 54.50
Permit Total Fees: 5371.06
Notes:
Pole bldg Not to be used for storage of on -road vehicles. Paving not required at this time. If bldg used
for storage of on -road vehicles then driveway will need to be paved as per SVMC 19.40.020.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $371.06 $371.06 $73.31 5297.75
$371.06 $371.06
573.31 5297.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 4/7/2011
Community Devel__opomenfitDepartment—
Permit rin.PIVPD
**(Acme
11703 East Spragug-AiuellSSuite 8�
SP �� SpokanelValley, WA, ys2Cc��17 CENTER
okane Tel: (509,) 688-0135!
valley•• Fax: itc(5t) 688-Doka 1D _ get
Dermitce terCmsookan 8a g2 its_
prOlect
RESIDENTIAL CON`` ROCTI PER I/ A LICATION
0 NEW CONSTRUCTION 0 A
6DU TII ON/REMODEL I] ACCESSORY BUILDING
0 OTHER
j,
0 DECK
SITE ADDRESS: 8509 E Nora Spokane Valley ,Wa
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: Pole Barn
BUILDING OWNER NAME: Traci Salee
NAME: Traci Salee
ADDRESS: 8509 E Nora
cm: Spokane Valley
STATE: WA Zip: 99212
PHQNE: 509-921-1336
FAX:
CELL: 509-720-3212
CONTACT NAME: Traci Salee
PHONE: 509-921-1336
FAX:
CELL: 509-720-3212
CONTRACTOR NAME: Traci Salee
MAILING ADDRESS: 8509 E Nora Spokane Valley ,Wa
cm: Spokane Valley
STATE: WA
zip: 99212
PHONE: 509-921-1336
FAX:
CELL: 509-720-3212
CONTRACTOR LICENSE No.:
EXPIRES: Cm BUSINESS LICENSE NO.:
iDESCRI@EbtHEj COPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
a (-e - S) {09e
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:
Dimensions:,
3Q 1\ i()
No. of Stories:
Total Habitable
Space:
Main Floor SQ FT:
Upper Floor SQ FT:
Unfinished Basement SQ
FT:
Finished Basement SQ
FT: Q
Garage SQ FT:n
1 �6K—
Deck/Covered Patio SQ
FT:
Impervious Surface
Area:
30% Slopes on
Property:
No. of Bedrooms: 0
Construction Type:
Heat Source:
Sewer or Septic: Q
TOTAL COST OF PROJECT: $ 4 Q O, 0
PISCLAIMF$
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed,
Effective -Oct o r 2007 Page 1 of 2
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
Spokane
Valley°
For City Use Only.
PLUS Project -Number /1-.i] C$ / Co
Project Address'5'sZ, ci' rr 'l"-) o
11703 E Sprague Ave Suite B-3 • Spokane, Valley -WA 99206 •
509.688.0036 • Fax: 509.688.0037 4 permitcenter®spokaneyalley.org.••
As. part of our on-going commitment to customer service duringthe. review process Of .yo'ur project
application, we are providing you with,a TARGET DATE for the initial technical. application review.,lf for
any, reason we cannot meet this date, we will contact you with a revised target date:
• Your application review TARGET DATE is,
The TARGET DATE is the date we estimate your project application will have had. its initial: technical
review. It is not the date for approval.or permit issuance.
Tipsfor a Smoother Project Application Review
i Submit complete, accurate plans and document's. .
Extra time may be required for re -submittals as project applicaiion reviewers
may be several days before they cavi look at .1;01E1 -Yew ar revised,informatioii .
i • Designate a specific contact person to communicate with the City. . .
While the person designated as the applicant's contact person with the City can be changed, ane individual• with the
erperti.se for dealing with reviewer comments would be the best choice for the entire review process. ,:
i Call staff regarding the status of your project only after the target date shown at the:top of the'page: : s . '
Although you should be contacted on or by the target date, please feel free to contact us iif i-oinhaven't heard from us
by your target date. Staf mai; contact you befcn-e the, target datell tin. initial'teview is,eomplete. By following this
procedure, you md/ save time and allow' the reviewers to.comp/ete'the work more expeditiously.
vork on multiple applications and it -
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. ;This'means.all 61' th; required
documents, as indicated on your Pre=Application Checklist have been submitted ':or, have been -.approved: for. deferred •
submittal. This does not prevent technical staff from requesting additional information asa result of their technical review.
2. Quality Check. The next step in'the process is a quality `check to make sure that the application is reviewable and free
from substantive Claws that would prevent technical stall frons completing.the technical review,once:it is'started.' When .
this step is complete, your application will be routed to the appropriate staff and•remain in thei•r; review; queue. until_ it
comes tip for review.. .. . .
3. Technical Compliance. Once an application is administratively,complete; it is routed to technical staff for'compliance '
review. Depending on the type'of project, technical staff may include .multiple, You'should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is:complete.
•
4. Permit Issuance. When the technical compliance review of the,application is complete, including' any subsequent • '
rd -
submittals, each reviewer will approve their section of the application' and route it to.the Permit Center. When all 'sections
of the application are received, a Permit Specialist will process -the application and contact the person specitied'on your
application for permit pick-up. Information regarding fees and pie -,construction meetings (if required)'will be provided by
the Permit Specialist at that time. •.
•
WHITE -APPLICANT PINK -BUILDING FILE
REV 9/07
PLANNING DEPT. PPROVED
BY.
DATE `�/5///
1044
E- -
Ni
SheA
n
RECEIVED
CSV PERMIT CENTE1-t
APR 0u5,
Project #J (ra�
Name
Submittal #
); i i SSafi-
73f+
E
nor°,