2011, 08-31 Permit App: 11002621 GarageProject Number: 11002621 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/31/2011 Page 1 of 2
Project Information: ,
Permit Use: CONSTRUCT NEW 24 X 40 DETACHED Contact: HAMMERS, RICHARD J & CHANTAL
RESIDENTIAL GARAGE Address: 8616 E NORA AVE
C - S - Z: SPOKANE, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 995-1571
Group Name:
Site Information: Project Name:
Plat Key: 000000 Name: Range
District: Nort
Parcel Number: 45074.0525 Block:
SiteAddress: 8616 E NORA AVE
Location:: CSV
Lot:
Owner: Name: HAMMERS, RICHARD J & CHANT
Address: 8616 E NORA AVE
SPOKANE, WA 99212
Zoning: UR -3.5 Urban Residential 3.5
Water District: 100 SPO CO WATER DIST#3A Hold: ❑
Area: 9,919 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Depth: 0 Right Of Way (ft): 0
Review Information: ,
Review
Building Plan Review
Released By:
Originally Released: 8/26/2011 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
See Conditions
Originally Released: 8/30/2011 By: mpalaniuk
Permits:
Operator: JD Printed By: JD
Print Date: 8/31/2011
Project Number: 11002621 Inv: 7
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/31/2011 Page 2 of 2
Contractor: OWNER
Building Permit
Firm: OWNER
Phone: (000) 000-0000
Building Characteristics
Group: U-1 Type: VB
Total Area 960
Building Height 20
Stories 1
This Application: Total Project:
Description Grp Type Notes Sci Ft Valuation Su Ft Valuation
POLE BDLG U-1 VB DETACHED 960 $18,240.00 960 $18,240.00
POLE
BUILDING
/ GARAGE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 960 $18,240.00 960 $18,240.00
Units Unit Desc Fee Amount
1 SELECT $307.25
1 SELECT $76.81
1 SELECT $4.50
Permit Total Fees: 5388.56
Notes•
The City of Spokane recognizes the proposed structure will not have access to public right of way at the
south boundary. Approval of this permit in no way implies or acknowledges the applicants right to
access the building from the south boundary.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $388.56 $388.56 $76.81 $311.75
$388.56 $388.56
576.81 5311.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD
Print Date: 8/31/2011
Spokane
Valley.
.ommunity Development Department
ermit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-2540
Fax: (509) 688-0037
permitcenter@ spoka n eva I ley. orq
(Staff Use Only)
PERMIT NUMBER: I ( 0_1
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION 0 ADDITION/REMODEL
❑ DECK ❑ OTHER
SITE ADDRESS:8616 E. NORA AVE
® ACCESSORY BUILDING
ASSESSORS PARCEL NO.:45074 0525
GARDENS
LEGAL DESCRIPTION:LOT 2 BLK 6 VISTA
BUILDING OWNER NAME:RICHARD J HAMMERS AND CHANTAL HAMMERS
NAME:RICK HAMMERS
ADDREss:8616 E. NORA AVE
Cm:SPOKANE VALLEY
PHONE:509-995-1571
STATE:WA
FAX:
CELL:
CONTACT NAME:SEE ABOVE
PHONE:
FAX:
CELL:
CONTRACTOR NAME:SELF
MAILING ADDRESS:SEE ABOVE
CITY:
STATE: ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
ADDITION OF OUTBUILDING (POLE BUILDING) TO BE USED AS WORKSHOP AND GARAGE.
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:20'
RECEIVED
rqV( PFRPAIT r^CNITro
No. of Stories:1.5
Total Habitable Space:N/A
Project # AI I
Upper Floor SQ FT:N/A
Name
m99212—
Garage SQ FT:480
submittal # j
Impervious Surface
Area: /0/14
CELL:
CONTACT NAME:SEE ABOVE
PHONE:
FAX:
CELL:
CONTRACTOR NAME:SELF
MAILING ADDRESS:SEE ABOVE
CITY:
STATE: ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
ADDITION OF OUTBUILDING (POLE BUILDING) TO BE USED AS WORKSHOP AND GARAGE.
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:20'
Dimensions:24W x40'D
No. of Stories:1.5
Total Habitable Space:N/A
Main Floor SQ FT:960
Upper Floor SQ FT:N/A
Unfinished Basement SQ
FT:WA
Finished Basement SQ
FT:WA
Garage SQ FT:480
Deck/Covered Patio SQ
FT:N/A
Impervious Surface
Area: /0/14
30% Slopes on
Property:WA
No. of Bedrooms:N/A
Construction Type:POLE
Heat Source:N/At
(Seweiker Septic:N/A
TOTAL COST OF PROJECT: $15,000
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling, the dwelling Is/will
be served by potable water. 2) Ownership of thus City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in hill compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required to . submitted and subsequently approved before this application can be processed.
Signature
Date: 6%-aL-2A1(
Updated 1-11-11 Page 1 of 1
C:\Users\Rick\Documents\SketchUP Projects Home Property \Building_Permit_-_Residential_11-11-11_08-26-2011.docx
•
Spokane
Valley®
Target Date sheet
For City Use Only
PLUS Project 11' PICC
Project Address
8091 r Mofi AD .
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.720-5240 1 Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.�/� r /
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. 11 is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may he required Jim re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
7 Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, ane individual with the expertise
for dealing with reviewer comments would be the best choice fru the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By fiillowing this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to teclmical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial teclmical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Pemiit Specialist will process the application and contact the person specified on your application for
permit pick-up. Infomation regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1
0
4
L
70.0001
141.000'
u, ylpo
5hc,
-0-10.000' --0'1
0.000
t
5.000'
24,000
20.000'
32.500'
000
24.000'
Outside ft»t.e.
.23.000'
�\IJ
28.000'
Ltf (070
30.000`
PLANNII\ki DEPT. APPR
M
LU
0