Loading...
2010, 09-02 Permit: 10002738 ReroofSpokane valley® PERMIT CENTER 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 I 1 Site Information Project Information Site Address: 9512 E NORA AVE Parcel Number: 45083.0435 Subdivision: Block: Lot: Zoning: R-3 SF Res District Owner: BRADLEY, T W & S Address: 9512 E NORA AVE SPOKANE VALLEY, WA 99206-4105 Building Inspector: NORTH Water Dist: MODERN Project Number: 10002738 Inv: 1 Issue Date: 09/02/2010 Permit Use: REROOF Applicant: ADAMS ROOFING & GENERAL CONT PO BOX 3522 SPOKANE WA 99220 Phone: (509) 747-7663 Contact: ADAMS ROOFING & GENERAL CONT PO BOX 3522 SPOKANE WA 99220 Phone: (509) 747-7663 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: , Permits Building Permit Contractor: ADAMS ROOFING & GENERAL CONT REROOF R-3 VB 0 RESIDENTIAL PERMIT FEE - $111 25 • License #: ADAMSRG9I2NP Total Value: $5,000.00 FOR BUILDING INSPECTIONS CALL (509) 688-0054. WSBCC SURCHARGE 54 50 Total Permit Fee: $115 75 Payment Summary Total Fees AmountPaid AmountOwing $115.75 $115.75 $0.00 Tran Date Receipt # Payment Amt 09/02/2010 24108 Processed By: Main. Jodi L Printed By: MORRIS, HEATHER Page 1 of 1 $115.75 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and pnor to occupancy and/or use. All permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a pernit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Pemits and Inspections for eledncal winng, Stale Department of Labor Pernsts and inspections for Sewer Connection. Spokane County Unties Division And Industries 324-2640 4773604 Penns and inspections for on-site septic systems, Spokane Regional Fire spnnkier and alarm systems and pnvate access road Inspections. Spokane Valley Health Distnd 324-1560 Fire Department 892-4122 State law RCW 19 122 requires that pnor to any excavation the -CALL BEFORE YOU DIG' center must be notified, Call before you dig at least 2 working days in advance. 456-6000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may'tie obtained.for half the permit fee based on the value of the remainder of the work to finish the original permit. 1 /• `• 2 ` � __1 = \l r1 All refund requests must be made in writing:by the origlnal•permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date 1 City of Spokane Valley Building Dept Receipt Receipt Number: 24108 Customer Number Projects Miscellaneous Items Full Project Nbr Inv Nbr Fee Amt L Liv Amt - Owing PAID Pmt 10002738 1 $115.75_. _ $115.75,11___$115.75i $115.75 i Total: $115.75.! ; . _ _$115.75 , f."—_,$1,15.75.1 $115.75 Total PAID: $115.75 Tender .Type Check Acct Balance CC Nbr Exp Date; TENDERED iVISA ' t xxxxxxxxxxxx5846 1 06/2012 115.75 Payer_ Total TENDERED: 115.75 Over / (Short) Change Notes: Tran Date / Time: 09/02/2010 10:30:27 AM By: HMORRIS Logon User: BldgCounter Station: CX_SV00014A Override By: $0.00 $0.00 Printed: 09/02/2010 10:30:28 AM Page 1 of 1